Viessmann · Boiler · Cooling
Cooling operation sequence
What happens, in order
- Cooling operation actuates the switch-over valve to cooling.
- Heating operation is disabled; hot water preparation still runs.
- Refrigerating machines start if required by a heating circuit or when the temperature exceeds the Installation/T-Return Cooling value.
- Heating circuits are controlled to the Heating circuit x/T-Flow Cooling temperature.
- If the MF function 'cooling switch-over valve' is active, the cooling circuit is hydraulically separated.
Applies to: Versatronik 200 System Control, cooling operation
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Versatronik 200 manual, p. 68. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.