What happens, in order
- Aim run as many boilers as possible at the lowest output, to get the condensing effect and long burner run times.
- Start an extra boiler starts when the current demand can be covered by the active boilers plus the next boiler in the sequence.
- Shutdown the shutdown integral is checked against the limit at coding 46 (Cascade group). When exceeded, the boiler started last shuts down.
- Example in the manual two modulating boilers, each 100% rated output with base load set to 33%.
Applies to: Cascade control unit, condensing boilers
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Vitotronic 300 GW6B installation and service instructions, p. 74. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.