Trane sequences of operation
11 sequences for Trane equipment: what the unit does, step by step, with the timings. Pick the equipment type, then the mode.
Air handler (4)
Startup
- Modular blower run test mode
P0V0 modular blower
Heating
- Modular blower heat pump heating call (single and two-stage)
P0V0 modular blower
Cooling
- Modular blower cooling call (single and two-stage)
P0V0 modular blower
Other
- Modular blower EAC and humidifier timing
P0V0 modular blower
Furnace (6)
Heating
- First-stage gas heating
S8B1, S8X1, S8X2 - Heating call sequence of operation
UH1, DH1 - Heating sequence of operation
AUH1B - Second-stage gas heating (S8X2 only)
S8X2
Cooling
- Cooling and heat pump calls on S8 furnace control
S8B1, S8X1, S8X2 - Cooling fan-off delay
UH1, DH1
Heat pump (1)
Defrost
- Heat pump demand defrost
5TWR7 (XR/XV ComfortSeek)
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.