Modular blower EAC and humidifier timing

P0V0 modular blower

What happens, in order

  1. EAC relay closes about 2 seconds after the blower starts
  2. EAC relay opens when the blower motor stops
  3. HUM relay closes on any heat pump heating call about 1 second after the blower starts
  4. HUM relay opens when the heating call is removed

Timings and thresholds

ItemValue
EAC delayabout 2 s after blower starts
HUM delayabout 1 s after blower starts

Applies to: P0V0 modular blowers

Models

P0V0A000M30SCAP0V0B000M40SCAP0V0C000M50SCAP0V0D000M50SCA

More Trane air handler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Trane P0V0 modular blower installation 18-GE20D1-1E-EN (Nov 2021), Sequence of Operation pp.30-33. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.