Navien · technician tips

Navien service menus, test modes and resets

548 tips for air conditioner, air handler, boiler, combi boiler, furnace: access codes, button combinations, test modes and the resets you need at the appliance.

Jump to: Access & passwords (22) · Button combinations (22) · Service & test modes (40) · Reset & cancel (40) · Settings shortcuts (55) · Commissioning (134) · Other (235)

Access & passwords

Installer and service menu codes, and how to get into them.

Admin and User access levels

Boiler · Modbus/BACnet Gateway

Admin has full access. User can view gateway information but cannot make changes or restart the gateway.

Applies to: Gateway web access

Source: Modbus/BACnet Gateway Start-up Guide, p. 22. Written in our own words; check the manual for your exact model.

Change installer parameters (password 1234)

Boiler · Navien NHB-H

Installer parameters sit behind a password in the service menu.

  1. Hold Back + Menu for 3 seconds and open 3. Parameter Settings.
  2. Enter the factory password 1234.
  3. Edit the value; it saves after 10 seconds with no input.

Applies to: Navien NHB-H condensing boilers: NHB-150H, NHB-110H, NHB-080H, NHB-055H

Source: Navien NHB-H Installation and Operation Manual, 11.13.3 Setting the Operation Parameters, p.111-114. Written in our own words; check the manual for your exact model.

Default gateway IP and Wi-Fi AP addresses

Boiler · Modbus/BACnet Gateway

Factory defaults for reaching the gateway locally.

  1. Ethernet default IP is 192.168.1.24 with mask 255.255.255.0.
  2. Wi-Fi access point default address is 192.168.50.1.
  3. Wi-Fi access point default security key is Navien12345.

Applies to: Gateway factory defaults

Source: Navien Modbus/BACnet gateway installation and operation manual, p. 10-12. Written in our own words; check the manual for your exact model.

Default web login

Boiler · Modbus/BACnet Gateway

Factory login for the gateway web app. Change it if the gateway is secured with passwords.

  1. Username: admin.
  2. Password: admin.

Applies to: Gateway web app login

Source: Navien Modbus/BACnet gateway installation and operation manual, p. 12. Written in our own words; check the manual for your exact model.

Open parameter settings

Boiler · NCB700

Parameters must be set by a qualified professional who understands the boiler system. Wrong settings can cause property damage or injury. The factory default password is 1234.

  1. Press the Back and Menu buttons together for 3 seconds.
  2. Select 3. Parameter Settings.
  3. Turn the Command dial to change each digit, then press it to enter the password.
  4. Turn the Command dial to pick a parameter or change its value, then press to confirm.
  5. Press Back to return to the previous screen.

Applies to: Parameter settings menu

Source: Navien NCB700 installation & operation manual, p. 126-127. Written in our own words; check the manual for your exact model.

Open the service / installer menu (Back + Menu)

Boiler · Navien NHB-H

Hidden advanced menu with Service Status Info, Input/Output Status and Parameter Settings.

  1. Hold Back and Menu together for 3 seconds.
  2. Choose an entry with the Command dial.
  3. Press Back to return.

Applies to: NHB-055H, NHB-080H, NHB-110H, NHB-150H

Source: Navien NHB-H Installation and Operation Manual, 11.13 Accessing Advanced Menu Items, p.109-111. Written in our own words; check the manual for your exact model.

Parameter password and lockout

Boiler · NCB700

Parameter menus are password protected. Factory password is 1234. Too many wrong tries or inactivity drops the boiler back to Normal mode.

  1. Enter the password using the Command dial.
  2. After 10 wrong attempts, or 5 minutes with no input, the boiler returns to Normal mode.
  3. To go back to the previous mode, press the Reset button.
  4. Change the password under Advanced menu item 30 if needed.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 129. Written in our own words; check the manual for your exact model.

Stand By mode and child lock

Boiler · CH-ASME

Stand By stops heat demand when heat is not needed. Lock is a child-safety feature that stops settings from being changed.

  1. Stand By: tap Stand By to turn it on (icon shows) or off (icon clears and the display returns to normal).
  2. Lock: press and hold Stand By for 3 s to turn lock on (lock icon shows) or off (lock icon clears).

Applies to: Remote controller Stand By and lock

Source: Navien CH-ASME user's operation manual, p. 22. Written in our own words; check the manual for your exact model.

Change installer parameters (password 1234)

Combi boiler · Navien NCB-H

Installer parameters sit behind a password in the service menu.

  1. Hold Back + Menu for 3 seconds and open 3. Parameter Settings.
  2. Enter password 1234.
  3. Edit the value; it saves after 10 seconds with no input.

Applies to: NCB-250/150H, NCB-240/130H, NCB-240/110H, NCB-190/080H, NCB-190/060H

Source: Navien NCB-H Installation & Operation Manual, 11.6.3 Setting the Operation Parameters, p.121-124. Written in our own words; check the manual for your exact model.

Open the service / installer menu (Back + Menu)

Combi boiler · Navien NCB-H

Hidden menu reached by holding Back and Menu; it holds parameter settings, test mode, special operations and air purge.

  1. Hold Back and Menu together for 3 seconds.
  2. Choose the entry with the Command dial (3. Parameter Settings, 6. Test Mode, 7. Special Operations, 8. Air Purge Mode).
  3. Press Back to leave.

Applies to: NCB-250/150H, NCB-240/130H, NCB-240/110H, NCB-190/080H, NCB-190/060H

Source: Navien NCB-H Installation & Operation Manual, 11.6.3 Setting the Operation Parameters, p.121-124. Written in our own words; check the manual for your exact model.

Change the Installer Menu password

Furnace · NPF

The password is changed from the Installer Menu.

  1. Enter the Installer Menu.
  2. Select P/W Change.
  3. Enter the new password.
  4. Press Back to return to the previous menu.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 108. Written in our own words; check the manual for your exact model.

Enter the Installer Menu

Furnace · NPF

Opens the Installer Menu. The factory default password is 1234. Entering the wrong password 10 times, or making no input for 1 minute, returns the furnace to Normal mode.

  1. Press the Menu and Back buttons together for 3 seconds.
  2. Select Installer Menu.
  3. On the Password screen, use Up or Down to change digits and places, then press OK.
  4. If the password is correct, the Installer Menu opens.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 108. Written in our own words; check the manual for your exact model.

Read status and technical data in installer setting mode

General · WEC Series

Status (S01 to S33) and technical (T01 to T17) information are read on the main panel through installer setting mode.

  1. Enter installer setting mode (see section 3.8 of the manual).
  2. Scroll to the status (S) or technical (T) item number.
  3. Read the value shown for that item.

Applies to: WEC600

Source: Navien WEC service manual, p. 50-51. Written in our own words; check the manual for your exact model.

Change installer parameters (password 1234)

Tankless water heater · Navien NPE-2

Operating parameters 1-16 are changed from the Installer Menu, which asks for the installer password.

  1. Hold Menu and Back together for 3 seconds.
  2. Open 1. Installer Menu and enter password 1234.
  3. Choose 2. Parameter Settings and edit the parameter.
  4. The value saves by itself after 10 seconds with no input.

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 7.5.1.2 Setting the Operation Parameters, p.99-100. Written in our own words; check the manual for your exact model.

Change the installer password

Tankless water heater · Navien NPE-2

The installer password is changed in the installer menu; the factory value is 1234.

  1. Hold Menu and Back together for 3 seconds.
  2. Open 1. Installer Menu and choose 7. P/W Change.

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 7.4.2 p.95-96; 7.5 p.98-99, p.105-107. Written in our own words; check the manual for your exact model.

Open the R&D information menu (key sequence)

Tankless water heater · Navien NPN

Hidden menu with 1 Technical Information and 2 Parameter Information (2.PAR); it returns to the menu after 5 minutes without key input.

  1. Press Power to turn the heater off.
  2. Press Up (+) 3 times, Down (-) 3 times, then Up (+) 4 times.
  3. Use Up/Down to choose 2.PAR, press Info.
  4. Reset goes back one level.

Applies to: NPN-160U/180U/199U, NPN-120E/160E/180E/199E

Source: Navien NPN-U/NPN-E Installation Manual, 3.4.3 Adjusting the Recirculation Parameters, p.28. Written in our own words; check the manual for your exact model.

Open the service / installer menu (Menu + Back)

Tankless water heater · Navien NPE-2

Hidden menu that holds the installer menu, cascade setup, test mode and special operations.

  1. Hold Menu and Back together for 3 seconds.
  2. Choose Installer Menu, Cascade Status and Set, Test Mode or Special Operations with OK.
  3. Press Back to leave.

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 7.4.2 p.95-96; 7.5 p.98-99, p.105-107. Written in our own words; check the manual for your exact model.

Enter the Setting menu

Water heater · NWP500

Hold the Menu button to reach the Setting menu.

  1. Press and hold the Menu button for more than 5 seconds.
  2. Select Setting.
  3. Scroll with Up or Down, and press OK to select an item.
  4. Press Back to return to the previous screen.

Applies to: NWP500 all operating modes

Source: Navien NWP500 installation manual, p. 47. Written in our own words; check the manual for your exact model.

Entering the Installer Menu

Water heater · NWP500

Press and hold Menu and Back together for more than 5 seconds, then choose 1. Installer Menu. Enter the four-digit password with Up/Down to change digits and OK to move on. Factory default password is 1234. Ten wrong tries or one minute without input returns the unit to Normal mode.

  1. Press and hold Menu and Back together for more than 5 seconds.
  2. Select 1. Installer Menu.
  3. Enter the four-digit password using Up/Down and OK.
  4. Press OK after the fourth digit to confirm.
  5. If the password is wrong 10 times or idle for 1 minute, the unit returns to Normal mode.

Applies to: NWP500-50, NWP500-65, NWP500-80 display

Source: Navien NWP500 installation manual, p. 55-56. Written in our own words; check the manual for your exact model.

Installer Menu password lockout

Water heater · NWP500

Entering the wrong installer password 10 times, or making no input for 1 minute, returns the unit to Normal mode.

  1. Enter the Installer Menu password carefully.
  2. Use the Back button to return to the previous screen or menu.

Applies to: NWP500 series

Source: Navien NWP500 installation manual, p. 56. Written in our own words; check the manual for your exact model.

Lock mode on/off

Water heater · NPN

Lock mode stops accidental or child button presses. Error resets and changing settings from the front panel still work while locked.

  1. Press and hold the Lock button for 2 seconds to turn Lock mode on or off.
  2. When active, the lock icon shows and all buttons except Lock are disabled.

Applies to: NPN outdoor models with remote controller

Source: NPN user's information manual, p. 13. Written in our own words; check the manual for your exact model.

Open the Installer Menu

Water heater · ComfortCirc

The installer menu is protected by a four-digit password. The factory default is 1234.

  1. Press and hold the Menu and Back buttons together for more than 5 seconds, then select Installer Menu.
  2. Use Up or Down to change each digit and OK to move to the next digit.
  3. Press OK after the fourth digit to confirm.
  4. After 10 wrong password entries, or 1 minute with no input, the water heater returns to Normal mode.
  5. Press Back to go to the previous mode.

Applies to: ComfortCirc installer menu

Source: Navien ComfortCirc installation and operation manual, p. 20-21. Written in our own words; check the manual for your exact model.

Button combinations

Key presses that open menus, show readouts or switch modes.

Open the cascade settings menu

Boiler · NCB700

Cascade and related settings are reached through the Back and Menu buttons.

  1. Press Back and Menu together for 3 seconds.
  2. Select 4. Cascade Status and Set.
  3. Rotate the Command dial to move between parameters or change values; press the dial to select or confirm.

Applies to: NCB700 cascade systems

Source: Navien NCB700 installation and operation manual, p. 129. Written in our own words; check the manual for your exact model.

Open the cascade status and setup menu

Boiler · NCB700

Button hold on the main boiler panel to reach the cascade menu.

  1. Press Back and Menu together and hold for 3 seconds.
  2. Select 4. Cascade Status and Set.

Applies to: NCB700 main unit

Source: Navien NCB700 installation and operation manual, p. 87. Written in our own words; check the manual for your exact model.

Open the external connection menu

Boiler · NCB700

Set up AHU communication for the external connection.

  1. Press Back and Menu together for 3 seconds.
  2. Select 5. External Connection.
  3. Set AHU Communication to Enable or Disable (default Disable). The AHU protocol must match the NPE protocol. See the air handler piping example on page 34.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 131. Written in our own words; check the manual for your exact model.

Remote controller ON/OFF key

Boiler · CH ASME

Pressing ON/OFF turns the LCD off. Pressing it again turns the LCD back on. When the LCD is off, only the clock shows and heating and DHW are disabled.

  1. Press ON/OFF to turn the LCD off or on.

Applies to: Remote controller

Source: Navien CH ASME User's Operation Manual, p. 15. Written in our own words; check the manual for your exact model.

Run a space heating pipe air purge

Boiler · NCB700

Air purge mode bleeds air from the space heating pipe.

  1. Press Back and Menu together for 3 seconds.
  2. Select 8. Air Purge Mode.
  3. Press the Command dial to run the SH pipe air purge.
  4. Boiler returns to normal mode if no input for 15 minutes.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 134. Written in our own words; check the manual for your exact model.

Turn the boiler on or off

Boiler · NCB700

The Power button is pressed for 0.3 seconds to switch the boiler on or off. Before the first start, check venting and combustion air, and purge gas and water lines of air pockets. The status icons stay lit when the boiler is off.

  1. Check venting and combustion air supply before first start-up.
  2. Purge gas and water lines of air pockets before first start-up.
  3. Press the Power button for 0.3 seconds to turn the boiler on or off.

Applies to: NCB700 all models

Source: Navien NCB700 installation & operation manual, p. 113. Written in our own words; check the manual for your exact model.

Enter Special Operations or Test Mode

Furnace · NPF

Hold the Menu and Back buttons together for 3 seconds to open the service menu. Choose Special Operations or Test Mode from there.

  1. Press Menu and Back together and hold for 3 seconds.
  2. Select Special Operations or Test Mode.
  3. Use Up/Down to move between items and OK to run one.

Applies to: NPF Condensing Hydro-furnace

Source: NPF Condensing Hydro-furnace installation and operation manual, p. 122-123. Written in our own words; check the manual for your exact model.

Front control panel buttons

Furnace · NPF

Six buttons navigate the menus, change setpoints and power the furnace on or off.

  1. Menu: opens the Main menu.
  2. Up / Down: change a setting or parameter, or move through a list.
  3. OK: selects the highlighted item.
  4. Back: returns to the previous screen.
  5. Power: turns the furnace on or off. It does not cut line voltage to the unit; disconnect the supply to isolate power.

Applies to: All NPF700 models

Source: Navien NPF installation and operation manual, p. 100, 101. Written in our own words; check the manual for your exact model.

Enter Installer Setting mode

General · WEC Series

Press and hold Back and Next together for 3 seconds to open Installer Setting mode. STR mode is started from here.

  1. Press and hold the Back and Next buttons together for 3 seconds.
  2. Select STR mode from the installer menu (see 3.8, p. 38).

Applies to: WEC Series main panel

Source: Navien WEC Series Service Manual, p. 48. Written in our own words; check the manual for your exact model.

Enter STR mode from installer setting

General · WEC Series

Holding Back and Next together starts installer setting mode, which is also where STR sterilization is started.

  1. Press and hold the Back and Next buttons together for 3 seconds.
  2. Enter STR mode from the installer setting menu.
  3. Refer to section 3.8 of the manual for the installer setting details.

Applies to: WEC600

Source: Navien WEC service manual, p. 48. Written in our own words; check the manual for your exact model.

Main panel button combinations

General · WEC Series

Long presses are held for more than 3 seconds. Several combinations open service modes.

  1. Back + OK, long press: enter Install Check Mode.
  2. Back + Next, long press: enter Installer Setting Mode to view status info, run forced flushing, run forced CIP and reset errors.
  3. Back + OK + Next, long press: enter Reset Mode to reset the filter cartridge period and the CIP tank level.
  4. Back long press: skip initial regeneration and CIP mode steps.
  5. Next long press: set the time and the CIP operation time.
  6. OK long press: show feedwater TDS, product water TDS and cumulative treated water volume after CIP.
  7. Power long press: power the WEC on or off. When off, the internal bypass valve opens to pass feedwater.

Applies to: WEC600

Source: Navien WEC Series service manual, p. 28. Written in our own words; check the manual for your exact model.

Power the WEC off

General · WEC

Puts the unit into Powering Off mode. Only the time stays on the display. Feedwater still reaches the home if water is used. The unit still flushes the NDI modules every 24 hours from last use, so do not cut power at the cord.

  1. Press and hold the Power button for 3 seconds.
  2. Do not unplug the power cord to shut the unit down.

Applies to: WEC600

Source: WEC Series service manual, p. 32-33. Written in our own words; check the manual for your exact model.

Power the WEC on

General · WEC

Powers the unit on from off mode. The ON indicator and user information appear on the display.

  1. Press and hold the Power button for 3 seconds.

Applies to: WEC600

Source: WEC Series service manual, p. 32. Written in our own words; check the manual for your exact model.

Reset filter and CIP use period

General · WEC Series

Resets the filter use period or CIP fill level after service. Press and hold Back, OK and Next together for 3 seconds.

  1. Press and hold the Back, OK and Next buttons together for 3 seconds.
  2. Confirm the reset on the display.

Applies to: WEC Series main panel

Source: Navien WEC Series Service Manual, p. 43, 45, 47. Written in our own words; check the manual for your exact model.

Allocate a sub water heater to the cascade

Water heater · NPE-A2

Hold the OK button on the sub unit to assign its ID. Repeat for each sub unit.

  1. On the sub NPE-A2 panel, press and hold OK for 3 seconds.
  2. Confirm the display shows ID 1. Allocated! and the sub icon.

Applies to: NPE-A2 sub units in an NCB700 cascade

Source: Navien NCB700 installation and operation manual, p. 88. Written in our own words; check the manual for your exact model.

Button combinations for menus and tests

Water heater · NWP500

Holding the Menu and Back buttons together for more than 5 seconds opens Test Mode or Factory Reset. Holding Menu for more than 5 seconds opens Setting or Configuration. Holding Menu and OK for 3 seconds with the unit off enters Wi-Fi Connection mode.

  1. Hold Menu and Back for more than 5 seconds, then select Test Mode or Factory Reset.
  2. Hold Menu for more than 5 seconds to open Setting or Configuration.
  3. With the unit off, hold Menu and OK for 3 seconds to enter Wi-Fi Connection mode.
  4. Hold Power to turn the unit off.

Applies to: NWP500 series

Source: Navien NWP500 installation manual, p. 58. Written in our own words; check the manual for your exact model.

Enter high temperature (commercial) mode

Water heater · NPE

Turns on the high temperature mode on select models. The display shows HIGH for 3 seconds if the mode is available, or LoW if it is not. Commercial warranty applies while this mode is used. Check the set temperature before drawing hot water to avoid scalding.

  1. Press and hold the Up and Down buttons together for 10 seconds.
  2. Watch the display: HIGH means the mode is available, LoW means it is not.
  3. Use Up or Down to change the setpoint in 1°F (0.5°C) steps.
  4. Check the set temperature before using hot water.

Applies to: Select NPE water heaters that support commercial mode; see the water heater operation manual

Source: Navien NPE remote controller manual, p. 16. Written in our own words; check the manual for your exact model.

Enter the R&D information menu to reach parameters

Water heater · NPN/NHW700

Entry uses a fixed button sequence on the front panel. The Reset button backs out one level.

  1. Press the Power button on the front panel to turn the water heater off.
  2. Press Up (+) three times, then Down (-) three times, then Up (+) four more times.
  3. Use Up (+) or Down (-) to move to 2.PAR (Parameter Information mode), then press Info.
  4. To go back to the R&D information menu, press Reset once.

Applies to: NPN/NHW700 with HotButton Kit

Source: Navien HotButton add-on controller installation manual, p. 2. Written in our own words; check the manual for your exact model.

Entering High Temperature mode (Commercial mode)

Water heater · NPE

Use this mode to set temperatures above 140°F (60°C). On entry the display shows HIGH for 3 seconds if the mode is available, or LoW for 3 seconds if it is not. Available only on select models.

  1. Press and hold the Up and Down buttons together for 10 seconds.
  2. Watch the display: HIGH means the mode is available, LoW means it is not.
  3. Use Up or Down to set the temperature in 1°F (0.5°C) steps.
  4. Check the set temperature before using hot water to avoid scalding.

Applies to: Select Navien water heater models

Source: Navien NPE remote controller manual, p. 16. Written in our own words; check the manual for your exact model.

Hold SW3 and SW4 for cascade set-up

Water heater · CR, CC

During cascade set-up, holding SW3 and SW4 together starts the slave set-up on each slave and finishes the set-up on the master.

