Rinnai sequences of operation

13 sequences for Rinnai equipment: what the unit does, step by step, with the timings. Pick the equipment type, then the mode.

Air handler (6)

Heating

Cooling

Pump/purge

Other

Boiler (1)

Domestic hot water

Furnace (3)

Startup

Ignition

Standby/shutdown

Tankless water heater (3)

Pump/purge

Freeze protection

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.