Rinnai · Boiler · Other

Venting installation sequence

I-Series Plus

What happens, in order

  1. Decide the termination type horizontal or vertical, concentric, or twin pipe.
  2. Choose the wall or roof penetration location for each termination.
  3. Install the termination as described in this manual or the vent maker's instructions.
  4. Install the air and vent piping from the boiler to the termination.
  5. Slope the horizontal exhaust run back toward the boiler at 1/4 in. per foot. Do not slope the combustion air pipe toward the boiler.
  6. Install vent supports and brackets that allow for expansion movement, or per vent maker or code.
  7. Optional fit a vent screen or room air filter to the schedule 40 PVC combustion air and exhaust termination elbows.

Applies to: I-Series Plus venting

More Rinnai boiler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Rinnai I-Series Plus IP060160C installation and operation manual, p. 23. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.