  1. Hold SW3 and SW4 on slave 1 for more than 3 seconds to start slave set-up.
  2. Hold SW3 and SW4 on the master for more than 3 seconds to finish set-up.

Applies to: Cascade master and slave units

Source: CR-CC installation manual, p. 37. Written in our own words; check the manual for your exact model.

Open the Setting menu

Water heater · NWP500

Press and hold the Menu button for more than 5 seconds to open the Setting menu.

  1. Press and hold Menu for more than 5 seconds.
  2. Select Setting.
  3. Use Up or Down to scroll and OK to select.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 User's Information Manual, p. 15. Written in our own words; check the manual for your exact model.

Starting recirculation manually

Water heater · NPN

Starts one recirculation run immediately, regardless of the reservation schedule. Requires external circulating pumps connected and on.

  1. Press the Preheat & Timer button.
  2. 'HEAT' shows for 4 seconds, then recirculation runs once.
  3. The preheating icon flashes while recirculation runs.

Applies to: NPN outdoor models with remote controller

Source: NPN user's information manual, p. 15. Written in our own words; check the manual for your exact model.

Service & test modes

Forced fan, low and high fire, test and diagnostic modes, error history and live data.

How to step through and read the parameters

Air conditioner · NAA

The CHK button walks through the parameter list. The up and down buttons change a parameter value where the manual allows it.

  1. Press CHK (K4) once to show the parameter number.
  2. Wait about 1 second and the value for that number is shown.
  3. Press CHK again to move to the next parameter number.
  4. Use the up arrow to set a parameter up (+) and the down arrow to set it down (-) when editing.

Applies to: NAA outdoor unit

Source: Navien NAA air conditioner service manual, p. 18. Written in our own words; check the manual for your exact model.

Enter air purge mode and purge air from water system

Boiler · NCB700

Purge all air from the water system after filling. Skipping this can damage the boiler, and that damage is not covered by warranty.

  1. Press the Back button and the Menu button together for 3 seconds.
  2. Select "8. Air Purge Mode".
  3. Turn the Command dial to move between parameters.
  4. Press the Command dial to start an air purge.
  5. Press the Back button to return to the previous screen or menu.
  6. If no input is detected for 15 minutes, the boiler returns to normal operation mode.
  7. Watch for leaks during purging and repair them before continuing.
  8. Keep the system pressure at the correct value during the purge.

Applies to: NCB700 with front panel display

Source: Navien NCB700 installation and operation manual, p. 111. Written in our own words; check the manual for your exact model.

Enter special operation mode 7 (SH 2nd MAX)

Boiler · NCB700

Special operation mode 7 runs the boiler at its second-stage space heating maximum. It is used during gas pressure testing. Exit it with the Back button.

  1. Press the Back button and the Menu button together for 3 seconds.
  2. Turn the dial to '7. Special Operations' and press the dial.
  3. Turn the dial to '7. SH 2nd MAX (CL 2e MAX)' and press the dial to select it.
  4. Press the Back button twice to return to normal mode.

Applies to: NCB700 front panel

Source: Navien NCB700 installation & operation manual, p. 228. Written in our own words; check the manual for your exact model.

Enter Special Operations and select SH 2nd MAX

Boiler · NCB700

Used to run the boiler at space heating second maximum, for example to purge gas from the supply line during pressure checks.

  1. Press Back and Menu together for 3 seconds.
  2. Turn the Command dial to 7. Special Operations.
  3. Press the Command dial to enter special operation mode.
  4. Turn the Command dial to 7. SH 2nd MAX and press it to select.
  5. Press Back twice to return to normal operation.
  6. Run space heating; leave on until the boiler shuts down from lack of gas, then turn it off.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 58. Written in our own words; check the manual for your exact model.

Force a fixed firing rate with DIP switch 1

Boiler · Navien NHB-H

Switches 1 and 2 of the first DIP bank hold the burner at minimum or maximum for testing; leave them OFF/OFF for normal operation.

  1. Turn power off before removing the front cover to reach the DIP switches.
  2. 1 ON, 2 OFF = 2-stage MAX.
  3. 1 OFF, 2 ON = 1-stage MIN.
  4. 1 ON, 2 ON = 1-stage MAX.
  5. Return 1 and 2 to OFF/OFF for normal operation.

Applies to: Navien NHB-H condensing boilers: NHB-150H, NHB-110H, NHB-080H, NHB-055H

Source: Navien NHB-H Installation and Operation Manual, 6.1 DIP Switch 1, p.67. Written in our own words; check the manual for your exact model.

Force a special operation mode

Boiler · NCB700

Special operation modes hold the boiler in a fixed operating state for testing.

  1. Press Back and Menu together for 3 seconds.
  2. Select 7. Special Operations.
  3. Choose a mode: Normal, 1st MIN, DHW 1st MAX, 2nd MIN, DHW 2nd MAX, SH 1st MAX or SH 2nd MAX.
  4. Boiler returns to Normal mode after 3 hours with no input.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 134. Written in our own words; check the manual for your exact model.

Force minimum or maximum firing (special operations)

Boiler · Navien NHB-H

Special operations hold the burner at a fixed rate; they return to normal automatically after 3 hours.

  1. Hold Back and Menu together for 3 seconds.
  2. Choose 7. Special Operations.
  3. Pick Normal, 1st MIN, 1st MAX, 2nd MIN or 2nd MAX.

Applies to: Navien NHB-H condensing boilers: NHB-150H, NHB-110H, NHB-080H, NHB-055H

Source: Navien NHB-H Installation and Operation Manual, 11.7 Viewing Basic Information p.103-104; 11.13 Advanced Menu p.109-118; 11.10 p.108. Written in our own words; check the manual for your exact model.

Open the test mode

Boiler · NCB700

Test mode runs individual component tests and an automatic controller test.

  1. Press Back and Menu together for 3 seconds.
  2. Select 6. Test Mode.
  3. Rotate the Command dial to pick a test, then press the dial to run it.
  4. Press Back to return to the previous screen.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 131. Written in our own words; check the manual for your exact model.

Purge air from the heating or DHW piping (Air Purge Mode)

Boiler · Navien NHB-H

Air purge mode returns to normal by itself after 15 minutes.

  1. Hold Back and Menu together for 3 seconds.
  2. Choose 8. Air Purge Mode.
  3. Pick SH pipe or DHW pipe air purge.

Applies to: Navien NHB-H condensing boilers: NHB-150H, NHB-110H, NHB-080H, NHB-055H

Source: Navien NHB-H Installation and Operation Manual, 11.7 Viewing Basic Information p.103-104; 11.13 Advanced Menu p.109-118; 11.10 p.108. Written in our own words; check the manual for your exact model.

Run test mode (fan, pumps, zone valves, venturi)

Boiler · Navien NHB-H

Test mode switches individual outputs so you can check them one at a time.

  1. Hold Back and Menu together for 3 seconds.
  2. Choose 6. Test Mode.
  3. Pick the output: fan motor ramp, boiler/system/zone/DHW pumps, zone valves or dual venturi.

Applies to: Navien NHB-H condensing boilers: NHB-150H, NHB-110H, NHB-080H, NHB-055H

Source: Navien NHB-H Installation and Operation Manual, 11.7 Viewing Basic Information p.103-104; 11.13 Advanced Menu p.109-118; 11.10 p.108. Written in our own words; check the manual for your exact model.

View input and output status

Boiler · NCB700

Shows the live state of boiler inputs and outputs. Items include SH thermostat inputs 1 to 4, external recirculation input, boiler, zone and system pump outputs, zone valve outputs, 3-way valve, HTL input, dual venturi, LWCO input and air handler interface output. Some items show only with certain zone settings.

  1. Press the Back and Menu buttons together for 3 seconds.
  2. Select 2. Input/Output Status.
  3. Turn the Command dial to scroll the items.
  4. Press the Command dial to view an item.

Applies to: Input/output status menu

Source: Navien NCB700 installation & operation manual, p. 125-126. Written in our own words; check the manual for your exact model.

View service information counters

Boiler · NCB700

Service information shows install time and how often protection and ignition events have happened. Items: elapsed time since install, HEX overheat count, flame loss/misfire count, 2nd, 3rd and 4th ignition counts, and 5th to 10th ignition counts.

  1. Press the Back and Menu buttons together for 3 seconds.
  2. Select 1. Service Status Info.
  3. Turn the Command dial to scroll the items.
  4. Press the Command dial to open an item.

Applies to: Service information menu

Source: Navien NCB700 installation & operation manual, p. 125. Written in our own words; check the manual for your exact model.

Zero the manometer before a gas pressure check

Boiler · NCB700

Reset the manometer to zero before connecting to the pressure port so the reading is valid.

  1. Zero the digital manometer before connecting it.
  2. Connect it to the pressure port and check the reading at full fire.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 58. Written in our own words; check the manual for your exact model.

Force a fixed firing rate with DIP switch 1

Combi boiler · Navien NCB-H

Switches 1 and 2 of the first DIP bank hold the burner at minimum or maximum for testing; leave them OFF/OFF for normal operation.

  1. Turn power off before removing the front cover to reach the DIP switches.
  2. 1 ON, 2 OFF = 2-stage MAX.
  3. 1 OFF, 2 ON = 1-stage MIN.
  4. 1 ON, 2 ON = 1-stage MAX.
  5. Return 1 and 2 to OFF/OFF for normal operation.

Applies to: NCB-250/150H, NCB-240/130H, NCB-240/110H, NCB-190/080H, NCB-190/060H

Source: Navien NCB-H Installation & Operation Manual, 6.1 DIP Switch 1, p.76. Written in our own words; check the manual for your exact model.

Force minimum or maximum firing (special operations)

Combi boiler · Navien NCB-H

Special operations hold the burner at a fixed rate for gas pressure and CO2 checks; they return to normal after 3 hours with no input.

  1. Hold Back and Menu together for 3 seconds and choose 7. Special Operations.
  2. 1. Normal returns to normal operation.
  3. 2. 1st MIN / 4. 2nd MIN: minimum firing (low-fire CO2 / offset).
  4. 3. DHW 1st MAX / 5. DHW 2nd MAX: DHW maximum firing.
  5. 6. SH 1st MAX / 7. SH 2nd MAX: SH maximum firing (inlet gas pressure, high-fire CO2).

Applies to: NCB-250/150H, NCB-240/130H, NCB-240/110H, NCB-190/080H, NCB-190/060H

Source: Navien NCB-H Installation & Operation Manual, 11.6.6-11.6.8, p.125-128. Written in our own words; check the manual for your exact model.

Purge air from the heating piping (Air Purge Mode)

Combi boiler · Navien NCB-H

Air purge mode ends by itself after 15 minutes.

  1. Hold Back and Menu together for 3 seconds and choose 8. Air Purge Mode.
  2. Choose 1. SH pipe air purge.

Applies to: NCB-250/150H, NCB-240/130H, NCB-240/110H, NCB-190/080H, NCB-190/060H

Source: Navien NCB-H Installation & Operation Manual, 11.6.6-11.6.8, p.125-128. Written in our own words; check the manual for your exact model.

Run test mode (fan, pumps, valves, venturi)

Combi boiler · Navien NCB-H

Test mode switches individual outputs so you can check them one at a time.

  1. Hold Back and Menu together for 3 seconds and choose 6. Test Mode.
  2. 1. Fan Motor ramps the fan up to top speed and back down.
  3. 2-5. Boiler / Zone 1-3 pumps toggle on/off (zone pumps only in pump system).
  4. 6-8. Zone 1-3 valve output toggles (zone valve system only).
  5. 9. 3 Way Valve Output toggles the 3-way valve.
  6. 10. Flow Control Valve / 11. Mixing Valve drive open-closed-back and show FEEDBACK.
  7. 12. Dual Venturi / 13. Recirc. Pump toggle on/off.

Applies to: NCB-250/150H, NCB-240/130H, NCB-240/110H, NCB-190/080H, NCB-190/060H

Source: Navien NCB-H Installation & Operation Manual, 11.6.6-11.6.8, p.125-128. Written in our own words; check the manual for your exact model.

Check 24VAC thermostat and output inputs

Furnace · NPF

The Operation Status view shows whether each thermostat input (W1, W2, Y1, Y2, G, O/B, DEHUM) is active and the state of the HUM, DEHUM and EAC outputs. Some items are hidden depending on parameter settings, so a missing item is not always a fault. The cooling stage item only appears when Heat Only is set to No.

  1. Open the Operation Status Information view from the status menu.
  2. Check each 24VAC input status against the thermostat call you are testing.
  3. Check the HUM, DEHUM and EAC output status.
  4. Press Back to exit.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 105. Written in our own words; check the manual for your exact model.

Purge gas supply line using MAX mode

Furnace · NPF

Runs the burner at full output with the gas line open so air is pushed out of the supply piping. Only steps 2 to 7 are on these pages; step 1 is not shown.

  1. Press and hold the Menu and Back buttons together for 3 seconds, then select Special Operations.
  2. Press Up or Down to reach MAX, then press OK to select the mode.
  3. Press Back twice to return to normal operation.
  4. Run space heating so the gas in the supply line is purged.
  5. Leave the furnace on until it shuts down from lack of gas, then turn it off.
  6. Loosen the three knobs on the upper front cover counterclockwise and remove the cover.

Applies to: NPF700 hydro-furnace gas line purging

Source: Navien NPF installation and operation manual, p. 49. Written in our own words; check the manual for your exact model.

Read service counters (Service Status Info)

Furnace · NPF

Shows the elapsed time since install and cycle counts for heat, pump, flame loss, 2nd to 10th ignition, cool, fan, blower, auto water fill (AWS) and heat pump operation. Flame loss and ignition counts help trace ignition problems.

  1. Enter the Installer Menu and select Service Status Info.
  2. Use Up or Down to move between items, then press OK to view one.
  3. Press Back to return to the previous menu.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 109. Written in our own words; check the manual for your exact model.

Run the Service Wizard self-check

Furnace · NPF

The Service Wizard runs a self-check of the water fill, combustion fan, water circulation, blower and combustion performance.

  1. Enter the Installer Menu and select Service Wizard.
  2. Fill water check: the water tank is filled to maximum level.
  3. Combustion fan check: the fan runs at minimum and maximum RPM.
  4. Water circulation check: the water adjustment valve opens and closes and the pump turns on and off.
  5. Blower check: the blower is run.
  6. Combustion check: combustion performance is checked.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 109. Written in our own words; check the manual for your exact model.

View combustion status information

Furnace · NPF

Read live combustion data from the Status Information menu: heat capacity, flame detection AD value, inducer fan RPM and exhaust gas temperature.

  1. From the Status Information menu, select Combustion.
  2. Use Up or Down to move between items, then press OK to view one.
  3. Press Back to exit the Combustion view.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 104. Written in our own words; check the manual for your exact model.

View monthly system operation totals (EMS Data)

Furnace · NPF

Shows monthly totals for heat operation time, cool operation time, continuous fan time, gas consumption and heat pump operation time. Gas consumption counts the furnace only and can differ from the gas meter.

  1. Press the Menu button and select EMS Data.
  2. Use Up or Down to move between items, then press OK to view one.
  3. Press Back to exit the System Operation Information view.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 107. Written in our own words; check the manual for your exact model.

View operation status (heat demand and stage)

Furnace · NPF

Shows the furnace operating state and the heating stage currently set.

  1. From the Status Information menu, select Operation.
  2. Use Up or Down to move between items, then press OK to view one.
  3. Press Back to exit the Operation status view.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 104. Written in our own words; check the manual for your exact model.

View stored fault code history

Furnace · NDF

The control keeps the last 5 fault codes. Pressing the push button flashes the stored codes after the button is released. The newest code flashes first and the oldest flashes last.

  1. Press and release the push button on the control.
  2. Watch the red LED flash the stored codes, newest first.

Applies to: NDF600 models

Source: Navien NDF installation and operation manual, p. 70. Written in our own words; check the manual for your exact model.

View system information (capacity, gas, altitude, vent, firmware)

Furnace · NPF

Shows max combustion rate in BTU, gas type selected, altitude setting, vent option, front panel firmware version and main controller firmware version.

  1. Press the Menu button and select System Information.
  2. Use Up or Down to move between items, then press OK to view one.
  3. Press Back to exit the System Information view.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 105. Written in our own words; check the manual for your exact model.

View the error history

Furnace · NPF

Shows the 10 most recent errors, newest at the top. Each error can be opened for details. Use section 5.15 of the manual for error code meanings.

  1. Press the Menu button and select Error History.
  2. Use Up or Down to scroll the list.
  3. Press OK on an error to view its details.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 106. Written in our own words; check the manual for your exact model.

View water status information

Furnace · NPF

Read hydronic loop data from the Status Information menu: supply and return water temperature, temperature rise, water flow rate, flow regulating valve state and pump status.

  1. From the Status Information menu, select Water.
  2. Use Up or Down to move between items, then press OK to view one.
  3. Press Back to exit the Water status view.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 104. Written in our own words; check the manual for your exact model.

Installer Setting Mode options used in troubleshooting

General · WEC

Installer Setting Mode is referenced for error reset and several service routines. Refer to section 3.8 of the manual for entry details, which are not on these pages.

  1. Use Error Code Reset (ErSt) to clear certain errors.
  2. Use option 03 (Service Mode) when the flowchart calls for it.
  3. Use option 06 (Forced Flushing) for blockage errors E024 and E025.
  4. Use option 08 (Test CIP) for TDS sensor errors E041 and E042.

Applies to: WEC600

Source: Navien WEC service manual, p. 56-64. Written in our own words; check the manual for your exact model.

Force minimum or maximum firing (special operations)

Tankless water heater · Navien NPE-2

Special operations hold the burner at a fixed firing rate for combustion checks.

  1. Hold Menu and Back together for 3 seconds and choose 4. Special Operations.
  2. Pick 1st MIN, 1st MAX, 2nd MIN or 2nd MAX.
  3. Choose 1. Normal to return to normal operation.

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 7.4.2 p.95-96; 7.5 p.98-99, p.105-107. Written in our own words; check the manual for your exact model.

Run test mode (fan, flow valve, venturi, pump, mixing valve)

Tankless water heater · Navien NPE-2

Test mode drives individual parts so you can check them one at a time.

  1. Hold Menu and Back together for 3 seconds and choose 3. Test Mode.
  2. 1. Fan Motor: fan ramps from 0 to max and back, repeating.
  3. 2. Water Flow Adjust Valve: full open to full close over about 12 s, shows 0-100%.
  4. 3. Dual Venturi: on when entered, Up/Down toggles on/off.
  5. 4. Pump (A2) / Ext. Pump (S2): runs 10 s, stops 5 s, 5 times (75 s).
  6. 5. Mixing Valve (S2 only): full open to full close over about 10 s, shows 0-56%.

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 7.4.2 p.95-96; 7.5 p.98-99, p.105-107. Written in our own words; check the manual for your exact model.

Diagnostics button (installers only)

Water heater · NPN

The Diagnostics button is for installers only and is not for normal user operation.

Applies to: Indoor models with front panel

Source: Navien NPN user's information manual, p. 8. Written in our own words; check the manual for your exact model.

Evaporator fan test

Water heater · NWP500

The fan runs and then stops for 20 seconds. The current RPM is shown on the front panel.

  1. Enter Test Mode and select Evaporate Fan.
  2. Watch the RPM value on the front panel during the run.
  3. Confirm the fan reaches the expected speed and stops.

Applies to: NWP500 series

Source: Navien NWP500 installation manual, p. 58. Written in our own words; check the manual for your exact model.

Leak detection shut-off valve test

Water heater · NWP500

The valve is driven to full open (0%) and then full close (100%). The valve returns to its prior status afterward.

  1. Enter Test Mode and select Leak Detection System.
  2. Check the feedback during the procedure.
  3. Confirm the valve reaches full open and full close, then returns to its latest status.

Applies to: NWP500 series with leak detection shut-off valve

Source: Navien NWP500 installation manual, p. 59. Written in our own words; check the manual for your exact model.

Open Status Information menu

Water heater · NWP500

Shows hot water, heat pump, heating element and recirc pump readings.

  1. Press and hold Menu for more than 5 seconds.
  2. Select Status Information.
  3. Use Up/Down to scroll, OK to open an item, Back to return.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 user information manual, p. 17. Written in our own words; check the manual for your exact model.

Read monthly EMS operation data

Water heater · NWP500

Shows heat pump run time, heating element run time and power use for the month.

  1. Press and hold Menu for more than 5 seconds.
  2. Select EMS Data.
  3. Scroll with Up/Down and press OK to view HP Operation Time, HE Operation Time or Power Consumption.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 user information manual, p. 21. Written in our own words; check the manual for your exact model.

Recirculation pump test

Water heater · NWP500

You can turn the recirculation pump on or off from the test menu. The test ends after 5 minutes if the pump does not run. A forced run stops if no flow is detected for 30 seconds.

