Commissioning sequence in the app
What happens, in order
- Add thermostat to job by scanning the 2D bar code or entering DKN(S).
- Verify internet and Wi-Fi connection.
- Complete Cloud Commissioning and confirm access on thermostat.
- Verify connected equipment.
- Select and send system profile to thermostat.
- Run system test and enter the actual charge weighed in.
- Run system charge verification.
- Complete setup and share the commissioning report.
Codes you may see during this
Applies to: Daikin One Touch thermostat
More Daikin heat pump sequences
- 3-minute standby before restart · Startup
- Commissioning and test run · Startup
- Five-step commissioning set-up · Startup
- Preheating control before inverter start (open phase) · Startup
- System start-up procedure with evacuation and checks · Startup
- Triple evacuation method (recommended) · Pump/purge
- 3-D airflow auto-swing order · Other
- Compressor frequency control priority · Other
Related
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Daikin One Touch Smart Thermostat Training Module TRC-10, pp. 24-32. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.