Viessmann · Boiler · Heating
Boiler cascading (adding and removing boilers)
What happens, in order
- Add a boiler when the common supply or LLH temperature is more than the adjustable offset below set point.
- Add a boiler when average modulation of active boilers exceeds the maximum average modulation.
- Remove a boiler when the common supply or LLH temperature is above set point by the adjustable amount.
- Remove a boiler when average modulation drops below the minimum average modulation.
- Boilers are brought on or off line no faster than one every 2 minutes under normal conditions.
Timings and thresholds
| Item | Value |
|---|---|
| Stage on or off interval | 2 minutes minimum under normal conditions |
| Add offset below set point | 5 (adjustable, units not printed) |
| Remove offset above set point | 5 (adjustable, units not printed) |
Applies to: Versatronik 300 cascade staging
More Viessmann boiler sequences
- AUX output as combustion air function · Startup
- Boiler startup protection · Startup
- Commissioning assistant at first start-up · Startup
- Control commissioning start-up · Startup
- Initial start-up preparation · Startup
- Initial start-up sequence after installation · Startup
- Lighting and operating instructions · Startup
- Matching the control unit to a modulating burner · Startup
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Versatronik 300 Cascade Control manual, p. 30. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.