  1. Enter Test Mode and select Recirc Pump Kit.
  2. Press Up or Down to turn the pump on or off.
  3. If no flow is detected for 30 seconds while forced on, expect the pump to de-energize to prevent damage.

Applies to: NWP500 series with Navien recirculation pump kit

Source: Navien NWP500 installation manual, p. 59. Written in our own words; check the manual for your exact model.

System air removal using TEST MODE pump cycle

Water heater · H2Air

TEST MODE cycles the internal pump to purge air from the combination system piping through the pump air vent or installed air removal accessories.

  1. NPE and NPE-A2/S2: press the [Diagnostic] and [Back] buttons together to enter the Special Operations menu.
  2. NHW700-A: press and hold the [Diagnostic] button for 5 seconds to enter the Special Operations menu.
  3. Select TEST MODE, then select PUMP to cycle the internal pump.
  4. Run the cycle until air is removed from the system piping.

Applies to: NPE, NPE-A2/S2 and NHW700-A water heaters with H2Air

Source: Navien H2Air installation manual, p. 21. Written in our own words; check the manual for your exact model.

Test the recirculation pump kit

Water heater · ComfortCirc

Runs the recirculation pump on and off so you can check it. The control status and flow rate show on the front panel.

  1. Press and hold the Menu and Back buttons together for more than 5 seconds, then select Test Mode.
  2. Select Recirc Pump Kit from the Test Mode menu.
  3. Use Up or Down to switch the pump on or off.
  4. If the pump does not run for 5 minutes, the test ends automatically.
  5. Press Back to return to the previous screen.

Applies to: ComfortCirc recirculation pump kit

Source: Navien ComfortCirc installation and operation manual, p. 23. Written in our own words; check the manual for your exact model.

Viewing basic information (indoor models)

Water heater · NPN

The information view shows flow rate and inlet and outlet water temperatures.

  1. Press the Information button.
  2. Press the + or – buttons to switch between the information types: flow rate in GPM, hot outlet temperature (OUT) and cold inlet temperature (IN).
  3. Press the Reset button to exit information mode.

Applies to: NPN indoor models

Source: NPN user's information manual, p. 12. Written in our own words; check the manual for your exact model.

Reset & cancel

Clearing lockouts, service reminders and fault history; skipping purge or de-air programs.

Automatic restart after power failure

Boiler · Combination boiler

After a power failure the boiler restarts automatically once power returns. No manual reset is needed.

Applies to: Navien combination boiler power interruption

Source: Navien combination boiler user's operation manual, p. 8. Written in our own words; check the manual for your exact model.

Cancel cascade communication settings

Boiler · NCB700, NPE

Use this to remove the cascade link so the water heaters go back to running on their own. Done from the main NCB700 panel.

  1. On the main NCB700 panel, press the Back button and the Menu button together and hold for 3 seconds.
  2. Select '4. Cascade Status and Set'.
  3. Select '2. Cascade System Removal'.
  4. Select 'YES'.
  5. The water heaters revert to independent operation.
  6. To reassign the main NCB700 boiler, repeat the cascade setup steps 1-5.

Applies to: NCB700 main boiler with NPE sub water heaters

Source: Navien NCB700 Installation & Operation Manual, p. 88. Written in our own words; check the manual for your exact model.

Level 1 error display and clearing

Boiler · NCB700

A level 1 error flashes the display red with a flashing error icon. The boiler keeps running during a level 1 error. It clears on its own when the problem is fixed. Pressing the Power button clears it if the problem is already resolved.

  1. Press the Command dial to open error display mode and view the error.
  2. Fix the cause of the error.
  3. Press the Power button to clear the error if the problem is resolved.
  4. Use the Back button to leave the error list.

Applies to: Level 1 errors on the front panel

Source: Navien NCB700 installation & operation manual, p. 124. Written in our own words; check the manual for your exact model.

Remove a cascade (Cascade System Removal)

Boiler · Navien NHB-H

On the main unit it ends the cascade; on a sub unit it drops that one unit.

  1. Hold Back and Menu together for 3 seconds.
  2. Open 4. Cascade Status and Settings.
  3. Choose 2. Cascade System Removal.

Applies to: Navien NHB-H condensing boilers: NHB-150H, NHB-110H, NHB-080H, NHB-055H

Source: Navien NHB-H Installation and Operation Manual, 8 Installing a Cascade System p.72-76; 11.13.4 Configuring a Cascade System p.114-115. Written in our own words; check the manual for your exact model.

Reset one parameter to default

Boiler · NCB700

A single parameter can be returned to its factory default without a full factory reset.

  1. Enter Parameter Edit mode for the parameter.
  2. Press and hold the Back button for 5 seconds.
  3. Note that resetting Supply or Return Min or Max capacity limit also resets the matching parameter automatically.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 129. Written in our own words; check the manual for your exact model.

Reset one parameter to its default

Boiler · Navien NHB-H

Returns a single installer parameter to its factory value.

  1. Open the parameter in edit mode (Back + Menu 3 s > 3. Parameter Settings).
  2. Hold Back for 5 seconds.

Applies to: Navien NHB-H condensing boilers: NHB-150H, NHB-110H, NHB-080H, NHB-055H

Source: Navien NHB-H Installation and Operation Manual, 11.13.3 Setting the Operation Parameters, p.111-114. Written in our own words; check the manual for your exact model.

Reset the boiler after an error message

Boiler · NCB700

An error message on the front panel is cleared by a reset. If the reset does not solve the problem, use the Troubleshooting section or contact technical support.

  1. Press the Back button on the front panel to reset the boiler.
  2. If the error returns after reset, go to the Troubleshooting section and check the error code.

Applies to: NCB700 all models

Source: Navien NCB700 installation & operation manual, p. 116. Written in our own words; check the manual for your exact model.

Resetting the boiler after an error

Boiler · NFB

If an error message appears during operation, reset the boiler from the front panel. If the reset does not clear it, check the troubleshooting section of the User's Information Manual or call service.

  1. Press and hold the Reset button on the front panel.

Applies to: NFB-301C/399C

Source: Navien NFB-C quick installation guide, p. 4. Written in our own words; check the manual for your exact model.

Resetting the unit

Boiler · CH-ASME

First troubleshooting step is to reset the unit. Unplugging and re-plugging the power also resets it.

  1. Turn the unit OFF, then ON, to reset it.
  2. Or unplug and re-plug the electric supply.
  3. If a remote controller is installed, press its power button OFF, then ON.

Applies to: Navien combination boiler

Source: Navien User's Operation Manual, p. 40 and p. 42. Written in our own words; check the manual for your exact model.

Reset one parameter to its default

Combi boiler · Navien NCB-H

Returns a single installer parameter to its factory value.

  1. Open the parameter in edit mode (Back + Menu 3 s > 3. Parameter Settings).
  2. Hold Back for 5 seconds.

Applies to: NCB-250/150H, NCB-240/130H, NCB-240/110H, NCB-190/080H, NCB-190/060H

Source: Navien NCB-H Installation & Operation Manual, 11.6.3 Setting the Operation Parameters, p.121-124. Written in our own words; check the manual for your exact model.

Clear fault code history

Furnace · NDF

Holding the push button clears the stored fault history.

  1. Hold the push button on the control for more than 5 seconds.

Applies to: NDF600 models

Source: Navien NDF installation and operation manual, p. 70. Written in our own words; check the manual for your exact model.

Clear level 1 errors and error history

Furnace · NPF

A level 1 error flashes the display in red with a flashing error icon. The furnace keeps running during a level 1 error. Level 1 errors clear automatically once the problem is gone. Pressing Back clears a level 1 error only if the problem is resolved. Holding Back for 5 seconds clears all previous error codes.

  1. Press OK to open the error display if you need the details.
  2. Fix the cause and confirm the problem is gone.
  3. Press Back to clear a level 1 error.
  4. Hold Back for 5 seconds to clear all previous error codes.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 106. Written in our own words; check the manual for your exact model.

Do not run with the front cover open

Furnace · NDF

Running the furnace with the front cover off can cause fire or carbon monoxide poisoning. Front cover must be on and the quarter-turn fasteners fully engaged.

  1. Close the front cover before startup.
  2. Check that each quarter-turn fastener on the front covers is fully engaged.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 5, p. 6, p. 8. Written in our own words; check the manual for your exact model.

Factory reset the furnace settings

Furnace · NPF

Resets all parameter settings on both the front panel and the main controller to factory defaults.

  1. Enter the Installer Menu.
  2. Select Factory Reset.
  3. Confirm the reset.
  4. Re-check any site-specific parameters after the reset.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 108. Written in our own words; check the manual for your exact model.

Reset a parameter to default

Furnace · NPF

In Parameter Edit mode, holding Back resets only that parameter to its default value.

  1. In Parameter Edit mode, press and hold Back for 5 seconds.
  2. Confirm the parameter is back at its default value.

Applies to: NPF Condensing Hydro-furnace

Source: NPF Condensing Hydro-furnace installation and operation manual, p. 120-121. Written in our own words; check the manual for your exact model.

Reset one parameter to default

Furnace · NPF

In Parameter Edit mode, holding Back resets only the selected parameter to its factory default.

  1. Enter Parameter Edit mode on the parameter to reset.
  2. Press and hold the Back button for 5 seconds.

Applies to: NPF700 60/80/100 MBH

Source: Navien NPF installation and operation manual, p. 114. Written in our own words; check the manual for your exact model.

Reset the furnace after an error

Furnace · NPF

If an error message is shown, a reset may clear it. If the error comes back, check the error code table.

  1. Press the Back button to reset the furnace.
  2. If the error stays, look up the code in the error code table.
  3. If the furnace still will not run, contact Navien Technical Support.

Applies to: NPF Condensing Hydro-furnace

Source: NPF Condensing Hydro-furnace installation and operation manual, p. 124. Written in our own words; check the manual for your exact model.

Do not stop STR mode manually

General · WEC Series

Stopping STR by hand leaves the sterilization incomplete. If it is stopped, the STR mode has to be restarted and completed.

  1. Let STR run to completion without interrupting it.
  2. If it was stopped manually, restart STR and let it finish.

Applies to: WEC600

Source: Navien WEC service manual, p. 48. Written in our own words; check the manual for your exact model.

Factory reset and install test mode

General · WEC

Deletes all saved data and returns the unit to factory defaults. The unit then enters install test mode. Shows FCt on the display.

  1. With the panel off and NDI modules stopped, press and hold Back.
  2. While holding Back, press OK three times quickly.
  3. Confirm FCt is shown on the display.

Applies to: WEC600

Source: WEC Series service manual, p. 37. Written in our own words; check the manual for your exact model.

Factory reset with the main panel off

General · WEC Series

This mode works only when the main panel is off and the NDI module performance has stopped. It resets to factory defaults and deletes all saved data.

  1. With the main panel off, hold Back for more than 3 seconds while pressing Power briefly 3 times.
  2. Set the time again after reset.

Applies to: WEC600

Source: Navien WEC Series service manual, p. 28. Written in our own words; check the manual for your exact model.

Forced CIP after STR

General · WEC Series

Forced CIP (option 08 of section 3.8) should not be used right after STR, because CIP is reset when STR finishes.

  1. Wait until the STR mode has finished before running Forced CIP.
  2. Do not add detergent, including chlorine tablets, into the CIP tank.

Applies to: WEC600

Source: Navien WEC service manual, p. 48. Written in our own words; check the manual for your exact model.

Powering the WEC off correctly

General · WEC Series

Always shut the unit down from the main panel. Pulling the plug is not the correct shutdown. If the unit is only switched off at the panel and stays plugged in, it still flushes the NDI modules about every 24 hours after last use. When it sits unused for a long time, it may also regenerate periodically to protect the system.

  1. Press and hold the [Power] button on the main panel for more than 3 seconds to turn the unit off.
  2. Do not unplug the power cord to turn the unit off.
  3. Before any repair, inspection or part replacement, unplug the power plug.

Applies to: WEC600

Source: Navien WEC600 service manual, p. 6-7. Written in our own words; check the manual for your exact model.

Powering the WEC on

General · WEC Series

The unit is started from the main panel, not by plugging it in.

  1. Press and hold the [Power] button on the main panel for more than 3 seconds.

Applies to: WEC600

Source: Navien WEC600 service manual, p. 6. Written in our own words; check the manual for your exact model.

Cancel the cascade setting

Tankless water heater · Navien NPN

Undoes the main/sub pairing from the main heater.

  1. On the main unit hold Diagnostic + Reset for 5 seconds.

Applies to: NPN-160U/180U/199U, NPN-120E/160E/180E/199E

Source: Navien NPN-U/NPN-E Installation Manual, 5.2.1 Configuring the Communication Settings, p.58. Written in our own words; check the manual for your exact model.

Clear all timer settings

Tankless water heater · NPE

Clears every saved timer on the remote. Only works with NPN non-condensing water heaters.

  1. Press and hold the Timer and OK buttons together for 2 seconds.
  2. Watch for 'CLR' on the display for 3 seconds. All timer settings are then cleared.

Applies to: NPE with NPN non-condensing water heaters

Source: Navien NPE remote controller manual, p. 24. Written in our own words; check the manual for your exact model.

Factory reset the panel and main controller

Tankless water heater · Navien NPE-2

Resets the panel and main controller parameters from the installer menu.

  1. Hold Menu and Back together for 3 seconds.
  2. Open 1. Installer Menu (password 1234).
  3. Choose 6. Factory Reset.

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 7.4.2 p.95-96; 7.5 p.98-99, p.105-107. Written in our own words; check the manual for your exact model.

Remove a cascade (Cascade System Removal)

Tankless water heater · Navien NPE-2

Cascade removal is under the Cascade Status and Set menu of the hidden service menu.

  1. Hold Menu and Back together for 3 seconds.
  2. Open 2. Cascade Status and Set.
  3. Choose 4. Cascade System Removal.

Applies to: NPE-A2, NPE-S2

Source: Navien NPE-A2/S2 Installation Manual, 3.8.2 and 5.2.1, p.61, 73. Written in our own words; check the manual for your exact model.

Reset one parameter to its default

Tankless water heater · Navien NPE-2

Returns a single installer parameter to its factory value without touching the others.

  1. Open the parameter in edit mode (Menu + Back 3 s > 1. Installer Menu > 2. Parameter Settings).
  2. Hold Back for 5 seconds while editing.

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 7.5.1.2 Setting the Operation Parameters, p.99-100. Written in our own words; check the manual for your exact model.

Resetting the water heater

Tankless water heater · NPN

Minor problems may clear after a reset.

  1. Press the Reset button on the front panel, or press the OK button on the remote controller.

Applies to: NPN indoor and outdoor models

Source: Navien NPN user's information manual, p. 21. Written in our own words; check the manual for your exact model.

Scale warning: deactivate the alarm

Tankless water heater · NPE

The scale alarm shows when the water heater needs cleaning. The scale warning interval can be changed.

  1. Clean the water heater as needed.
  2. Press and hold the OK button for 2 seconds to deactivate the scale alarm.
  3. 'RST' shows for 3 seconds when the alarm is cleared.

Applies to: NPE water heaters

Source: Navien NPE remote controller manual, p. 27. Written in our own words; check the manual for your exact model.

Cancel all timer settings

Water heater · NPE

Clears every recirculation reservation at once. CLR shows for 3 seconds when done. Only available when NPN non-condensing water heaters are connected.

  1. Press and hold the Timer and OK buttons together for 2 seconds.
  2. Confirm CLR appears for 3 seconds, which means all timer settings are cleared.

Applies to: NPN non-condensing water heaters only

Source: Navien NPE remote controller manual, p. 24. Written in our own words; check the manual for your exact model.

Canceling all timer settings

Water heater · NPN

Clears all reservation and recirculation timer settings at once.

  1. Press and hold the Preheat & Timer and OK buttons together for 2 seconds.
  2. 'CLR' shows for 3 seconds and all timer settings are cleared.

Applies to: NPN outdoor models with remote controller

Source: NPN user's information manual, p. 15. Written in our own words; check the manual for your exact model.

Clear a level 1 error from the panel

Water heater · NWP500

Level 1 errors can be cleared from the front panel when the problem is resolved.

  1. Press Back to clear the level 1 error.
  2. Or press and hold Back for 5 seconds.
  3. If the problem is still present, the error stays.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 user information manual, p. 20. Written in our own words; check the manual for your exact model.

Clearing a level 1 error

Water heater · NWP500

The display flashes red with a flashing error icon on a level 1 error. Operation continues. Level 1 errors clear on their own once the cause is gone. You can also clear them manually.

  1. Press OK to enter error display mode if needed.
  2. Press Back to clear the error; it only clears if the problem is solved.
  3. Or press and hold Back for 5 seconds to clear it; it only clears if the problem is solved.

Applies to: Level 1 errors

Source: Navien NWP500 installation manual, p. 52. Written in our own words; check the manual for your exact model.

Factory reset (Initialize all parameter settings)

Water heater · NWP500

Factory reset returns all panel and main controller parameters to factory default. The Start Wizard runs after the reset.

  1. Hold Menu and Back for more than 5 seconds and select Factory Reset.
  2. Select Yes and press OK to initialize all settings.
  3. Wait for the reset status on the front panel; the Start Wizard then runs.
  4. Select No or press Back to cancel.

Applies to: NWP500 series

Source: Navien NWP500 installation manual, p. 60. Written in our own words; check the manual for your exact model.

Factory reset all parameters

Water heater · NWP500

Resets all parameter settings and data (panel and main controller) to factory default. The Start Wizard runs afterwards.

  1. Press and hold Menu and Back together for more than 5 seconds.
  2. Select Factory Reset.
  3. Choose Yes with Up/Down and press OK. Choose No or press Back to cancel.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 user information manual, p. 24. Written in our own words; check the manual for your exact model.

Reset button after an error

Water heater · NPN

The Reset button resets the water heater when an error occurs.

  1. Press the Reset button on the front panel after an error appears.
  2. If the error code remains, note it and check the error code section of the manual.

Applies to: Indoor models with front panel

Source: Navien NPN user's information manual, p. 8. Written in our own words; check the manual for your exact model.

Reset the water heater

Water heater · NWP500

Use this first for minor problems before trying the remedies in the troubleshooting chart.

  1. Press the Back button on the front panel.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 71. Written in our own words; check the manual for your exact model.

Reset the water heater for minor problems

Water heater · NWP500

A reset may clear minor problems.

  1. Press the Back button on the front panel to reset the water heater.
  2. If the problem remains, follow the remedies in the troubleshooting section or call Technical Support.

Applies to: NWP500 series

Source: Navien NWP500 User's Information Manual, p. 32. Written in our own words; check the manual for your exact model.

Resetting the water heater after an error

Water heater · NPN

Use this when an error message is shown. If the reset does not clear the problem, use the troubleshooting section or contact technical support.

  1. Indoor models: press the Reset button on the front panel.
  2. Outdoor models with remote controller: press the OK button once; 'RST' appears on the LCD.

Applies to: NPN indoor and outdoor models

Source: NPN user's information manual, p. 12. Written in our own words; check the manual for your exact model.

Settings shortcuts

Where the useful parameters live and what they are set to from the factory.

Open air handler application settings

Air handler · H2Air

Air handler (AHU) settings are in the application settings menu on the NPE-A2/S2 water heater.

  1. Open the Installer Menu and select 3. Application Settings.
  2. Select 3. Air handler Unit.
  3. Use the Up or Down button to move between parameters or change a value.
  4. Press OK to select a parameter or to confirm a change.

Applies to: NPE-A2/S2 water heater with H2Air

Source: Navien H2Air installation manual, p. 27. Written in our own words; check the manual for your exact model.

24-hour program timer for space heating

Boiler · CH-ASME

Sets the weekly heating time blocks on the 24-hour program. Blocks that are solid turn heating on for that period.

  1. Tap Program to open the 24-hour timer.
  2. Use the center dial to move the cursor when the clock flashes.
  3. Tap Heating to make each block solid (enabled) or blank (disabled).
  4. Leave the remote alone; the changes save automatically.

Applies to: Remote controller program timer

Source: Navien CH-ASME user's operation manual, p. 21. Written in our own words; check the manual for your exact model.

Adjust DHW temperature

Boiler · NCB700

DHW temperature is set from normal operation with the Command dial. The value flashes while it is being changed.

  1. In normal operation mode, turn the Command dial right to select the DHW temperature.
  2. Press the Command dial to select it. The value flashes.
  3. Turn the dial right or left to change the temperature.
  4. Press the Command dial to confirm.
  5. Press Back to return to normal mode.

Applies to: NCB700 all models

Source: Navien NCB700 installation & operation manual, p. 115-116. Written in our own words; check the manual for your exact model.

Adjust space heating temperature from normal mode

Boiler · NCB700

The space heating set point is changed on the dial in normal operation. It cannot be changed while Outdoor Reset Control is active. If the outdoor sensor fails, the boiler runs at the set temperature. Note the original value before changing it.

