Rinnai · Air handler · Heating

Heating call, single-stage thermostat

Canadian Hydronic Air Handler

What happens, in order

  1. Thermostat calls for heat and closes R to W2
  2. Hot water circulating pump is energized
  3. After a short delay the blower starts (R to G circuit)
  4. Hot water from the tankless unit or boiler is moved through the coil and blown into the ducts
  5. Thermostat is satisfied and the call for heat ends
  6. Blower keeps running for its off delay, then stops

Timings and thresholds

ItemValue
Blower on delay (default)5 s
Blower off delay (default)120 s

Applies to: Rinnai Canadian hydronic air handler (heat pump and A/C versions)

Models

Canadian air handler (supplement to the tankless / boiler manual)

More Rinnai air handler sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Rinnai Canadian Hydronic Air Handler Installation and Operation Manual (600000023), thermostat operation section. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.