Triple evacuation method (recommended)
What happens, in order
- Evacuate the system to 4000 microns and hold for 15 minutes.
- Break the vacuum with dry nitrogen and raise system pressure to 2-3 PSIG; hold for 20 minutes.
- Release the nitrogen.
- Evacuate to 1500 microns and hold for 20 minutes.
- Break the vacuum again with dry nitrogen and raise pressure to 2-3 PSIG; hold for 20 minutes.
- Evacuate until below 500 microns and hold for 60 minutes.
Timings and thresholds
| Item | Value |
|---|---|
| Evacuate to 4000 microns hold | 15 minutes |
| Nitrogen pressure hold (first) | 20 minutes at 2-3 PSIG |
| Evacuate to 1500 microns hold | 20 minutes |
| Nitrogen pressure hold (second) | 20 minutes at 2-3 PSIG |
| Final evacuation below 500 microns hold | 60 minutes |
Applies to: Refrigerant side evacuation
Models
DX6VSDZ6VSDZ6VSA
More Daikin heat pump sequences
- 3-minute standby before restart · Startup
- Commissioning and test run · Startup
- Five-step commissioning set-up · Startup
- Preheating control before inverter start (open phase) · Startup
- System start-up procedure with evacuation and checks · Startup
- 3-D airflow auto-swing order · Other
- Commissioning sequence in the app · Other
- Compressor frequency control priority · Other
Related
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Daikin DX6VS/DZ6VS installation manual (3P731493-1), p. 19. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.