  1. In normal operation mode, turn the Command dial until the space heating temperature is highlighted.
  2. Press the Command dial to select it. The value flashes.
  3. Turn the dial right or left to raise or lower the temperature.
  4. Press the Command dial to confirm. The value is stored once it stops flashing.
  5. Press Back to return to normal mode.

Applies to: NCB700 all models

Source: Navien NCB700 installation & operation manual, p. 114-115. Written in our own words; check the manual for your exact model.

Allow the BAS to switch the boilers on and off

Boiler · NFB700

To let the building automation system turn the boilers on or off while Modbus is enabled, use one of the two methods below.

  1. Set main DIP switch 7 to ON (Space Heating Thermostat-Unused), or
  2. Short the T/S ZONE3 port.

Applies to: NFB700-500C/600C/800C/1000C with Modbus RTU enabled

Source: Navien Modbus RTU installation & operation manual, p. 4. Written in our own words; check the manual for your exact model.

Change gas type with DIP switch 2

Boiler · Navien NHB-H

DIP switch 2 #1 sets natural gas or propane and must match the rating plate and the Start-up Wizard.

  1. Turn power off before removing the front cover.
  2. DIP switch 2, #1: OFF = natural gas, ON = propane.
  3. SW2 #1 must match the gas on the rating plate (E788 if wrong).

Applies to: Navien NHB-H condensing boilers: NHB-150H, NHB-110H, NHB-080H, NHB-055H

Source: Navien NHB-H Installation and Operation Manual, 6.2 DIP Switch 2, p.68-69; 3.5 Air Handler Interface p.28; 10 Installation Checklist p.96. Written in our own words; check the manual for your exact model.

Choose hot water control sensor (supply or return)

Boiler · Combination boiler

Selects whether hot water temperature is controlled from the supply water sensor or the return water sensor.

  1. Turn the remote controller off with the ON/OFF button.
  2. Press Program and Heating together and hold for 3 seconds. The supply or return heating icon starts flashing.
  3. Press Heating to switch the icon between supply water and return water.
  4. Leave the dial alone. The setting saves automatically and the remote returns to OFF.

Applies to: Navien combination boiler remote controller

Source: Navien combination boiler user's operation manual, p. 25. Written in our own words; check the manual for your exact model.

Configure zone control from the front panel

Boiler · NCB700

Zone control supports up to 3 zones using zone valves or zone pumps. The boiler's operation must be set from the front panel after the system is installed.

  1. Press the Menu button on the front panel to open the settings menu.
  2. Select 1-2 Zone Settings, then select 2 Zone Settings.
  3. Set the zone options to match the installed zone valves or pumps.

Applies to: NCB700 zone systems

Source: Navien NCB700 installation and operation manual, p. 197. Written in our own words; check the manual for your exact model.

Default BACnet Network Number is 50

Boiler · Modbus/BACnet Gateway

Change it only when more than one gateway shares the subnet.

Applies to: BACnet network

Source: Modbus/BACnet Gateway Start-up Guide, p. 22. Written in our own words; check the manual for your exact model.

Default Primary Connection is Ethernet

Boiler · Modbus/BACnet Gateway

Out of the box the gateway prefers the Ethernet port. Switch to Wi-Fi only if the gateway runs on Wi-Fi client alone.

Applies to: Gateway common settings

Source: Modbus/BACnet Gateway Start-up Guide, p. 17. Written in our own words; check the manual for your exact model.

Default Wi-Fi AP channel is 11

Boiler · Modbus/BACnet Gateway

The gateway Wi-Fi access point starts on channel 11 unless changed.

Applies to: Gateway Wi-Fi AP

Source: Modbus/BACnet Gateway Start-up Guide, p. 23. Written in our own words; check the manual for your exact model.

Enable zone pump 4

Boiler · NCB700

Zone pump 4 replaces the DHW recirculation pump on the boiler's connection to run a fourth heating zone. Each zone pump is rated max 2.5 A.

  1. From the front panel, press Menu and select 2. Space Htg Operation > 2. Zone Settings > Zone Pump System.
  2. Or on the main panel, press Back and Menu together for 3 seconds, then select 3. Parameter Settings > 16. Zone4 Settings > Enable.
  3. Note that zone 4 pump runs on the recirculation thermostat input.
  4. Note that with Zone4 Settings enabled, DHW recirculation is not available even in zone valve mode. Disable this parameter if DHW recirculation is needed.

Applies to: NCB700 with 4-zone pump system

Source: NCB700 Installation & Operation Manual, p. 51. Written in our own words; check the manual for your exact model.

Heat capacity limit (whole system)

Boiler · Combination boiler

Restricts the total heat output of the boiler. Adjustable from 30 to 100 %.

  1. Turn the remote controller off with the ON/OFF button.
  2. Press DHW and Stand By together to enter heat capacity control mode.
  3. Press DHW and Heating together and hold for 3 seconds. The clock starts rotating clockwise and the current capacity shows.
  4. Turn the center dial to set the capacity between 30 and 100 %.
  5. Press Program to save. The remote returns to OFF.

Applies to: Navien combination boiler remote controller

Source: Navien combination boiler user's operation manual, p. 24. Written in our own words; check the manual for your exact model.

Opening the cascade vent type setting

Boiler · NCB700

Shortcut into the cascade menu to set the common vent type.

  1. Press the Back button and the Menu button together and hold for 3 seconds.
  2. Select '4. Cascade Status and Set'.
  3. Turn the Command dial to move between parameters or change a value.
  4. Press the Command dial to select '7. Vent Type Setting'.
  5. For the vent type options, see section 12.6.4 (Configuring a Cascade System).

Applies to: NCB700-190/060, NCB700-190/080, NCB700-240/110, NCB700-240/130, NCB700-250/150

Source: Navien NCB700 installation and operation manual, p. 101. Written in our own words; check the manual for your exact model.

Pre-heating (space heating timer) setup

Boiler · CH-ASME

Set the heating time blocks on the clock, then save. Pre-heating only runs while the remote is on.

  1. Turn the remote off with the ON/OFF button, then turn it back on if needed.
  2. When the clock flashes with the cursor, use the center dial to move the cursor.
  3. Press Heating to make each time block solid (on) or blank (off).
  4. Press and hold Stand By and Program together for 3 s to save.

Applies to: Remote controller pre-heating schedule

Source: Navien CH-ASME user's operation manual, p. 17. Written in our own words; check the manual for your exact model.

Set the altitude with DIP switch 2

Boiler · Navien NHB-H

DIP switch 2 #2 and #3 select the altitude band.

  1. 0-1,999 ft: 2 OFF, 3 OFF.
  2. 2,000-5,399 ft: 2 ON, 3 OFF.
  3. 5,400-7,699 ft: 2 OFF, 3 ON.
  4. 7,700-10,100 ft: 2 ON, 3 ON.

Applies to: Navien NHB-H condensing boilers: NHB-150H, NHB-110H, NHB-080H, NHB-055H

Source: Navien NHB-H Installation and Operation Manual, 6.2 DIP Switch 2, p.68-69; 3.5 Air Handler Interface p.28; 10 Installation Checklist p.96. Written in our own words; check the manual for your exact model.

Set the clock on the remote controller

Boiler · CH ASME

Hold the Program button for 3 seconds to start clock setting. The minutes blink first. Adjust them with the center dial, then press Program to move to the hour. Adjust the hour with the dial, then press Program to set AM/PM. Leave it alone and the display saves the setting automatically.

  1. Hold Program for 3 seconds until the minutes blink.
  2. Turn the center dial to set the minutes.
  3. Press Program to move to the hour and turn the dial to set it.
  4. Press Program to set AM or PM.
  5. Wait and the clock saves automatically.

Applies to: Remote controller clock

Source: Navien CH ASME User's Operation Manual, p. 15. Written in our own words; check the manual for your exact model.

Set the DHW weekly recirculation schedule

Boiler · NCB700

Weekly recirculation is set in 30 minute steps. Pick 1 Day, 3 Day or 7 Day in the Weekly option to reach the schedule screen.

  1. Select Weekly in the recirculation menu.
  2. Choose 1 Day, 3 Day or 7 Day.
  3. Turn the Command dial to the wanted time. Times are in 30 minute steps.
  4. Press and hold the Command dial for more than 2 seconds to save the schedule.

Applies to: DHW recirculation weekly schedule

Source: Navien NCB700 installation & operation manual, p. 123. Written in our own words; check the manual for your exact model.

Set the space heating control method for a universal sensor

Boiler · NCB700

Use this when the boiler controls supply or return water temperature with a universal temperature sensor.

  1. Install the supply sensor (recommended) and optional return sensor on the piping, wrapped with insulation.
  2. On the front panel, press Menu to open the settings menu.
  3. Select 2. Space heating operation, then 5. Space heating control method (CL).
  4. Choose the control mode that matches the sensor installed.

Applies to: NCB700 with universal temperature sensors

Source: Navien NCB700 installation and operation manual, p. 59. Written in our own words; check the manual for your exact model.

Set up universal supply/return temperature sensor control

Boiler · NCB700

Universal temperature sensor (part no. GXXX001769) controls supply or return water temperature. Supply sensor is recommended; return sensor is optional.

  1. Press the Menu button to enter the setting menu.
  2. Select 2. Space Htg Operation, then 5. SH Control Method.
  3. Choose the control mode that matches the sensor used (supply or return).
  4. Wrap the sensor and the pipe section with thermal insulation for best performance.
  5. Secure the sensor with a cable tie.

Applies to: NCB700 with universal temperature sensor

Source: NCB700 Installation & Operation Manual, p. 50. Written in our own words; check the manual for your exact model.

Space heating and DHW controls on the touchscreen

Boiler · NFB

Basic on/off and temperature control from the home screen.

  1. Tap SH ON (top left) to turn space heating on or off.
  2. Tap DHW ON (top right) to turn domestic hot water on or off.
  3. Tap the SH Set Temp menu to change the space heating setpoint.
  4. Tap the DHW Set Temp menu to change the DHW indirect supply temperature.
  5. Tap the Control button, then Status, to view boiler information.

Applies to: NFB-301C/399C

Source: Navien NFB-C quick installation guide, p. 4. Written in our own words; check the manual for your exact model.

Supply water pressure setting

Boiler · Combination boiler

Sets the supply water pressure value used by the boiler. The valid range is 12 to 25. The manual does not state the unit.

  1. Turn the remote controller off with the ON/OFF button.
  2. Press Heating and hold for 3 seconds. PS shows in the clock and the pressure value flashes where the temperature normally shows.
  3. Turn the dial to pick a value from 12 to 25.
  4. Press Program to save. The remote returns to OFF.

Applies to: Navien combination boiler remote controller

Source: Navien combination boiler user's operation manual, p. 27. Written in our own words; check the manual for your exact model.

Well pump on or off

Boiler · Combination boiler

Sets whether a well pump is used. The display shows C or S. C means no well pump.

  1. Turn the remote controller off with the ON/OFF button.
  2. Press DHW and hold for 3 seconds. IL P shows in the clock and C or S flashes in the temperature area.
  3. Press Heating to change the flashing value between C and S.
  4. Press Program to save. The remote returns to OFF.

Applies to: Navien combination boiler remote controller

Source: Navien combination boiler user's operation manual, p. 26. Written in our own words; check the manual for your exact model.

Change gas type with DIP switch 2

Combi boiler · Navien NCB-H

DIP switch 2 #1 sets natural gas or propane and must match the rating plate and the Start-up Wizard.

  1. Turn power off before removing the front cover.
  2. DIP switch 2, #1: OFF = natural gas, ON = propane.
  3. A gas type that does not match the rating plate can show E773/E788.

Applies to: NCB-250/150H, NCB-240/130H, NCB-240/110H, NCB-190/080H, NCB-190/060H

Source: Navien NCB-H Installation & Operation Manual, 6.2 DIP Switch 2, p.76-77. Written in our own words; check the manual for your exact model.

Set the altitude with DIP switch 2

Combi boiler · Navien NCB-H

DIP switch 2 #2 and #3 select the altitude band.

  1. 0-1,999 ft: 2 OFF, 3 OFF.
  2. 2,000-5,399 ft: 2 ON, 3 OFF.
  3. 5,400-7,699 ft: 2 OFF, 3 ON.
  4. 7,700-10,100 ft: 2 ON, 3 ON.

Applies to: NCB-250/150H, NCB-240/130H, NCB-240/110H, NCB-190/080H, NCB-190/060H

Source: Navien NCB-H Installation & Operation Manual, 6.2 DIP Switch 2, p.76-77. Written in our own words; check the manual for your exact model.

Auto-save of parameter changes

Furnace · NPF

A changed parameter is saved automatically if there is no input for 10 seconds in Parameter Edit mode.

  1. Change the value.
  2. Leave the controls untouched for 10 seconds to save, or press OK to confirm.

Applies to: NPF700 60/80/100 MBH

Source: Navien NPF installation and operation manual, p. 114. Written in our own words; check the manual for your exact model.

Clear error 788 after a propane conversion

Furnace · NPF

After changing DIP switch 1 to propane, the furnace shows error 788 until the gas type is confirmed.

  1. With the error displayed, press the Back button to open the Gas Type Check under the Start-Up Wizard.
  2. Set the Gas Type Check option to Propane Gas.
  3. Confirm the gas type shows as changed in the Gas Conversion Kit Required option; the error clears and the furnace runs.

Applies to: NPF700 series furnaces

Source: Navien NPF Condensing Hydro-furnace installation and operation manual, p. 135. Written in our own words; check the manual for your exact model.

Display options

Furnace · NPF

Units, time format, backlight time and beep sound are set from the Configuration menu.

  1. Press the Menu button and select Configuration.
  2. Use Up or Down to pick an item, then press OK.
  3. Press Back to return to the previous menu.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 107. Written in our own words; check the manual for your exact model.

Parameter changes save automatically

Furnace · NPF

If no button is pressed for 10 seconds in Parameter Edit mode, the current value is saved on its own.

  1. Make the change.
  2. Wait 10 seconds without pressing a button, or press OK to confirm.

Applies to: NPF Condensing Hydro-furnace

Source: NPF Condensing Hydro-furnace installation and operation manual, p. 120-122. Written in our own words; check the manual for your exact model.

Parameter Edit navigation

Furnace · NPF

Parameters are reached from the Parameter Settings sub menu (HEAT, COOL/HP, FAN, Airflow, Protection, etc). Use Up/Down to move or change values, OK to select or confirm, and Back to return to the previous menu.

  1. Open the Parameter Settings sub menu.
  2. Select the group (for example HEAT, COOL / HP, FAN, Airflow, Protection, etc).
  3. Use Up or Down to pick a parameter or change its value.
  4. Press OK to select or confirm the change.
  5. Press Back to return to the previous screen.

Applies to: NPF700 60/80/100 MBH

Source: Navien NPF installation and operation manual, p. 112–120. Written in our own words; check the manual for your exact model.

Parameter editing: auto-save and reset to default

Furnace · NPF

In Parameter Edit mode, the value is saved automatically after 10 seconds with no input. Holding Back for 5 seconds resets that single parameter to its default value.

  1. Change the value with Up or Down.
  2. Press OK to confirm, or wait 10 seconds for auto-save.
  3. To reset one parameter to default, hold Back for 5 seconds in Parameter Edit mode.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 111. Written in our own words; check the manual for your exact model.

Read combustion and operation status

Furnace · NPF

Combustion view shows heat capacity, flame signal, inducer RPM and exhaust temperature. Operation view shows operating state and set heat stages.

  1. Press Menu, select Status Information, then Combustion.
  2. Read heat capacity, flame value (AD value), inducer fan RPM and exhaust temp.
  3. Press Back to exit.
  4. To check demand inputs, select Operation to see operation state and heat stage.

Applies to: All NPF700 models

Source: Navien NPF installation and operation manual, p. 104. Written in our own words; check the manual for your exact model.

Read the air-side status values

Furnace · NPF

Air readings show supply and return temperatures, rise, blower airflow and torque, plus outdoor and estimated indoor temperature.

  1. Press Menu and select Status Information.
  2. Select Air using the Up or Down button, then press OK.
  3. Scroll with Up or Down and press OK to view a value.
  4. Read supply air temp, return air temp, air temperature rise, blower CFM, RPM and torque.
  5. Outdoor temp shows only when a furnace outdoor sensor is installed.
  6. Press Back to leave the view.

Applies to: All NPF700 models

Source: Navien NPF installation and operation manual, p. 103. Written in our own words; check the manual for your exact model.

Read the water-side status values

Furnace · NPF

Water readings show supply and return water temperature, temperature rise, flow rate, flow valve state and pump status.

  1. Press Menu, select Status Information, then Water.
  2. Scroll with Up or Down and press OK to view each item.
  3. Check supply and return water temperature and the temperature rise between them.
  4. Check water flow rate, water adjust valve state and pump status.
  5. Press Back to exit.

Applies to: All NPF700 models

Source: Navien NPF installation and operation manual, p. 103. Written in our own words; check the manual for your exact model.

Thermostat system and fan switches

Furnace · NDF

On systems with air conditioning, the thermostat has two switches that control whether the furnace runs and how the blower behaves.

  1. Set the system switch to HEAT or AUTO for the furnace to run. Typical positions are HEAT, COOL and OFF; some thermostats also have AUTO.
  2. Set the fan switch to AUTO for normal operation, or to ON for continuous blower operation.
  3. The fan switch may be in either position when using the furnace.

Applies to: NDF forced air gas furnace with thermostat-controlled air conditioning

Source: Navien NDF installation and operation manual, p. 91. Written in our own words; check the manual for your exact model.

Set the real time and CIP operation time

General · WEC

Edit the clock or the CIP start time. The digital clock blinks when the setting mode is active. Editing order is hours, tens of minutes, ones of minutes. The clock returns to standby after 5 minutes without input.

  1. Press and hold Next for at least 3 seconds in normal operation, installation check or CIP mode.
  2. To set the clock, press OK to start, adjust with Next, and press OK to move between sections and confirm.
  3. To set CIP time, press Next once so the CIP logo blinks, then press OK and edit the same way.
  4. Press Back to go back a step or exit without saving at the hours setting.

Applies to: WEC600

Source: WEC Series service manual, p. 35. Written in our own words; check the manual for your exact model.

Set time after power loss

General · WEC Series

If power is lost for more than 30 minutes, the time must be set again. Note that the NDI modules flush every 24 hours even when the unit is powered off from the main panel.

  1. Long press Next to enter time setting.
  2. Use Next to increase the blinking value and OK to move to the next section.
  3. Press OK to confirm.

Applies to: WEC600

Source: Navien WEC Series service manual, p. 28. Written in our own words; check the manual for your exact model.

Adjust recirculation parameters P12, P14, P15

Tankless water heater · Navien NPN

Recirculation pump cycle, sampling time and differential OFF temperature are set in the R&D menu.

  1. Turn the unit off, press Up 3 times, Down 3 times, Up 4 times.
  2. Choose 2.PAR and press Info.
  3. Press Info to edit and use +/- to change; the value sends after Info or 10 s without input.
  4. Reset returns to the previous menu.

Applies to: Navien NPN non-condensing tankless water heaters: NPN-160U/180U/199U (universal, indoor or outdoor with vent kit) and NPN-120E/160E/180E/199E (outdoor only)

Source: Navien NPN-U/NPN-E Installation Manual, 3.4.2-3.4.3, p.26-29. Written in our own words; check the manual for your exact model.

Change gas type with the front panel DIP switch

Tankless water heater · Navien NPE-2

Front panel DIP switch 1 selects natural gas or propane; use it only after a gas conversion.

  1. Turn power off before changing DIP switches.
  2. Switch 1: OFF = natural gas (factory), ON = propane.
  3. Change it only after a gas conversion with the Navien kit; the unit shows E788 until the gas type is confirmed in the Start-Up Wizard.

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 3.8 Setting the DIP Switches, p.19, p.61; 8.1 p.112. Written in our own words; check the manual for your exact model.

Enable Commercial Mode (up to 185 F)

Tankless water heater · Navien NPE-2

Commercial Mode raises the allowed set temperature range; the front panel temperature lock must be off.

  1. Turn power off and set front panel DIP switch 2 (temperature lock) to OFF.
  2. Hold Menu + Back 3 s > 1. Installer Menu (password 1234) > 2. Parameter Settings.
  3. Open 12. Commercial Mode: Enable = 140-185 F, Disable = 97-140 F (default).

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 7.5.1.2 Setting the Operation Parameters, p.99-100. Written in our own words; check the manual for your exact model.

Lock the temperature setting (commercial lock, DIP switch 7)

Tankless water heater · Navien NPN

DIP switch 7 stops users changing the set temperature.

