Navien · Furnace troubleshooting

Vent termination placement

NPF

What is going on

The termination must be at least 12 in (300 mm) above ground, at least 12 in above the highest expected snow level, or meet local code, whichever is greater. Keep intake and exhaust terminations clear of obstructions.

Likely causes

  • Termination too close to snow level or ground
  • Obstruction near the terminal

Check in this order

  1. Confirm the termination height is at least 12 in above ground and above the expected snow level.
  2. Use the greater of that height or the local code requirement.
  3. Keep the exhaust termination at least 12 in from the intake air inlet in a non-concentric layout.
  4. Keep at least 12 in clearance from any obstruction above, below, left or right of the terminal.
  5. Keep the intake pipe as short as practical.
  6. Do not terminate above a sidewalk or driveway in the restricted case noted on page 66.

Applies to: Direct and non-direct vent termination

More furnace guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NPF installation and operation manual, p. 72. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.