Viessmann · Boiler · Ignition
Burner program sequence of operation (startup)
What happens, in order
- Phase 0 standby. Gas valve and blower are off until a call for heat.
- Phase 1 blower stand-still check. Blower speed must be below 300 rpm within 51 seconds.
- Phase 2 pre-purge speed test. Controller checks blower max rpm with fan speed controller.
- Phase 3 pre-purge. Runs on the programmed timing; fan speed must be within the requested range.
- Phase 4 pre-ignition. Ignition spark starts and is controlled.
- Phase 5 ignition and flame stabilization. Gas valve opens during the 4.5 second safety timing. Flame must be detected; the phase ends in under 1.5 seconds once flame is seen. After 3 failed trials the burner locks out and needs manual reset.
- Phase 6 modulation or calibration. Modulation release comes after the 4.5 second stabilization. Forced shutdown after 24 hours of continuous operation. Controller may start automatic calibration.
Timings and thresholds
| Item | Value |
|---|---|
| Blower stand-still check | below 300 rpm within 51 seconds |
| Safety timing, gas valve open | 4.5 seconds |
| Flame detected to phase end | under 1.5 seconds |
| Ignition trials before lockout | 3 |
| Forced shutdown | after 24 hours continuous operation |
Applies to: Burner startup
Models
B2HB 45B2HB 57B2HB 160B2HB 199
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Vitodens 200-W B2HB service manual, p. 93. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.