Viessmann · Boiler · Other
Cascade control, conventional boiler strategy 1 (code 3C:1)
What happens, in order
- Start an extra boiler only when the maximum output of all active burners cannot reach the set supply temperature.
- Start the next boiler in sequence when the starting integral exceeds the limit set at coding address 45.
- Shut a boiler down when the remaining boilers can meet the required output without the boiler started last.
- Shutdown is controlled by the output statement (code 3D:1). Goal: fewest boilers active.
Codes you may see during this
3C:1; 3D:1; 45
Applies to: Cascade systems
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Vitotronic 200 and 300-K Installation and Service Instructions, p. 81. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.