  1. Switch 7: OFF = temperature can be set, ON = temperature cannot be set.

Applies to: Navien NPN non-condensing tankless water heaters: NPN-160U/180U/199U (universal, indoor or outdoor with vent kit) and NPN-120E/160E/180E/199E (outdoor only)

Source: Navien NPN-U/NPN-E Installation Manual, 3.7 Setting the DIP Switches, p.19, p.48-49. Written in our own words; check the manual for your exact model.

Lock the temperature setting (front panel DIP switch 2)

Tankless water heater · Navien NPE-2

Front panel DIP switch 2 stops users changing the set temperature.

  1. Turn power off before changing DIP switches.
  2. Switch 2: OFF = temperature can be set, ON = temperature cannot be set.
  3. Keep it OFF if you want to use Commercial Mode.

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 3.8 Setting the DIP Switches, p.19, p.61; 8.1 p.112. Written in our own words; check the manual for your exact model.

Set the altitude setting

Tankless water heater · Navien NPE-2

Altitude is a numbered installer parameter on the NPE-2.

  1. Hold Menu + Back 3 s > 1. Installer Menu (password 1234) > 2. Parameter Settings.
  2. Open 14. Altitude Setting and pick 1 (0-2,000 ft), 2 (2,000-5,400 ft), 3 (5,400-7,700 ft) or 4 (7,700-10,100 ft). Default is 1.

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 7.5.1.2 Setting the Operation Parameters, p.99-100. Written in our own words; check the manual for your exact model.

Adjust tank temperature with Up and Down

Water heater · NWP500

Press Up or Down while the temperature is flashing. The new value is stored once the display stops flashing. Settings are kept during a power outage.

  1. Close all hot water faucets first.
  2. Press Up or Down until the target temperature shows.
  3. Wait for the display to stop flashing to save.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 User's Information Manual, p. 13. Written in our own words; check the manual for your exact model.

Adjusting the water temperature

Water heater · NPE

Temperature changes in 1°F (0.5°C) steps. The setting is saved automatically after about 5 seconds with no button press. Temperatures above 125°F (52°C) can scald.

  1. Press the Up or Down button to change the set temperature.
  2. Wait 5 seconds without pressing a button so the setting is saved.
  3. Stay within the range for the water heater type shown in the temperature range table.

Applies to: NR-21DU remote controller

Source: Navien NPE remote controller manual, p. 15. Written in our own words; check the manual for your exact model.

Change the tank temperature

Water heater · NWP500

Adjust the set temperature with the Up and Down buttons. The setting is stored once the display stops flashing.

  1. Make sure all hot water faucets are closed.
  2. Press Up or Down until the desired temperature shows on the display.
  3. Wait until the display stops flashing to store the setting.

Applies to: NWP500 all operating modes

Source: Navien NWP500 installation manual, p. 45. Written in our own words; check the manual for your exact model.

Changing the water temperature

Water heater · NPN

Close all hot water faucets and make sure the internal and any external circulator pumps are off before changing the setting. The new value is stored once the display stops flashing.

  1. Close all hot water faucets and confirm circulator pumps are off.
  2. Press the + (Up) or – (Down) button until the desired temperature shows on the display.
  3. Wait until the display stops flashing; the setting is then saved.

Applies to: NPN indoor and outdoor models

Source: NPN user's information manual, p. 11. Written in our own words; check the manual for your exact model.

Front panel temperature buttons

Water heater · NPN

The Up and Down buttons on the front panel change the hot water temperature.

  1. Press the Up button to increase the temperature.
  2. Press the Down button to decrease the temperature.
  3. Do not change the temperature while hot water is being used.

Applies to: Indoor models with front panel

Source: Navien NPN user's information manual, p. 6, p. 8. Written in our own words; check the manual for your exact model.

Open NPE-A2/S2 parameter settings

Water heater · H2Air

Parameter changes are made from the installer menu on the NPE-A2/S2 water heater.

  1. Open the Installer Menu and select 2. Parameter Settings.
  2. Use the Up or Down button to move between parameters or change a value.
  3. Press OK to select a parameter or to confirm a change.

Applies to: NPE-A2/S2 water heater with H2Air

Source: Navien H2Air installation manual, p. 26. Written in our own words; check the manual for your exact model.

Remote controller overrides DIP temperature

Water heater · CR, CC

With the remote controller connected, its setpoint is used. Disconnecting it drops the unit back to the DIP switch preset. The board does not store the remote setpoint in memory.

  1. Keep the remote connected to hold any temperature other than the four DIP presets.

Applies to: CR and CC water heaters with NR-1ODU

Source: CR-CC installation manual, p. 34. Written in our own words; check the manual for your exact model.

Set a recirculation timer schedule

Water heater · NPE

Programs up to three recirculation reservation schedules. Times are set in 30 minute increments. Only available when NPN non-condensing water heaters are connected.

  1. Press the Timer button twice to open Reservation Schedule #1.
  2. Press Up or Down to set the recirculation start time, then press OK.
  3. Press Up or Down to set the stop time, then press OK to save.
  4. Repeat for Reservation Schedules #2 and #3 if needed.
  5. During a scheduled period the preheating icon turns on and the reservation area flashes.

Applies to: NPN non-condensing water heaters only

Source: Navien NPE remote controller manual, p. 21-23. Written in our own words; check the manual for your exact model.

Set the clock

Water heater · NPE

Sets the controller time. Only available when NPN non-condensing water heaters are connected. Minutes are set first, then the hour.

  1. Press the Timer button for 2 seconds.
  2. Press Up or Down to set the minutes, then press OK.
  3. Press Up or Down to set the hour.
  4. Press OK to finish and save the time.

Applies to: NPN non-condensing water heaters only

Source: Navien NPE remote controller manual, p. 19-20. Written in our own words; check the manual for your exact model.

Setting the recirculation timer

Water heater · NPN

Recirculation timer times are set in 30-minute steps. This only works when external circulating pumps are connected and on. Up to three reservation schedules can be set.

  1. While setting the clock, press the Preheat & Timer button to enter the recirculation timer (Reservation Schedule #1).
  2. Set the activation time with Up or Down, then press OK to set the deactivation time.
  3. Set the deactivation time with Up or Down, then press OK to save.
  4. Repeat for Reservation Schedules #2 and #3 if needed.

Applies to: NPN outdoor models; A models with preheating function for the reservation icon

Source: NPN user's information manual, p. 14. Written in our own words; check the manual for your exact model.

Turn Lock Mode on or off

Water heater · NPE

Locks the front panel against accidental presses and child adjustment. With lock on, only the Lock button works, but errors can still be reset and settings can still be changed from the front panel.

  1. Press the Lock button for 2 seconds to turn Lock Mode on or off.
  2. Confirm the Lock icon shows on the display when active.

Applies to: NPE remote controller

Source: Navien NPE remote controller manual, p. 17. Written in our own words; check the manual for your exact model.

Commissioning

Start-up and set-up steps that are easy to miss.

Evacuation target after component replacement

Air conditioner · NAA

Pull the system down to this vacuum before opening the service valves and charging.

  1. Pull the vacuum to 350 microns with a vacuum pump.
  2. Open the service valves after the vacuum is complete.
  3. Charge refrigerant if a recovery unit is used.

Applies to: NAA17V36 and NAA17V60

Source: Navien NAA air conditioner service manual, p. 52. Written in our own words; check the manual for your exact model.

Installation limits and pre-start checks

Air conditioner · NAA

Confirm the site and piping limits before starting the unit.

  1. Confirm the site is no higher than 10,000 ft (3000 m) above sea level.
  2. Keep the maximum lineset at 100 ft and the maximum vertical lift at 50 ft.
  3. Add a trap if vertical lift is over 16 ft (see manual p. 16).
  4. Match the indoor unit to the correct TXV and approved AHRI-listed indoor match.
  5. Check that the vapor and liquid lines are the right size for the unit capacity.
  6. Locate the unit away from windows, patios, and decks to limit noise.
  7. Check that factory tubing on both units has not shifted in shipping and is not rubbing on other tubing or sheet metal.
  8. Check that TXV feeder tube wire ties are secure and tight.

Applies to: NAA17V36-24K/36K and NAA17V60-48K/60K

Source: Navien NAA air conditioner service manual, p. 11. Written in our own words; check the manual for your exact model.

Assign a unique Node-ID to each attached device

Boiler · Modbus/BACnet Gateway

Each device on the gateway needs its own Node-ID between 1 and 255. Write the value down, because the BACnet device instance is derived from it. Modbus TCP/IP Node-IDs follow the device Node-ID automatically.

  1. Set a unique Node-ID from 1 to 255 on each attached device.
  2. Record each Node-ID for later use in the BACnet device instance setup (section 6.3).

Applies to: All devices attached to the gateway

Source: Modbus/BACnet Gateway Start-up Guide, p. 7. Written in our own words; check the manual for your exact model.

Assign sub water heater IDs in a cascade

Boiler · NCB700, NPE-A2

Each sub NPE-A2 water heater is given an ID from the main boiler setup. Repeat for every sub unit in the cascade.

  1. On the sub NPE-A2 panel, press and hold the OK button for 3 seconds.
  2. Confirm the display shows 'ID 1. Allocated!' and the sub icon appears.
  3. Repeat for each remaining sub water heater.
  4. On the main NCB700 panel, press the Command dial when the cascade screen appears.
  5. Check that the water heater displays return to temperature display.

Applies to: NCB700 cascade with NPE-A2 sub water heaters

Source: Navien NCB700 Installation & Operation Manual, p. 88. Written in our own words; check the manual for your exact model.

Backflow damper required in a cascade common vent

Boiler · NCB700

A backflow device must be fitted when a cascade shares a common vent, so exhaust does not enter the building.

  1. Fit a backflow damper (back-draft damper) on each boiler's common vent collar kit.

Applies to: NCB700-190/060, NCB700-190/080, NCB700-240/110, NCB700-240/130, NCB700-250/150

Source: Navien NCB700 installation and operation manual, p. 96. Written in our own words; check the manual for your exact model.

Bias resistors: enable at one point only

Boiler · Modbus/BACnet Gateway

Enable bias on just one point of the RS-485 bus. The bus is designed so many gateways can share the network without exceeding the bias resistor limit of under 500 ohms.

  1. Check that bias is enabled at only one point on the bus.
  2. Power cycle the gateway after changing the DIP switches.

Applies to: RS-485 bus with multiple devices

Source: Modbus/BACnet Gateway Start-up Guide, p. 8. Written in our own words; check the manual for your exact model.

Category IV positive-pressure venting

Boiler · NCB700

The boiler is Category IV and runs its vent under positive pressure. It must not share a vent with natural draft appliances.

  1. Vent exhaust directly outdoors using the specified vent materials.
  2. Do not connect natural draft appliance vents to the boiler's positive-pressure vent.
  3. Seal the vent system gastight at every joint.
  4. Do not connect this boiler vent to another boiler or a vent stack.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 60. Written in our own words; check the manual for your exact model.

Check the box contents before installation

Boiler · NCB700

Items supplied with the boiler, to be ticked off before installing.

  1. Confirm the installation and operation manual and user information manual are present.
  2. Confirm the quick installation guide is present.
  3. Confirm two 2 in vent outlet caps.
  4. Confirm four 2 in wall escutcheons.
  5. Confirm the wall mounting bracket.
  6. Confirm four self-tapping screws and anchors.
  7. Confirm the heating system relief valve.
  8. Confirm the conversion kit (propane and natural gas high altitude). It is fixed inside the casing once the front cover is removed.
  9. Confirm the universal vent adapter.
  10. Confirm the outdoor temperature sensor and cable.

Applies to: All NCB700 models

Source: navien_ncb700-installation-and-operation-manual.pdf, p. 168. Written in our own words; check the manual for your exact model.

Conversion label placement

Boiler · NCB-H

Once CO2 or offset values are confirmed, the conversion labels show the unit is set for propane.

  1. Place the conversion labels next to the rating plate.
  2. Check the conversion kit number first, since the rating plate differs by model.

Applies to: NCB-H after LP conversion

Source: Navien NCB-H LP gas and high altitude conversion guide, p. 2. Written in our own words; check the manual for your exact model.

Enable Modbus RTU from the EMS menu

Boiler · NFB700

Modbus is off by default and must be turned on at the boiler controller before the building automation system can talk to it.

  1. Tap the EMS button.
  2. Tap EMS Set.
  3. On the Modbus RTU menu, tap Enabled.

Applies to: NFB700-500C/600C/800C/1000C

Source: Navien Modbus RTU installation & operation manual, p. 3. Written in our own words; check the manual for your exact model.

Enable or disable pump activation by boiler in a cascade

Boiler · Combination boiler

Sets whether each boiler in a cascade is allowed to switch on its pump. C means disabled and S means enabled.

  1. Turn the remote controller off with the ON/OFF button.
  2. Press and hold DHW, Stand By and Heating together for 3 seconds.
  3. When the current state (C disable or S enable) flashes, press Heating to change it.
  4. Press Program to save. The remote returns to OFF.

Applies to: Navien boilers in cascade

Source: Navien combination boiler user's operation manual, p. 29. Written in our own words; check the manual for your exact model.

Factory jumper on boiler wiring

Boiler · NCB700

A factory jumper is installed by default. It must be removed when an additional appliance is connected.

  1. Remove the factory jumper when using an additional appliance.

Applies to: NCB700 boiler wiring

Source: Navien NCB700 installation and operation manual, p. 146. Written in our own words; check the manual for your exact model.

Flush, purge and fill before startup

Boiler · NCB-H, NFC Series

Remove pipe debris from the system before the first firing.

  1. Flush the piping system to remove excess pipe debris.
  2. Purge air from the system.
  3. Fill the system.
  4. Check the piping for leaks before initial operation of the heating system.

Applies to: NCB-H and NFC Series boiler with primary manifold

Source: Navien NCB-H, NFC Series Primary Manifold installation instructions, p. 2. Written in our own words; check the manual for your exact model.

Flushing and trial run checks

Boiler · NFB

Clean the strainers after the first run and complete the trial run per the installation checklist.

  1. Run the boiler for the first 10 minutes, then turn it off.
  2. Clean the cold water filter and the space heating return strainer.
  3. Perform a trial run using the Installation checklist in the Installation & Operation Manual.
  4. Confirm at least one carbon monoxide detector is installed in the living space before start-up.

Applies to: NFB-301C/399C

Source: Navien NFB-C quick installation guide, p. 2, 4. Written in our own words; check the manual for your exact model.

Gas supply piping checks

Boiler · NCB700

Gas connection rules to follow before the boiler is started.

  1. Measure the gas supply pressure at the main line and clear any debris from the gas line before connecting.
  2. Size the gas line and connection using the gas pipe sizing tables. Connections are 3/4 in. A 1/2 in rigid pipe is allowed only where local codes permit it.
  3. Do not use 1/2 in corrugated connectors or hoses, because they can cause noise. Keep flexible lines free of kinks.
  4. Use two wrenches on boiler gas fittings: one to hold the boiler connector and one to tighten the fitting.
  5. Support the gas piping separately. The boiler and its accessories must not carry the pipe weight.
  6. Install a manual gas shutoff valve between the supply line and the boiler.
  7. Where possible, connect the boiler as the first appliance downstream of the gas meter. The meter capacity must be at least the total connected appliance load.
  8. Leak test the boiler and gas connections with a bubble solution. Never use a flame to find leaks.
  9. If a leak is found, shut the boiler and gas off and repair it before restarting.

Applies to: NCB700 condensing combi-boiler

Source: Navien NCB700 installation and operation manual, p. 63-64. Written in our own words; check the manual for your exact model.

Gas valve O-ring and fittings

Boiler · NCB-H

Replace the gas valve outlet adapter and secure all connections without overtightening. A damaged or missing O-ring causes a gas leak.

  1. Inspect the O-ring between the gas valve and inlet adapter every time they are disassembled.
  2. Check for gas leaks after reassembly.

Applies to: NCB-H gas valve assembly

Source: Navien NCB-H LP gas and high altitude conversion guide, p. 1-2. Written in our own words; check the manual for your exact model.

Install a NaviClean filter in the system return

Boiler · NCB700

Put a NaviClean filter in the system return line to catch debris. Debris left in the water circuit can cause abnormal system operation.

  1. Install a NaviClean filter in the system return.
  2. Use it in all air-handler and system piping layouts shown in this section (recommended).

Applies to: NCB700 combi-boilers, system piping

Source: Navien NCB700 installation and operation manual, p. 200. Written in our own words; check the manual for your exact model.

Install the Wi-Fi antenna

Boiler · Modbus/BACnet Gateway

The Wi-Fi antenna screws onto the front of the unit. An external antenna can be used instead by plugging it into the SMA connector. The best antenna depends on range, terrain and obstacles between the two radios.

  1. Screw the Wi-Fi antenna into the front of the unit.
  2. Or plug an external antenna into the SMA connector.

Applies to: Modbus/BACnet gateway GXXX001932

Source: Modbus/BACnet Gateway Start-up Guide, p. 7. Written in our own words; check the manual for your exact model.

Installation checklist: gas, water, heating and relief valve

Boiler · NCB700

Gas, domestic water, space heating and pressure relief items to confirm before commissioning.

  1. Confirm gas type matches the rating plate. Confirm gas line is at least 1/2 or 3/4 in ID and long enough for the BTU load.
  2. Measure gas supply pressure and confirm it is within the manual's range.
  3. Confirm a manual shut-off valve is on the gas line, and test the line and fittings for leaks.
  4. Confirm domestic water supply pressure is greater than 40 psi.
  5. Install shut-off valves on inlet and outlet for filter cleaning, bleed air at each fixture, and clean the inlet water filter.
  6. Insulate hot water and return lines if a recirculation line is used.
  7. Confirm the system is filled to under 30 psi and purged of air.
  8. Confirm air removal means are in the piping, and that an expansion tank is set to the correct system pressure.
  9. If propylene glycol is used, confirm type and concentration.
  10. If an external low water cut-off is used, confirm it is wired to the boiler.
  11. Confirm an approved pressure relief valve is on the top of the boiler, rated at or above the boiler BTU input, and 3/4 in on the space heating outlet.
  12. Run a discharge tube from the relief valve to within 6 to 12 in (150 to 300 mm) of the floor.
  13. Install a condensate drain line to a drain or laundry tub, and check the condensate pump if one is used.

Applies to: NCB700 installation

Source: Navien NCB700 installation and operation manual, p. 107-108. Written in our own words; check the manual for your exact model.

Installation checklist: power, DIP switches and owner handover

Boiler · NCB700

Electrical and PCB DIP switch checks and owner items before handing over the boiler.

  1. Confirm supply voltage is 110-120 V AC.
  2. Confirm the boiler is plugged into a properly grounded outlet.
  3. If hard-wired, install a power switch for maintenance access, and check electrical polarity.
  4. On DIP SW 2 (8 switch set), set switch 1 to ON for LP or OFF for NG, matching the gas type.
  5. Set switch 7 to ON if continuous boiler operation is required.
  6. Set switch 8 to ON if high temperature venting (CPVC or polypropylene) is installed.
  7. Show the owner how to clean the inlet water filter and how to shut off gas in an emergency.
  8. Leave the Installation & Operation Manual and User's Information Manual with the owner.

Applies to: NCB700 installation

Source: Navien NCB700 installation and operation manual, p. 108-109. Written in our own words; check the manual for your exact model.

Installation checklist: venting and combustion air

Boiler · NCB700

Items to confirm before leaving the boiler. Every item should be a Yes.

  1. Confirm clearances from building openings and intake air vents, and keep service clearances.
  2. Confirm make-up air is sufficient and free of dust, dirt, corrosive elements and flammable vapors.
  3. Keep the boiler and vent piping clear of combustible material such as clothing, cleaning supplies and rags.
  4. Vent with 2 in or 3 in PVC, CPVC, polypropylene, stainless steel, or Type BH special gas vent (ULC-S636) for Category IV in Canada, following local code and the manual.
  5. Do not use ABS or PVC cellular core pipe for venting.
  6. Slope the vent up toward termination at 1/4 in per foot (2% grade).
  7. Support all vent runs and the termination.
  8. Seal air intake and exhaust connections on flue and vent lines.
  9. Install vent screen caps on exhaust and intake pipes.
  10. Check the venting for leaks.
  11. Confirm vent termination is at least 12 in (300 mm) above exterior grade.
  12. Confirm total vent length is within the maximum allowed.

Applies to: NCB700 installation

Source: Navien NCB700 installation and operation manual, p. 107-109. Written in our own words; check the manual for your exact model.

Keep contaminated air away from combustion air intake

Boiler · NCB700

Dust, chemicals and corrosive vapors can damage the boiler and void the warranty. Use direct venting when the area is contaminated.

  1. Check the room for dust, sawdust, aerosols, chlorine or fluorine compounds, refrigerant leaks and similar sources before installing.
  2. Relocate the intake or use direct venting from outside air.
  3. Clean filters regularly in contaminated areas.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 59-60. Written in our own words; check the manual for your exact model.

