- DHW heating starts when tank temperature falls below the set DHW temperature, if the time switch enables tank heating.
- Boiler water is raised to the set DHW temperature plus 20 K.
- The tank primary pump starts once boiler water is 7 K above the actual DHW temperature.
- If absolute priority is enabled, heating circuit pumps M2 and M3 are switched off and mixing valves close.
- If modulating priority is enabled, pumps M2 and M3 keep running and mixing valves close only far enough to reach the tank heating boiler water temperature.
Timings and thresholds
| Item | Value |
|---|---|
| Boiler water target above set DHW temperature | +20 K (36 F) |
| Boiler water lead before tank primary pump starts | 7 K (12.6 F) |
Applies to: Single boiler system with Therm-Control
Models
Vitorond 200 VD2A 125 to 270
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Vitorond 200 VD2A Technical Data Manual, p. 19. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.