- Power the boiler. The display shows SEt and the Maintenance Mode icon appears.
- Press the Settings menu button. The display shows nG.
- For natural gas, press Select to confirm nG and go to step 4. For propane, press up or down to show LPG, press Select, then go to step 4.
- The display shows PVC. For PVC venting, press Select and go to step 6. For PP venting, press up or down to show PP, press Select, then go to step 6.
- The display alternates between the gas setting and PVC/PP while Select and ON/OFF blink. Press Settings to go back to step 1, or press ON/OFF to accept.
- The display briefly shows 888 with a beep, then the controller turns off.
- Press On/Off to start the unit.
- If LPG was chosen, apply the supplied gas conversion label over the existing label on the left side of the boiler.
- If the altitude is above 2,000 ft (610 m), select the matching altitude and set other parameters per section 12.4.
Codes you may see during this
SEt nG LPG PVC PP 888
Applies to: I-Series Plus condensing combi boilers
More Rinnai boiler sequences
- Fill and deaerate the boiler during commissioning · Startup
- Normal ignition sequence · Startup
- DHW recirculation on a dedicated return line (flow check) · Domestic hot water
- DHW recirculation pump run logic (dedicated return mode) · Domestic hot water
- DHW recirculation with crossover valve and thermal bypass · Domestic hot water
- DHW run limit and heating restart · Domestic hot water
- Automated descaling flush sequence · Pump/purge
- Freeze protection operation · Freeze protection
Related
Rinnai error codes · Rinnai tips · Rinnai parts · All Rinnai sequences
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Rinnai I-Series Plus IP060160C installation manual, p. 66-67. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.