Leak test the exhaust vent

Boiler · NCB700

Fire the boiler and check every vent joint for gas leaks with a bubble test kit before leaving the site. Leaking flue gas can expose occupants to carbon monoxide.

  1. Start the boiler.
  2. Apply bubble test solution to every exhaust vent joint.
  3. Look for bubbles, which show a leak.
  4. Fix any leak and retest.

Applies to: NCB700 exhaust vent joints

Source: Navien NCB700 installation and operation manual, p. 234. Written in our own words; check the manual for your exact model.

Number of boilers started first in a cascade

Boiler · Combination boiler

Sets how many units in a cascade start first when the system is powered up.

  1. Turn the remote controller off with the ON/OFF button.
  2. Press and hold DHW, Stand By and Program together for 3 seconds.
  3. When the number of operating units flashes on the display, turn the dial to set how many units start first.
  4. Press Program to save. The remote returns to OFF.

Applies to: Navien boilers in cascade

Source: Navien combination boiler user's operation manual, p. 28. Written in our own words; check the manual for your exact model.

Piping an air handler with its own internal pump

Boiler · NCB700

Air handlers with an internal circulator must be piped either with a connecting line to the AHU or in a primary or secondary arrangement with the boiler. A secondary piping layout helps the air handler keep good flow and heating output.

  1. Pipe the air handler with a connecting line to the AHU, or in a primary or secondary layout with the boiler.
  2. Use a secondary piping layout if the air handler must keep optimal flow and heating capacity.
  3. If flow interference occurs, the air handler circulator can be disconnected or disabled in the field.

Applies to: NCB700 with air handler (AHU) systems

Source: Navien NCB700 installation and operation manual, p. 200-201. Written in our own words; check the manual for your exact model.

Pre-service checks and safety rules

Boiler · Combination boiler

Only the parts the manual recommends may be repaired or replaced. Other service goes to an authorised service technician. Power and gas must be correct before the boiler runs.

  1. Turn off power to the boiler before any repair.
  2. Label all wires before disconnecting controls.
  3. Verify proper operation after servicing.
  4. Do not turn on the boiler unless the water and gas supplies are fully open.
  5. Do not turn on the boiler if the cold water supply shut-off valve is closed.
  6. Use only parts specified for this equipment.

Applies to: Navien combination boiler installation and service

Source: Navien combination boiler user's operation manual, p. 4. Written in our own words; check the manual for your exact model.

Propane and high altitude conversion

Boiler · NCB700

The boiler ships set for natural gas. Propane requires the Navien conversion kit; field conversion without it is not allowed and voids warranty. Natural gas units at 5,400 ft (1,646 m) or higher need the Natural Gas High Altitude Conversion Kit. Units rated to 10,100 ft (3,078 m).

  1. Check the rating plate against the gas type, gas pressure, water pressure and electrical supply before installing.
  2. Remove the front cover to reach the conversion kit attached inside the cabinet.
  3. Follow the conversion guide when installing the included gas orifice.

Applies to: Gas type and altitude changes

Source: Navien NCB700 installation and operation manual, p. 13. Written in our own words; check the manual for your exact model.

Set up a cascade (assign sub unit IDs)

Boiler · Navien NHB-H

The main boiler assigns IDs 1-16 to the sub boilers; only the main unit's settings are used. The Start function is available on NHB-110H/150H only.

  1. Hold Back and Menu together for 3 seconds on the main unit.
  2. Open 4. Cascade Status and Settings.
  3. Choose 1. Cascade System Setting and start it so the main assigns IDs to the subs.

Applies to: Navien NHB-H condensing boilers: NHB-150H, NHB-110H, NHB-080H, NHB-055H

Source: Navien NHB-H Installation and Operation Manual, 8 Installing a Cascade System p.72-76; 11.13.4 Configuring a Cascade System p.114-115. Written in our own words; check the manual for your exact model.

Use the correct conversion kit

Boiler · NCB-H

Do not use the high altitude kit for NG when converting to LP. For LP high altitude, use the LP kit.

  1. Confirm the kit label matches the gas type and altitude before starting.

Applies to: All NCB-H LP conversions

Source: Navien NCB-H LP gas and high altitude conversion guide, p. 1. Written in our own words; check the manual for your exact model.

Vent pipe insertion and connection

Boiler · NCB700

Cut and deburr the vent pipe square before fitting. Lubricate the pipe end with water only, never grease. Do not use primer or adhesive on the boiler connection. Never put an elbow directly on the exhaust collar; start the vent run with a straight pipe length.

  1. Mark the pipe 70 mm (2-3/4 in) from the end.
  2. Cut the pipe square at 90 degrees and deburr it.
  3. Lubricate the pipe end with water.
  4. Push the pipe into the collar with a twisting motion until it bottoms out, and the mark is no longer visible.
  5. Tighten the clamp with an 8 mm socket.

Applies to: NCB700 vent connection

Source: Navien NCB700 installation and operation manual, p. 232-233. Written in our own words; check the manual for your exact model.

Vent run slope and support

Boiler · NCB700

Horizontal vent runs must rise toward the termination and be supported at set intervals.

  1. Slope horizontal runs up toward the termination at 1/4 in per foot (2% slope).
  2. Support exhaust and intake pipes at least every 4 ft (1.2 m), or closer if local code requires.
  3. Keep the vent run as short and straight as possible and place the boiler close to the termination.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 60. Written in our own words; check the manual for your exact model.

Vent run support, slope and termination height

Boiler · NCB700

Support horizontal and vertical vent runs at least every 1.2 m (4 ft) or per local code. Slope horizontal runs up toward the vent outlet at 1/4 in per foot (2%). Keep the vent as short and straight as possible, and keep the boiler close to the vent outlet. Vent terminal must be at least 305 mm (12 in) above the maximum expected snow level or the local code height, whichever is higher. Snow-prone sites need a protected outlet.

  1. Install supports at no more than 1.2 m (4 ft) spacing.
  2. Slope horizontal pipe up toward the outlet at 1/4 in per foot.
  3. Check the terminal is at least 305 mm (12 in) above the expected snow line.
  4. Fit 45 or 90 degree elbows or tees at the outlet only if total pipe length, elbow count and air inlet distances still meet the rules.

Applies to: NCB700 vent layout

Source: Navien NCB700 installation and operation manual, p. 233-234. Written in our own words; check the manual for your exact model.

Vent termination location checks

Boiler · NCB700

Terminations must be placed clear of snow, public paths and openings.

  1. Keep the termination at least 12 in (305 mm) above the highest expected snow line, or higher if code requires.
  2. Protect the termination from snow blockage where snow accumulates.
  3. Keep the termination away from public walkways, soffit vents and crawl space vents.
  4. Do not store flammable or hazardous items near the termination.
  5. Elbows at the termination end are allowed if vent length, elbow count and clearances are within limits.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 62. Written in our own words; check the manual for your exact model.

Wi-Fi connection mode (partial)

Boiler · NCB700

Puts the boiler in Wi-Fi connection mode so the NaviLink app can register it. Only the final steps are on these pages.

  1. Press and hold the Power button to turn the boiler off.
  2. Press and hold the Menu button for 3 seconds to show the Wi-Fi connection ready screen.
  3. While in Wi-Fi connection mode, register the boiler in the NaviLink app.
  4. When registration succeeds, the panel shows Wi-Fi Connected and the boiler exits Wi-Fi mode and turns off.

Applies to: NCB700 series

Source: Navien NCB700 installation and operation manual, p. 134-135. Written in our own words; check the manual for your exact model.

120 V line connection checks

Furnace · NPF

Line voltage wiring must follow code and the rating plate, with a separate fused or breaker-protected branch circuit and a disconnect at the furnace.

  1. Confirm supply voltage, frequency and phase match the rating plate.
  2. Use a separate branch circuit with wire and fuse or breaker sized to the maximum overcurrent on the rating plate.
  3. Install an electrical disconnect at the furnace.
  4. Connect black to hot, white to neutral and green to ground per the wiring diagram on the blower door.
  5. Seal the cabinet opening to the junction box air tight with a UL approved bushing or non-reactive UL approved sealant when used in direct vent applications.

Applies to: NPF furnace 120 V line connections

Source: Navien NPF installation and operation manual, p. 78. Written in our own words; check the manual for your exact model.

Actual CFM may differ from setting

Furnace · NPF

The selected CFM may vary slightly from actual airflow because of installation conditions, and the setup wizard display can be about 1% off.

  1. Verify actual airflow with the installed ducting if precise CFM is needed.
  2. Adjust the airflow parameter if required, staying inside the listed range.

Applies to: NPF700 60/80/100 MBH

Source: Navien NPF installation and operation manual, p. 114, p. 118. Written in our own words; check the manual for your exact model.

Air intake location on 70K small and 105K large cabinets

Furnace · NDF

Side intake is recommended for ideal combustion air supply and ignition on these cabinet sizes.

  1. On the 70 kBTU small cabinet and 105 kBTU large cabinet furnaces, install the combustion air intake on the side of the furnace.

Applies to: 70 kBTU small cabinet and 105 kBTU large cabinet NDF furnaces

Source: Navien NDF installation and operation manual, p. 25. Written in our own words; check the manual for your exact model.

Ambient temperature and freeze protection

Furnace · NPF

The room temperature at the furnace must stay between 32°F (0°C) and 125°F (52°C). Protect the furnace and all water lines from freezing, including the drain traps, supply and drain lines.

  1. Confirm the installation room stays above 32°F (0°C) and below 125°F (52°C).
  2. Protect drain traps, supply and drain lines if the area may freeze.
  3. Accessory drain trap heaters and electric heat tape are recommended where freezing is possible.

Applies to: NPF condensing hydro-furnace, all models

Source: Navien NPF installation and operation manual, p. 5. Written in our own words; check the manual for your exact model.

Auto water fill connection

Furnace · NPF

The furnace has a motorized auto-fill valve. If a water line is available, connect it so the furnace fills itself. The valve can be moved to the left side of the furnace using the conversion section (2.14).

  1. Remove the rubber cap and the two screws from the auto water fill connection (upflow/downflow and horizontal models differ slightly).
  2. Install the auto water fill adapter with the removed screws.
  3. Connect an NPT 1/4 in pipe to the adapter.
  4. Check the water level on the front control panel after filling and refill if needed.
  5. Keep the water inlet plug and cover closed, or the interlock will stop the unit.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 43. Written in our own words; check the manual for your exact model.

Auxiliary drain pan under the evaporator coil

Furnace · NPF

Where required by approved regulations, install an auxiliary drain pan under the evaporator coil. It is needed where the condensate treatment system is used, where the coil drain pan may overflow, or where a clogged main condensate line could damage the building.

  1. Install an auxiliary drain pan under the evaporator coil where local rules or site conditions require it.
  2. Confirm the pan is installed in all areas where the furnace and structure need protection.

Applies to: NPF condensing hydro-furnace, all models

Source: Navien NPF installation and operation manual, p. 6. Written in our own words; check the manual for your exact model.

Canadian venting inspection and component rules

Furnace · NDF

ULC S636 venting must stay on one system and be inspectable.

  1. Keep the first 3 ft (900 mm) of venting readily visible for inspection.
  2. Use primers and glues from the same vent system manufacturer; do not mix brands.
  3. Do not interchange certified vent components with other systems or unlisted pipe and fittings.
  4. PVC vent terminations may use listed concentric kits (see section 10.3) or 45 and 90 degree elbows or a tee.
  5. PPE venting must end in 45 and 90 degree elbows.

Applies to: NDF600 series furnaces installed in Canada

Source: Navien NDF Forced Air Gas Furnace Installation and Operation Manual, p. 19. Written in our own words; check the manual for your exact model.

Check plate size against furnace model

Furnace · NPF700

Confirm that the back and front plates (60K or 100K) match the furnace model before assembly.

  1. Check the plate size (60K or 100K) against the furnace model.

Applies to: Return air box kit plates

Source: Navien return air box kit installation manual, p. 1. Written in our own words; check the manual for your exact model.

Combustible floor and clearance rules

Furnace · NDF

The furnace is certified only for wood combustible floors. Do not install it on carpet, tile or other combustible materials. Keep the area clear of combustibles and flammable vapors. Do not use the furnace area as a closet or storage.

  1. Install only on a wood floor or non-combustible base.
  2. Keep at least 24 in (610 mm) of front clearance for service.
  3. Keep the area free of combustibles, gasoline and flammable liquids.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 16. Written in our own words; check the manual for your exact model.

Combustion air from outdoors in corrosive areas

Furnace · NDF

If the area contains chemicals such as chlorine, bromine, fluorine, refrigerant or aerosols, use outdoor air for combustion. These form acids when burned that attack the heat exchanger.

  1. Check the installation area for listed chemicals and products.
  2. Pipe outdoor air to the furnace for combustion if any are present.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 14. Written in our own words; check the manual for your exact model.

Combustion air source and corrosive atmosphere

Furnace · NDF

Air for combustion must not come from a corrosive atmosphere. Corrosion-related failures are not covered by warranty.

  1. Check the site. Commercial buildings, indoor pools, laundry rooms, hobby or craft rooms and areas near chemical storage usually need outdoor combustion air.
  2. Make sure combustion air is free of sulphur, fluorine and chlorine (found in aerosols, detergents, bleaches, solvents, paint removers and refrigerants).
  3. Check local authority bylaws in addition to CAN/CGA-B149 or ANSI Z223.1.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace Installation and Operation Manual, p. 21. Written in our own words; check the manual for your exact model.

Condensate drain and pump

Furnace · NDF

If no suitable drain is near the furnace, use a condensate pump approved for furnace condensate. The pump drain tubing must not end outdoors.

  1. Check for a suitable drain near the furnace.
  2. If none exists, install an approved condensate pump.
  3. Route the pump discharge indoors; do not terminate it outdoors.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 13. Written in our own words; check the manual for your exact model.

Confirm a CO detector is installed before start-up

Furnace · NPF

The installer must verify that at least one carbon monoxide detector is installed in the living space before the furnace is put into operation. Follow local codes and CPSC/EPA guidance.

  1. Check that at least one CO detector is installed in the residential living space.
  2. Do not start the furnace until the detector is in place.

Applies to: NPF700 all models

Source: Navien NPF installation and operation manual, p. 24. Written in our own words; check the manual for your exact model.

Confirm venting and air openings before startup

Furnace · NPF

Check that the wall openings around the vent and air intake pipes are sealed so combustion products cannot enter the building. Check that the vent and intake terminals are clear of any obstruction.

  1. Inspect the outside wall penetrations around the vent and air intake pipes and confirm they are sealed.
  2. Confirm the vent and air intake terminals are not blocked.
  3. Do not operate the furnace without proper venting.

Applies to: NPF condensing hydro-furnace, all models

Source: Navien NPF installation and operation manual, p. 4, p. 5. Written in our own words; check the manual for your exact model.

Connect the condensate drain and prime the trap

Furnace · NPF

Connect the drain line to an appropriate drain and prime the trap before operation. The manual's warning about horizontal models and the priming step conflict, so follow the instructions for the specific model in the installation section.

  1. Place the free end of the drain line into an appropriate drain.
  2. Prime the condensate trap by pouring water into the exhaust vent until water runs out through the condensate drain (NPT 3/4 in).
  3. Install a Y-fitting in the drain as shown in the diagram for added protection against blockage, and make sure condensate flows freely.
  4. Keep the discharge connection accessible for maintenance and pH testing.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 40-41. Written in our own words; check the manual for your exact model.

Construction heater conditions

Furnace · NDF

The furnace may be used as a construction heater only if the listed conditions are met.

  1. Install the vent system permanently per the manufacturer's instructions.
  2. Supply 100% outdoor air for combustion during construction.
  3. Keep the furnace under thermostatic control; no fixed jumpers for continuous heating.
  4. Install MERV 8 or better filters and change or service them daily during construction.
  5. Seal the return air duct to the furnace.
  6. Keep return air between 55°F (13°C) and 80°F (27°C) with no evening setback or shutdown.
  7. Set input rate and temperature rise per the rating plate.
  8. After construction, clean the furnace and ducts and verify ignition, input, temperature rise and venting.
  9. Keep furnace doors in place whenever the furnace operates.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 9. Written in our own words; check the manual for your exact model.

Conversion to propane and high altitude

Furnace · NPF

The furnace converts to propane with the included LP orifice and a DIP switch setup. High altitude operation up to 10,100 ft uses the factory-supplied high-altitude accessory. Propane conversion kits ship with the unit.

  1. Confirm the gas type and altitude at the installation site.
  2. For propane, use the included LP orifice and set the DIP switches as the conversion section directs.
  3. For high altitude up to 10,100 ft, install the factory-supplied high-altitude accessory.

Applies to: NPF condensing hydro-furnace, propane or high altitude installs

Source: Navien NPF installation and operation manual, p. 8. Written in our own words; check the manual for your exact model.

Do not install the furnace outdoors or in vehicles

Furnace · NPF

Outdoor installation voids the warranty and can cause property damage, serious injury or death. Do not install it in an RV, trailer, boat or other moving vehicle because of the carbon monoxide hazard.

Applies to: NPF700 all models

Source: Navien NPF installation and operation manual, p. 24. Written in our own words; check the manual for your exact model.

Evaporator coil placement

Furnace · NDF

When used with air conditioning, the evaporator coil must be downstream of the heat exchanger. Cold air over the warm heat exchanger can cause condensation, corrosion and early failure.

  1. Place the evaporator coil downstream of the heat exchanger.
  2. Confirm the coil does not sit upstream of the heat exchanger.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 15. Written in our own words; check the manual for your exact model.

Finishing drain and pressure switch tubing

Furnace · NDF

Before the furnace runs, the drain hose must fall toward the trap, the trap must hold water, and the tubing must be cut to length. Do not put the drain hose end underwater.

  1. Slope the drain hose down toward the condensate trap.
  2. Prime the condensate trap with water.
  3. Cut the drain hoses to the proper length.
  4. Cut the pressure switch tubing to the proper length.
  5. Keep the drain hose outlet out of standing water.

Applies to: All NDF vent and drain layouts

Source: Navien NDF Installation and Operation Manual, p. 41. Written in our own words; check the manual for your exact model.

Freeze protection for trap and drain

Furnace · NDF

If the furnace is in a space where freezing can occur, such as a garage, attic, crawl space or other unconditioned space, protect the condensate trap and drain line from freezing.

  1. Identify the trap and drain line location.
  2. Add freeze protection to the trap and drain line.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 14. Written in our own words; check the manual for your exact model.

Front service clearance and garage installation

Furnace · NPF

Keep 24 in of front clearance for service and cleaning. Install at least 18 in above the floor in a residential garage with burners and ignition above that height, and protect the furnace from vehicles. Do not connect the furnace to a chimney flue that serves a solid fuel appliance.

Applies to: NPF700 all models

Source: Navien NPF installation and operation manual, p. 27. Written in our own words; check the manual for your exact model.

Front service clearance precedence

Furnace · NDF

Front service clearance of 24 in (610 mm) takes precedence over the clearance to combustibles.

  1. Keep 24 in (610 mm) of front clearance free for servicing.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 16. Written in our own words; check the manual for your exact model.

Garage installation height

Furnace · NDF

In a residential or storage garage, mount the burners and ignitor at least 18 in (457 mm) above the floor. Protect the furnace from vehicle damage.

  1. Confirm burners and ignitor are at least 18 in (457 mm) above the floor.
  2. Add physical protection if vehicles can reach the furnace.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 9. Written in our own words; check the manual for your exact model.

Gas line purging and pressure test precautions

Furnace · NDF

Never use an open flame to check gas line leaks. Disconnect the manual shut-off valve and the gas valve for any pressure test above 1/2 psig (3.45 kPa). Avoid high pressure at the gas valve and use a backup wrench to prevent twisting it.

  1. Do not use a match, lighter, flame or other ignition source to find leaks.
  2. Disconnect the manual shut-off valve and gas valve before pressure testing above 1/2 psig (3.45 kPa).
  3. Keep the gas valve clear of high pressure.
  4. Hold the gas valve with a backup wrench when tightening fittings.
  5. Install the manual gas shut-off valve and dirt pocket as close to the furnace as possible, readily accessible, and at the height local code requires (4 to 5 ft / 1.2 to 1.5 m above floor level where required).

Applies to: NDF gas piping

Source: Navien NDF Installation and Operation Manual, p. 48. Written in our own words; check the manual for your exact model.

Gas piping rules for Massachusetts

Furnace · NPF

In Massachusetts the product must be installed by a licensed plumber or gas fitter. Flexible connectors may not exceed 36 in (914 mm), lever-type shutoffs must be T-handle type, and copper tubing for gas piping is not allowed.

