Viessmann · Boiler · Other
Combustion air demand sequence
What happens, in order
- Common supply temperature drops below set point. The Versatronik 300 sends a set point demand to the first boiler and the AUX output turns on.
- The AUX output triggers the combustion or exhaust air system.
- The Versatronik 300 waits for the BMS or mechanical feedback on the INT input before the boilers receive heat demand.
- If the combustion air signal is not sensed within the time limit, the control gives a fault output.
Timings and thresholds
| Item | Value |
|---|---|
| Combustion air input signal timeout | 60 minutes (can be changed from factory value) |
Applies to: Versatronik 300 with combustion air interlock
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Versatronik 300 Cascade Control V1.4 manual, p. 23. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.