Daikin · Heat pump · Startup
Preheating control before inverter start (open phase)
What happens, in order
- Preheat is requested by the indoor unit before inverter operation starts on the listed models.
- Start preheat when the outdoor temperature is below the ON threshold A and the discharge pipe temperature is below outdoor temperature plus B.
- Stop preheat when the outdoor temperature is above threshold C or the discharge pipe temperature is above outdoor temperature plus D.
Applies to: RXM18/24WVJU9 and RXM18/24VVJU outdoor units
Models
RXM18WVJU9RXM24WVJU9RXM18VVJURXM24VVJU
More Daikin heat pump sequences
- 3-minute standby before restart · Startup
- Commissioning and test run · Startup
- Five-step commissioning set-up · Startup
- System start-up procedure with evacuation and checks · Startup
- Triple evacuation method (recommended) · Pump/purge
- 3-D airflow auto-swing order · Other
- Commissioning sequence in the app · Other
- Compressor frequency control priority · Other
Related
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Daikin FTXM-W/V service manual, p. 76. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.