  1. Confirm a licensed plumber or gas fitter does the installation.
  2. Keep any flexible gas connector at 36 in (914 mm) or less.
  3. Use T-handle lever-type gas shutoffs.
  4. Do not use copper tubing for the gas piping.

Applies to: NPF condensing hydro-furnace in Massachusetts

Source: Navien NPF installation and operation manual, p. 6. Written in our own words; check the manual for your exact model.

Gas shut-off valve placement and pressure test limits

Furnace · NDF

Place the manual shut-off valve and dirt pocket close to the furnace. Some local codes require the valve between 4 and 5 ft above floor level. Disconnect the manual shut-off valve and gas valve before any pressure test above 1/2 psig (3.45 kPa). Use a backup wrench on the gas valve so it does not twist.

  1. Install a manual gas shut-off valve and dirt pocket as close to the furnace as possible.
  2. Check local code for valve height (4 to 5 ft above floor).
  3. Keep the valve readily accessible.
  4. Disconnect the manual shut-off valve and gas valve before any test above 1/2 psig.
  5. Use a backup wrench when tightening so the gas valve is not strained.

Applies to: Gas supply installation and pressure testing

Source: Navien NDF installation and operation manual, p. 48. Written in our own words; check the manual for your exact model.

Gas supply connection and leak test

Furnace · NPF

Only a licensed professional should connect the gas supply. Always leak test the appliance and gas connections before running the furnace.

  1. Connect the gas supply with a licensed professional.
  2. Leak test the appliance and all gas connections before operating.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 23. Written in our own words; check the manual for your exact model.

Gas type and propane conversion

Furnace · NPF

The furnace ships set for natural gas. Propane conversion is only allowed with the Navien Propane Gas & High Altitude Conversion Kit, which is packed with the installation parts. Field conversion without the kit is not allowed and voids the warranty. Only a licensed professional should do the conversion.

  1. Check the rating plate against the gas supply before installing.
  2. If propane is needed, use only the Navien conversion kit.
  3. Follow section 7.1 (Gas & High Altitude Conversion) for the procedure.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 23. Written in our own words; check the manual for your exact model.

Keep the return air opening clear

Furnace · NPF700

Do not install screws or any other structure above the return air opening of the open side plate. Anything placed there can cause air leaks.

Applies to: Return air box kit, open side plate

Source: Navien return air box kit installation manual, p. 1. Written in our own words; check the manual for your exact model.

Leak test the vent system

Furnace · NPF

Test every vent joint for gas leaks with the furnace running, since flue gas leaks can cause CO poisoning.

  1. Turn on the furnace.
  2. Test all exhaust vent joints with a bubble test kit.
  3. Repair any joint that bubbles, then retest.
  4. Seal the vent system gastight.

Applies to: All exhaust vent connections

Source: Navien NPF installation and operation manual, p. 62. Written in our own words; check the manual for your exact model.

Level and pitch for condensate drainage

Furnace · NDF

The furnace must sit on a level surface with the rear 1/4 in (6 mm) higher than the front to drain condensate.

  1. Level the furnace front to back and side to side.
  2. Set the rear of the furnace 1/4 in (6 mm) higher than the front.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 13 and p. 15. Written in our own words; check the manual for your exact model.

LP derate above 2,000 ft

Furnace · NDF

For LP installations above 2,000 ft, reduce the certified input rating by 4% for every 1,000 ft (305 m) above sea level. Pick orifices from the high altitude table for installs above the certified altitude.

  1. Calculate the required input reduction: 4% per 1,000 ft above sea level, starting above 2,000 ft.
  2. Select orifice sizes from Table 6 (Orifice Size for High Altitude Installation).
  3. Confirm the installation altitude before choosing orifices.

Applies to: LP gas at high altitude

Source: Navien NDF installation and operation manual, p. 49. Written in our own words; check the manual for your exact model.

Manual water fill

Furnace · NPF

Fill the water tank by hand when the level is at 1/4 or below. Do this only after the furnace is fully installed and powered on. About 2 gallons (7.5 L) fills it completely.

  1. Check the water level on the front control panel.
  2. Open the water inlet cover on the lower-front cover.
  3. Remove the water inlet plug.
  4. Pour water in through the inlet. Watch the level on the front panel because the pump circulates water and the level drops during fill, so more water may be needed.
  5. Stop when the level is full. Extra water runs out through the drain line.
  6. Install the water inlet plug and close the water inlet cover.
  7. Make sure the inlet cover is closed. An interlock switch stops the unit from running when it is open.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 42. Written in our own words; check the manual for your exact model.

Never operate with water missing or with a flooded control system

Furnace · NPF

The furnace must be filled with water before it is run. Do not run a unit that has been under water. Its controls and gas valve must be checked and replaced by a licensed professional.

  1. Confirm the furnace is full of water before starting.
  2. If the appliance has been under water, do not operate it. Have a licensed professional inspect it and replace the control parts and gas control that were submerged.

Applies to: NPF700 series (all listed models)

Source: Navien NPF installation and operation manual, p. 95. Written in our own words; check the manual for your exact model.

Outdoor temperature sensor installation

Furnace · NPF

Mount the outdoor sensor where it reads true outdoor air and is shielded from sun, heat sources and moisture.

  1. Pull the sensor body out of the cap.
  2. Fasten the body to the wall with the supplied screws and anchors on the North or Northeast side, under eaves.
  3. Run the wires into the body through the grommet.
  4. Connect the wires to the sub controller terminal block.
  5. Make sure connections are tight, then attach the cap.
  6. Use 18 gauge thermostat wire with no splices; keep it away from line voltage and use shielded cable if needed.
  7. Keep the sensor away from fans, exhausts, vents and lights.

Applies to: NPF700 60/80/100 MBH

Source: Navien NPF installation and operation manual, p. 115. Written in our own words; check the manual for your exact model.

Periodic inspection of intake and exhaust terminations

Furnace · NDF

Terminations can be blocked by debris and snow, which affects operation and performance.

  1. Inspect the combustion air intake and exhaust terminations periodically for obstructions such as vegetation, debris and snow.
  2. When locating terminations, plan for snow accumulation around the intake and exhaust.

Applies to: NDF600 series furnaces

Source: Navien NDF installation and operation manual, p. 25. Written in our own words; check the manual for your exact model.

Power connection order

Furnace · NPF

Electrical supply is connected only after plumbing and gas piping are complete and the furnace has been filled with water.

  1. Finish all plumbing and gas piping.
  2. Fill the furnace with water.
  3. Connect a dedicated 110-120 V AC supply with its own circuit breaker.
  4. Never connect the furnace to a 220-240 V AC supply; this damages the furnace and voids the warranty.

Applies to: NPF furnace electrical installation

Source: Navien NPF installation and operation manual, p. 77. Written in our own words; check the manual for your exact model.

Prime the condensate drain before first start-up

Furnace · NPF

Fill the condensate drain line with water before the initial start-up so the trap seals and flue gas cannot escape.

  1. Prime the condensate drain line with water.
  2. Confirm the trap has at least 8.5 in (21.6 cm) of water seal.
  3. Start the furnace only after priming.

Applies to: Down venting and condensate drain installations

Source: Navien NPF installation and operation manual, p. 73. Written in our own words; check the manual for your exact model.

Priming the condensate trap

Furnace · NDF

The condensate trap must be full of water before the furnace starts. Priming is done through the vent drain hose at the inducer.

  1. Remove the vent drain hose from the inducer elbow or drain fitting.
  2. Pour about one cup of water down the hose.
  3. Wait for water to run out the condensate trap outlet, which shows the trap is full.
  4. Reconnect the vent drain hose to the inducer elbow or drain fitting.

Applies to: NDF condensate trap

Source: Navien NDF Installation and Operation Manual, p. 45. Written in our own words; check the manual for your exact model.

Receiving and inspecting the unit

Furnace · NPF

Inspect cartons and the unit for transit damage on arrival. Note any damage on the delivery papers and file a claim with the last carrier. Check the rating plate against the job specification before installing.

  1. Inspect all cartons and contents on receipt.
  2. Open damaged cartons right away and note the damage on the delivery papers.
  3. File a damage claim with the last carrier.
  4. Remove the carton without damaging the unit.
  5. Check the rating plate matches the job specifications.
  6. Read the full instructions before starting the installation.

Applies to: NPF condensing hydro-furnace, all models

Source: Navien NPF installation and operation manual, p. 7. Written in our own words; check the manual for your exact model.

Return air and access rules

Furnace · NDF

Rear returns are not permitted. Use only side and bottom returns. In a utility room, leave room to service the furnace and other appliances.

  1. Use only side or bottom return connections.
  2. Leave access for service and removal of other appliances in the room.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 14. Written in our own words; check the manual for your exact model.

Return air temperature range while heating

Furnace · NPF

Return air entering the furnace during heating must stay inside this band.

  1. Keep return air between 55 F (12 C) and 100 F (37 C) while the furnace is heating.

Applies to: NPF700 hydro-furnace

Source: Navien NPF installation and operation manual, p. 53. Written in our own words; check the manual for your exact model.

Run the start-up wizard on first power-up

Furnace · NPF

The wizard must be finished before the furnace will run. Settings can be changed later from the Installer menu.

  1. Power on the furnace; the wizard starts automatically.
  2. Set the time and date, then the display units (°F/feet or °C/meters).
  3. Confirm the gas type (natural or propane).
  4. Set the installation elevation.
  5. Set the water fill type: water line connected (enabled) or manual fill (disabled).
  6. Set heat stage (1STG or 2STG) and cool stage (1STG, 2STG or No Cooling).
  7. Set heat control: supply or return air, supply set temperature, airflow control mode, heat airflow.
  8. Set cool appliance (AC or heat pump), tonnage, cool airflow per stage, and ramping profile.
  9. Set continuous FAN airflow and run the air test to set minimum and maximum airflow.
  10. Review the setup summary and press OK on each screen until the main screen appears.

Applies to: All NPF700 models on first power-up

Source: Navien NPF installation and operation manual, p. 101-102. Written in our own words; check the manual for your exact model.

Servicing controls and wiring

Furnace · NPF

Discharge body static to ground before touching the control or its wires. Label all wires before disconnecting them, and verify proper operation after servicing. Use only approved replacement parts.

  1. Touch a grounded metal surface to discharge static before handling the control or connected wires.
  2. Label every wire before disconnecting it.
  3. Verify correct operation after any control service.
  4. Use only approved replacement or accessory parts.

Applies to: NPF condensing hydro-furnace, all models

Source: Navien NPF installation and operation manual, p. 5. Written in our own words; check the manual for your exact model.

Set the installation altitude on the control panel

Furnace · NPF

The furnace can be installed up to 10,100 ft. Above 2,000 ft it derates 3% per 1,000 ft. The altitude setting must match the real install location or it can cause injury or a malfunction.

  1. Look up the installation elevation using the manufacturer's elevation lookup with the zip or postal code.
  2. Turn the furnace on and set the altitude on the front control panel (see Setting the Model Details in section 5.11.3.8, p. 121).

Applies to: NPF700 series furnaces

Source: Navien NPF Condensing Hydro-furnace installation and operation manual, p. 136. Written in our own words; check the manual for your exact model.

Sidewall grill free area and sizing

Furnace · NDF

Most sidewall grills give only about 50 percent free area, so the grill must be sized larger than the opening.

  1. Assume a sidewall grill has about 50 percent free area.
  2. Double the required opening size when using a 50 percent grill (for example, 10 in x 10 in becomes a larger grill).
  3. For a 100,000 Btu/hr unit using a pair of 8 in round pipes, an equivalent rectangular duct such as 8 in x 7 in may be used.
  4. With 50 percent free inlet grills, the grill size would then be 14 in x 8 in or equivalent.
  5. A transition may be used to reduce duct size if needed.

Applies to: NDF600 series furnaces with outdoor combustion air grills

Source: Navien NDF Forced Air Gas Furnace Installation and Operation Manual, p. 22-24. Written in our own words; check the manual for your exact model.

Start the vent run with straight pipe

Furnace · NPF

Never start the vent run with a street elbow at the collar, because it prevents a tight seal.

  1. Start the vent run with a length of straight pipe at the collar.
  2. Do not use street elbows at the vent collar.
  3. Add 45 or 90 degree elbows or tees only at the termination end if needed to direct exhaust away from buildings, and keep within the total equivalent vent length.

Applies to: Vent run start and termination

Source: Navien NPF installation and operation manual, p. 62. Written in our own words; check the manual for your exact model.

Suspended horizontal installation

Furnace · NDF

A horizontal furnace may be supported from below or suspended. A suspended cradle uses slotted angle iron and threaded rod. The cabinet must not twist or sag.

  1. Use at least 2 in (51 mm) slotted angle or equivalent.
  2. Position supports so they do not block burner or blower access.
  3. Keep the cabinet from twisting or sagging.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 13 and p. 14. Written in our own words; check the manual for your exact model.

Upflow right venting drain side

Furnace · NDF

In the upflow right venting configuration, the furnace must drain on the left side.

  1. Route the condensate drain to the left side for upflow right venting.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 13. Written in our own words; check the manual for your exact model.

Vent installation warnings and failure effects

Furnace · NDF

Improper venting can cause erratic operation, freeze-up of exhaust piping, sooting, and carbon monoxide hazards.

  1. Read and follow all venting instructions; improper venting can cause carbon monoxide poisoning, explosion or fire.
  2. Follow all venting guidelines to avoid erratic operation, exhaust piping freeze-up, or sooting of the furnace.
  3. Use the 8 in intake and exhaust sizing and slope rules in this section to avoid vent failures.

Applies to: NDF600 series furnaces

Source: Navien NDF installation and operation manual, p. 25, 30. Written in our own words; check the manual for your exact model.

Vent pipe connection to exhaust collar

Furnace · NPF

Use the correct lubricant and method when connecting vent pipe to the collar. No primer or cement is used on the appliance connection.

  1. Cut the vent pipe square at 90 degrees and deburr it before fitting.
  2. Lubricate the pipe end with water only, never grease.
  3. Mark the pipe 2-3/4 in (70 mm) from the end.
  4. Push the pipe into the collar with a twisting motion until it bottoms out in the socket.
  5. Tighten the clamp with a 5/16 in (8 mm) socket to seal the joint.
  6. Do not use primer or cement on the appliance connection.

Applies to: Exhaust collar connection, 2 in or 3 in vent

Source: Navien NPF installation and operation manual, p. 61. Written in our own words; check the manual for your exact model.

Vent slope, support and insulation

Furnace · NPF

Horizontal vent runs must drain back to the furnace and be supported and insulated where needed.

  1. Slope horizontal runs down toward the furnace at 1/4 in per foot (2%).
  2. Support exhaust and intake pipes at least every 4 ft (1.2 m) or as local code requires.
  3. Insulate vent pipe that runs through unconditioned space to stop condensate freezing.
  4. Keep the vent run as short and straight as possible and put the furnace close to the termination.

Applies to: Horizontal and vertical vent runs

Source: Navien NPF installation and operation manual, p. 60. Written in our own words; check the manual for your exact model.

Vent termination location and snow protection

Furnace · NPF

Place the vent termination where it does not get blocked by snow and does not affect other openings.

  1. Keep the termination at least 12 in (300 mm) above the highest expected snow line, or higher if local code requires.
  2. Protect the termination from snow blockage in snowy areas.
  3. Do not terminate over public walkways, near soffit or crawl space vents, or where condensate or vapor could damage equipment.
  4. Keep hazardous or flammable materials away from the termination.
  5. Keep the intake and exhaust free of snow, ice and blockages (owner responsibility).

Applies to: Exhaust and intake terminations

Source: Navien NPF installation and operation manual, p. 62. Written in our own words; check the manual for your exact model.

Water and gas supply valves before startup

Furnace · NPF

Do not turn the furnace on until the gas supply and the water supply (when installed) are fully open. Operating without them can damage the furnace.

  1. Fully open the gas supply valve.
  2. Fully open the water supply valve if a water supply is installed.
  3. Then turn the furnace on.

Applies to: NPF condensing hydro-furnace, all models

Source: Navien NPF installation and operation manual, p. 5. Written in our own words; check the manual for your exact model.

Check DIP switch 2 after main solenoid valve replacement

General · WEC Series

After the main solenoid valve is replaced, DIP switch 2 on the main panel must be OFF. If it is ON, change it.

  1. Open the front and top covers to reach the main panel DIP switches.
  2. Check DIP switch 2.
  3. If DIP switch 2 is ON, set it to OFF.

Applies to: WEC600

Source: Navien WEC Series service manual, p. 109. Written in our own words; check the manual for your exact model.

Choose the filter location

General · NaviClean

The filter works anywhere on the main circuit, but it protects the boiler or baseboard best when fitted after the last heating zone and before the boiler. Position A in the open vented and closed loop diagrams is best practice; position B is acceptable.

  1. Install after the last heating zone and before the boiler.
  2. Use position A where possible; position B is suitable.

Applies to: NaviClean in open vented or closed loop hydronic systems

Source: Navien NaviClean installation and servicing manual, p. 3. Written in our own words; check the manual for your exact model.

Dismiss errors during Install Check Mode

General · WEC Series

Errors during install check can be dismissed. Water outage, apparatus and install check errors can also be cleared by manually re-entering Install Check Mode.

  1. Hold Back and OK together for 3 seconds to dismiss the error.
  2. For water outage (E002, E003), apparatus (E020-E027) or install check (E070-E082) errors, hold Back and OK for 3 seconds to re-enter Install Check Mode manually.
  3. Expect Install Check Mode to take at least 15 minutes.

Applies to: WEC600

Source: Navien WEC Series service manual, p. 29. Written in our own words; check the manual for your exact model.

Fill tank and traps before startup

General · Condensate Neutralizer Tank

Fill the neutralizer tank and traps with tap water before the appliance runs. Flue gas can leak through the tank if it is left dry, which is a carbon monoxide hazard.

  1. Fill the empty tank with neutralizing media to the maximum fill line.
  2. Fill the tank and traps with tap water.
  3. Confirm no flue gas is venting through the tank before startup.

Applies to: Navien condensate neutralizer tank

Source: Navien commercial neutralizer installation instructions, p. 1. Written in our own words; check the manual for your exact model.

Fill the neutralizer and traps with water before startup

General · Light Commercial Neutralizer

Flue gas must never vent through the neutralizer.

  1. Fill the neutralizer unit and traps with tap water.
  2. Make sure no flue gas can leak through the neutralizer, since that causes carbon monoxide hazard.

Applies to: Light Commercial Neutralizer GXXX001324

Source: Light Commercial Neutralizer installation instructions, p. 1. Written in our own words; check the manual for your exact model.

Inlet pressure regulator and water hammer arrestor

General · WEC

Set a regulator wherever inlet pressure reaches 74 psi (510 kPa) or more. A water hammer arrestor protects against pressure surges.

  1. Measure the inlet pressure.
  2. If it is 74 psi (510 kPa) or higher, install a regulator set not to exceed 74 psi (510 kPa).
  3. Install a water hammer arrestor where a plumbing professional recommends.

Applies to: WEC600

Source: WEC Series service manual, p. 16. Written in our own words; check the manual for your exact model.

Installation location requirements

General · WEC

Put the WEC indoors on a flat, level floor where a technician can reach the utility connections, piping and filter housings. Garages, basements and storage rooms are good choices. Do not install outdoors. Provide drain access for the drainwater.

  1. Confirm a flat, level floor.
  2. Confirm access to utility connections, piping and filter housings.
  3. Confirm no exposure to freezing, direct sun, water or weather.
  4. Confirm a drain is available for drainwater.

Applies to: WEC600

Source: WEC Series service manual, p. 12. Written in our own words; check the manual for your exact model.

Mounting clearance and leveling

General · WEC

Set up the WEC level and leave room for service.

  1. Place the WEC on a flat, level floor.
  2. Adjust the leveling feet until they all touch the floor.
  3. Leave about 2 ft (635 mm) of space in front to open the cover.
  4. Strap the WEC to the wall if the area has seismic activity.

Applies to: WEC600

Source: Navien WEC service manual, p. 19-20. Written in our own words; check the manual for your exact model.

O-ring and adapter assembly at the connectors

General · WEC

Connectors on the rear of the WEC must be sealed with O-rings and held by L-clips.

  1. Place an O-ring in the inlet and outlet connectors on the rear of the WEC.
  2. Attach the supplied adapters to the inlet and outlet connectors.
  3. Insert the L-clip into each adapter.
  4. Confirm each O-ring is present and seated correctly.

Applies to: WEC600

Source: WEC Series service manual, p. 16. Written in our own words; check the manual for your exact model.

Opposite-side inlet and outlet layout

General · Commercial Condensate Neutralizer

When the inlet is on the opposite side from the outlet, the baffle wall plugs must be removed first.

  1. Set the inlet on the side opposite the outlet, as in Figure 2.
  2. Remove the 3 plugs from the baffle wall before operation.

