Viessmann · Boiler · Other
Changing the heating circuit configuration during operation
What happens, in order
- Press and hold the two marked keys together on the remote control for about 4 sec.
- Use the arrow keys to select heating circuit 1 ("H 1"), heating circuit 2 ("H 2") or heating circuit 3 ("H 3").
- Press OK to confirm. The heating system operating state is transferred.
- Wait while the display segments rotate; this can take up to 5 min.
- If the heating circuit assignment is cancelled later, set coding address A0 for that heating circuit at the control unit back to 0.
Timings and thresholds
| Item | Value |
|---|---|
| Hold keys to enter configuration | approx. 4 sec |
| Display segment rotation after confirming | up to 5 min |
Codes you may see during this
Applies to: Vitotrol 200A, up to 2 remote controls per boiler control unit
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Vitotrol 200A installation, operating and service instructions, p. 8. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.