Rheem · Furnace · Startup

Condensate trap priming cycle

96V

What happens, in order

  1. On the first heat attempt, the trap is dry and the inducer pulls air through it.
  2. Condensate collects in the collector box, held there by the negative pressure while the inducer runs.
  3. When the water reaches the electronic water level sensor, the heat attempt ends.
  4. The inducer shuts off after post purge, which releases the negative pressure.
  5. The water falls into the trap and primes it. Up to four attempts may be needed.

Applies to: Condensate trap, first start or after a long off period

More Rheem furnace sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: 96V series installation instructions, p. 67. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.