Viessmann · Boiler · Heating

Boiler cascading (adding and removing boilers)

Versatronik 300

What happens, in order

  1. Add a boiler when the common supply or LLH temperature is more than the adjustable offset below set point.
  2. Add a boiler when average modulation of active boilers exceeds the maximum average modulation.
  3. Remove a boiler when the common supply or LLH temperature is above set point by the adjustable amount.
  4. Remove a boiler when average modulation drops below the minimum average modulation.
  5. Boilers are brought on or off line no faster than one every 2 minutes under normal conditions.

Timings and thresholds

ItemValue
Stage on or off interval2 minutes minimum under normal conditions
Add offset below set point5 (adjustable, units not printed)
Remove offset above set point5 (adjustable, units not printed)

Applies to: Versatronik 300 cascade staging

More Viessmann boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Versatronik 300 Cascade Control manual, p. 30. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.