Applies to: Commercial condensate neutralizer tank, opposite-side inlet/outlet

Source: Commercial condensate neutralizer tank installation instructions, p. 2 and p. 5. Written in our own words; check the manual for your exact model.

Power supply and cord requirements

General · WEC Series

The unit needs a properly grounded 120 V, 60 Hz outlet with GFCI protection. Power strips, extension cords and modified cords are not allowed. A damaged plug or loose outlet must be fixed by a qualified technician. If the plug gets wet, dry it fully before use.

  1. Connect only to a grounded, GFCI-protected 120 V, 60 Hz outlet.
  2. Do not use a power strip or extension cord.
  3. Do not modify the power cord or bend it hard, and do not put heavy objects on the product.
  4. Do not touch the plug with wet hands.
  5. Have a damaged cord or plug replaced by a qualified technician.

Applies to: WEC600

Source: Navien WEC600 service manual, p. 6-7. Written in our own words; check the manual for your exact model.

Pressure regulator requirement

General · WEC

A regulator is required when inlet water pressure is 74 psi (510 kPa) or higher.

  1. Check feedwater pressure.
  2. If it is 74 psi (510 kPa) or higher, install a regulator.
  3. Set the regulator so it does not exceed 74 psi (510 kPa).

Applies to: WEC600

Source: Navien WEC service manual, p. 16. Written in our own words; check the manual for your exact model.

Site and installation requirements

General · WEC Series

Installation and service must be done by a qualified installer. Feedwater must come from a municipal source that meets the manual's specifications. Failing to test water quality before installing may void the warranty.

  1. Confirm the feedwater is from a municipal source within the manual's specifications.
  2. Test the water quality before installation.
  3. Mount the unit on a flat, level floor indoors.
  4. Keep it away from rain and the elements, from freezing locations, electric heaters, and any flammable gas or substances.
  5. Follow the air gap requirement for the drain line (see section 2.7, p. 20).
  6. Keep the inlet and outlet caps on until the unit is connected to the pipe.

Applies to: WEC600

Source: Navien WEC600 service manual, p. 7. Written in our own words; check the manual for your exact model.

Sizing guideline for condensate flow

General · Commercial Condensate Neutralizer

Use the appliance manufacturer's condensate flow rate first. The manual's guideline values are for reference only.

  1. Get the condensate flow rate from the appliance manufacturer, or use the Navien sizing calculator.
  2. Guideline: a 3,000,000 BTU/hr appliance at 96% efficiency produces about 20 gal/hr (75 L/hr) — preferred setup, Figure 1.
  3. Guideline: a 2,250,000 BTU/hr appliance at 96% efficiency produces about 15 gal/hr (56 L/hr) — inlet opposite outlet, Figure 2.

Applies to: Commercial condensate neutralizer tank

Source: Commercial condensate neutralizer tank installation instructions, p. 2. Written in our own words; check the manual for your exact model.

Water hammer and feedwater pre-treatment

General · WEC

Protect the system from water hammer and high turbidity or iron in the feedwater.

  1. Install a water hammer arrestor where a plumber recommends.
  2. If feedwater turbidity is above the EPA standard, install an extra filter upstream of the sediment pre-filter. Get professional advice first.
  3. If feedwater total iron is above 0.3 ppm, install an iron filter before the sediment pre-filter.
  4. Connect the sediment pre-filter to the point-of-entry line before the WEC, never directly to the WEC inlet.

Applies to: WEC600

Source: Navien WEC service manual, p. 16. Written in our own words; check the manual for your exact model.

Connecting the concentric vent pieces

Tankless water heater · CR/CC

Use the O-ring and coupling hole to join the concentric parts. Fixing brackets hold the assembly. The manual shows a correct connection and incorrect connections.

  1. Fit the O-ring on the joint.
  2. Align the coupling hole and secure with the fixing bracket.
  3. Check that the connection matches the correct-connection diagram, not the incorrect ones.

Applies to: Navien concentric vent kit

Source: Navien CR-CC installation manual, p. 31. Written in our own words; check the manual for your exact model.

Set up a cascade (assign main and sub units)

Tankless water heater · Navien NPN

Two heaters are paired from their front panels; the main unit shows MA.00 and the sub unit SL.01.

  1. Main unit: hold Diagnostic + Up (+) for more than 5 s; MA.00 appears.
  2. Sub unit: hold Diagnostic + Down (-) for more than 2 s; SL.01 appears.
  3. Main unit: hold Diagnostic + Up (+) for 5 s again; displays return to temperature.

Applies to: NPN-160U/180U/199U, NPN-120E/160E/180E/199E

Source: Navien NPN-U/NPN-E Installation Manual, 5.2.1 Configuring the Communication Settings, p.58. Written in our own words; check the manual for your exact model.

Set up a cascade (assign sub unit IDs)

Tankless water heater · Navien NPE-2

Cascade units are linked with Ready-Link cables and the main unit hands out the sub unit IDs.

  1. Wire the cascade with Ready-Link cables and switch all units on.
  2. Main unit: hold Menu + Back 3 s, open 2. Cascade Status and Set > 3. Cascade System Setting, press OK at START.
  3. Sub unit: hold OK for 3 seconds; the panel shows 'ID 1. Allocated!' when the ID is received.

Applies to: NPE-A2, NPE-S2

Source: Navien NPE-A2/S2 Installation Manual, 5.2.1 Configuring the Communication Settings, p.73. Written in our own words; check the manual for your exact model.

Check operation after installation

Water heater · H2Air

Installation must be done by trained, licensed technicians following local codes and wiring rules. After installing, check operation using the manual's instructions.

  1. Confirm the installation follows local codes and wiring regulations.
  2. Check the product's operation using the procedures in this manual.

Applies to: H2Air add-on controller

Source: Navien H2Air installation manual, p. 2. Written in our own words; check the manual for your exact model.

Check rating plate and electrical supply before installing

Water heater · NWP500

The unit is factory set for 208/240 V, 60 Hz. Confirm the site supply matches before any work starts.

  1. Check the rating plate on the side of the unit against the site electrical supply and water pressure.
  2. Do not install if the supply does not match the rating plate.
  3. Have a licensed electrician connect the supply and grounding.
  4. Use wire AWG 10 or heavier rated 167°F (75°C).
  5. Install a breaker larger than the rated amp value on the plate.
  6. Use a supply that matches the rating plate; wrong power can cause abnormal operation or failure.

Applies to: NWP500 series

Source: NWP500 installation manual, p. 15. Written in our own words; check the manual for your exact model.

Check valve type for vertical and horizontal runs

Water heater · H2Air

Vertical pipe runs need a spring check valve, because a swing check valve must not be used on vertical piping. Horizontal runs can use either a spring or a swing check valve.

  1. On vertical pipe runs, install a spring check valve.
  2. Do not install a swing check valve on vertical piping.
  3. On horizontal pipe runs, install either a spring or a swing check valve.

Applies to: H2Air piping layout

Source: Navien H2Air installation manual, p. 11. Written in our own words; check the manual for your exact model.

Connecting the extension cable

Water heater · NR-21DU

Run the extension cable from the water heater front panel port to the remote controller cable, through the bracket hole. Up to 2 remote controllers can be connected if needed (optional).

  1. Connect one end of the extension cable to the port on the front panel of the water heater.
  2. Pass the other end of the extension cable through the hole in the bracket.
  3. Connect the end of the extension cable to the cable coming from the remote controller.
  4. If a second remote controller is used, connect it as an optional addition.

Applies to: NR-21DU remote controller

Source: Navien NR-21DU remote controller manual, p. 5. Written in our own words; check the manual for your exact model.

Do not start with supplies closed

Water heater · NPN

Starting the heater with the gas or water shut off can damage it.

  1. Fully open the gas supply before turning the water heater on.
  2. Fully open the water supply before turning the water heater on.
  3. Do not turn the heater on if the cold water shut-off valve is closed.

Applies to: All NPN models

Source: Navien NPN user's information manual, p. 6. Written in our own words; check the manual for your exact model.

Fill and purge before applying power

Water heater · NWP500

The heater has dry-fire protection, but the tank must still be full with all air purged before any electrical connection is made.

  1. Fill the tank completely with water.
  2. Purge all air from the tank.
  3. Make the electrical connections only after this.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 29. Written in our own words; check the manual for your exact model.

Fill and purge before first power-up (dry fire)

Water heater · NWP500

Do not energize the unit until the tank is full and all air is out. The dry fire protection only checks the tank at the first power connection, so an empty tank can overheat the element.

  1. Fill the tank completely with water.
  2. Purge all air from the tank.
  3. Only then turn the water heater on.

Applies to: NWP500 initial power-up

Source: Navien NWP500 installation manual, p. 44. Written in our own words; check the manual for your exact model.

Gas supply isolation and leak testing

Water heater · CR, CC

Protect the unit and check the gas piping before start-up.

  1. Disconnect the gas line to the unit until the main supply pressure test is done.
  2. Close the unit manual shutoff valve during any gas piping pressure test at or below 1/2 psi (3.5 kPa).
  3. Purge debris from the gas line before connecting it to the heater inlet.
  4. Leak test all gas fittings with soapy water or a gas leak detector before operation.
  5. Never use an open flame to check for leaks.

Applies to: CR and CC series water heaters

Source: Navien CR/CC installation manual, p. 21. Written in our own words; check the manual for your exact model.

Heat trap requirement on inlet and outlet

Water heater · NWP500

Top connections have built-in heat traps. Side connections do not. Check local code and add a heat trap nipple, insert or piping if required.

  1. Check local code for a heat trap requirement on side connections.
  2. If required, install a heat trap nipple, insert or piping per code.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 24. Written in our own words; check the manual for your exact model.

Install a mixing valve to prevent scalding

Water heater · H2Air

A mixing valve must be in the system to limit the domestic hot water outlet temperature and prevent scalding. Setting it to 115-120 °F is recommended.

  1. Install a mixing valve in the domestic hot water line.
  2. Set the mixing valve to 115-120 °F.

Applies to: H2Air domestic hot water piping

Source: Navien H2Air installation manual, p. 11. Written in our own words; check the manual for your exact model.

Installation check: condensate, ducting, leak sensor, battery

Water heater · NWP500

Final checks on condensate lines, ducting, optional accessories and the front panel battery.

  1. Confirm condensate lines are installed correctly and run to a suitable drain.
  2. Confirm the ducting is HVAC approved, no longer than the maximum allowed, and insulated.
  3. For outside ducting, confirm UL certified terminations are used.
  4. Confirm ducting is supported and isolated from the structure.
  5. If a shut-off valve is installed, confirm it is open.
  6. If the leak detection system is installed, confirm the sensor is dry and not touching water.
  7. Confirm the battery protection film has been removed.

Applies to: NWP500 installations

Source: Navien NWP500 installation manual, p. 43. Written in our own words; check the manual for your exact model.

Installation check: water heater location

Water heater · NWP500

Confirm the location before starting up. The unit must be indoors and protected from moisture, freezing and high temperatures, with no flammable vapors nearby.

  1. Confirm the unit is indoors and protected from moisture, wet conditions, freezing and high temperatures.
  2. Confirm there are no flammable vapors nearby.
  3. Confirm air circulation is provided and there is enough space to service the unit, the intake filter and the condensate drain.
  4. Install the vibration isolation kit if the floor is not concrete.
  5. Install the earthquake kit if required.

Applies to: NWP500 installations

Source: Navien NWP500 installation manual, p. 42. Written in our own words; check the manual for your exact model.

Installation check: water supply and T&P relief valve

Water heater · NWP500

Confirm the tank is full, air is purged and there are no leaks. Confirm the T&P relief valve is installed correctly.

  1. Confirm the tank is completely filled with water.
  2. Confirm air has been purged from the tank and piping.
  3. Check water supply lines for tight connections and leaks. Check flexible connections if used.
  4. Confirm the T&P relief valve is installed and its discharge line runs to an open drain.
  5. Protect the T&P discharge line from freezing.

Applies to: NWP500 installations

Source: Navien NWP500 installation manual, p. 42. Written in our own words; check the manual for your exact model.

Installation check: wiring and power

Water heater · NWP500

Check the electrical supply and connections before power-up.

  1. Confirm the supply voltage matches the rating plate on the water heater.
  2. Confirm the branch circuit wire and breaker or fuse are the correct size, 30 A.
  3. Confirm the power connection wire is 10 gauge or thicker.
  4. Confirm electrical connections are tight and the unit is properly grounded.

Applies to: NWP500 installations

Source: Navien NWP500 installation manual, p. 42. Written in our own words; check the manual for your exact model.

Leak sensor placement

Water heater · NWP500

Keep the metal probe of the leak sensor from touching other metal surfaces. Contact can cause a malfunction error. Adhesive details are in the Leak Detection Kit Guide.

  1. Keep the sensor about 0.2 in (5 mm) above the floor or drain pan.
  2. Make sure the metal probe does not touch any other metal surface.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 33. Written in our own words; check the manual for your exact model.

Mounting the wall bracket

Water heater · NR-21DU

Fix the bracket to the wall, then hang the controller on it.

  1. Fasten the bracket securely with 2 screws into the wall, or into the 2 holes in the wall receptacle.
  2. Hang the remote controller on the bracket by lining up the hooks.

Applies to: NR-21DU remote controller

Source: Navien NR-21DU remote controller manual, p. 6. Written in our own words; check the manual for your exact model.

Plumbing and water piping practices

Water heater · CR, CC

Good piping keeps hot water fast and protects the unit.

  1. Use only pipe, fittings, valves and solder approved for potable water.
  2. Install unions and manual shutoff valves on both cold inlet and hot outlet.
  3. Keep hot water piping as short as possible.
  4. Insulate hot and recirculation lines. Do not cover the drain or pressure relief valve.
  5. Clean the cold inlet mesh filter after installation and periodically after that.
  6. Install a mixing valve when space heating needs hotter water, to reduce scald risk.

Applies to: CR and CC series water heaters

Source: Navien CR/CC installation manual, p. 16 and p. 17. Written in our own words; check the manual for your exact model.

Recirculation pump return line connection

Water heater · NWP500

The return pipe must connect to the cold water inlet side. Otherwise you can get poor circulation, hot water backflow, and lower efficiency and safety.

  1. Connect the return line to the cold water inlet side of the system.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 37. Written in our own words; check the manual for your exact model.

Recirculation pump wiring terminals

Water heater · NWP500

Connect the temperature sensor to the SENSOR 1 terminal and the wired push button to the SIGNAL 2 terminal on the pump's terminal block.

  1. Connect the temperature sensor to SENSOR 1 on the pump terminal block.
  2. Connect the wired on-demand push button to SIGNAL 2 on the pump terminal block.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 37. Written in our own words; check the manual for your exact model.

Return line must go to the cold water inlet side

Water heater · ComfortCirc

Poor circulation, hot water backflow and lower system efficiency and safety result if the return pipe is connected anywhere other than the cold water inlet side.

  1. Connect the return water pipe to the cold water inlet side of the system.
  2. Do not connect the return line to the hot water side.

Applies to: ComfortCirc recirculation system with return line

Source: Navien ComfortCirc installation and operation manual, p. 9. Written in our own words; check the manual for your exact model.

Setting the clock

Water heater · NPN

Set the minutes first, then the hour.

  1. Press and hold the Preheat & Timer button for 2 seconds.
  2. Press Up or Down to set the minutes, then press OK.
  3. Press Up or Down to set the hour.

Applies to: NPN outdoor models with remote controller

Source: NPN user's information manual, p. 13. Written in our own words; check the manual for your exact model.

Use only approved recirculation kits

Water heater · NWP500

Only the approved Navien recirculation kit should be used. Other recirculation systems can cause improper operation or damage to the system.

  1. Use only the approved Navien recirculation kit.
  2. Refer to the product installation manual for compatibility.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 34. Written in our own words; check the manual for your exact model.

Wait before power-up after horizontal transport

Water heater · NWP500

If the unit was moved horizontally, it must stand upright before it is powered. Starting too early can damage the compressor and reduce efficiency because the oil has not settled.

  1. Keep the unit upright after horizontal transport.
  2. Wait at least 24 hours before turning it on.

Applies to: NWP500 after horizontal transport

Source: Navien NWP500 installation manual, p. 44. Written in our own words; check the manual for your exact model.

Water line and layout rules from the installation diagram

Water heater · NWP500

Plumbing layout points shown with the installation diagram.

  1. Use dielectric unions at the water connections if copper water lines are used, to prevent galvanic corrosion.
  2. Run cold and hot lines to either the top or the side outlet and inlet, not both.
  3. Cap any unused inlet or outlet to prevent leaks.
  4. Keep the 6 in air gap shown on the diagram.
  5. Install the T&P relief valve and discharge pipe, condensate drain, drain pan and drain valve as shown in the diagram.

Applies to: NWP500 series

Source: NWP500 installation manual, p. 16. Written in our own words; check the manual for your exact model.

Other

Everything else worth knowing at the appliance.

Before any service on the unit

Air conditioner · NAA Series

Isolate power and water before touching anything, let the unit cool, and confirm all error codes are diagnosed first.

  1. Turn off the electric power and the water shut-off valve.
  2. Wait for the unit to cool down before working on it, and watch for sharp edges.
  3. Diagnose all error codes before disassembling anything.
  4. Keep dust and foreign material out of the unit during reassembly.
  5. Check operation and performance after service.

Applies to: NAA17V36-24K/36K, NAA17V60-48K/60K

Source: Navien NAA air conditioner service manual, p. 46. Written in our own words; check the manual for your exact model.

Brazing and ventilation rules

Air conditioner · NAA

Brazing and refrigerant work need open or well-ventilated space, and only brazed joints are acceptable on existing lines.

  1. Make sure the area is open or adequately ventilated before opening the system or brazing.
  2. Do not work in confined spaces.
  3. Only braze lines that are open to the atmosphere or properly exhausted.
  4. On existing refrigerant lines, confirm all joints are brazed, not soldered.
  5. Use a quenching cloth for brazing and keep a dry powder or CO2 extinguisher nearby.

Applies to: NAA17V36-24K/36K, NAA17V60-48K/60K

Source: Navien Air Conditioner NAA Series Service Manual, p. 6. Written in our own words; check the manual for your exact model.

Decommissioning and labeling

Air conditioner · NAA

Before decommissioning, the technician must be familiar with the equipment and power must be available.

  1. Isolate the system electrically.
  2. Pump down the system if possible, or manifold the system to recover from all sections.
  3. Take an oil and refrigerant sample first if the refrigerant will be reused.
  4. Do not reuse recovered refrigerant until it has been cleaned and checked.
  5. Once emptied, label the equipment as dated, signed, and containing flammable refrigerant.

Applies to: NAA17V36-24K/36K and NAA17V60-48K/60K

Source: Navien NAA air conditioner service manual, pp. 9-10. Written in our own words; check the manual for your exact model.

Electrical and high-pressure precautions before service

Air conditioner · NAA

Electrical and refrigerant hazards apply before any work on the unit.

  1. Disconnect power before repairing or changing wiring.
  2. Label all wires before disconnecting them on the unit control.
  3. Disconnect all electric supplies before opening the access panel.
  4. Wait five minutes before servicing so electrical components discharge. Do not discharge capacitors by force.
  5. Recover the refrigerant before opening the system, because it contains high-pressure oil and refrigerant.
  6. Do not clean the unit with chemicals, chemically treated cloth, benzene, paint thinner, polishing powder or other solvents.

Applies to: NAA outdoor unit

Source: Navien NAA air conditioner service manual, p. 19. Written in our own words; check the manual for your exact model.

Fan blade and fan motor replacement

Air conditioner · NAA Series

Remove the fan guard and fan blade first, then the motor. Refer to the wiring diagram for connector locations.

  1. Turn off the respective circuit breaker.
  2. Remove the 8 screws from the fan guard at the top of the unit and take the guard off.
  3. Disconnect the fan connectors from the PCB.
  4. Remove the 2 nuts that secure the fan blade and motor, then remove the fan blade.
  5. Remove the 4 screws and nuts that secure the motor to the fan cover net, then remove the motor.

Applies to: NAA17V36-24K/36K, NAA17V60-48K/60K

Source: Navien NAA air conditioner service manual, p. 46-47. Written in our own words; check the manual for your exact model.

Flammable refrigerant safety and leak detection

Air conditioner · NAA

The system uses R454B, a mildly flammable A2L refrigerant. Never use a flame, halide torch, or any naked-flame detector to look for leaks. Use only electronic leak detectors made for A2L refrigerants, calibrated in clean air and set to the refrigerant's LFL. Leak detection fluids can be used, but avoid chlorine-based detergents, which can corrode copper.

  1. Remove all ignition sources before checking for a leak.
  2. Check for leaks with an A2L-rated electronic detector or a bubble or fluorescent leak fluid.
  3. If a leak needs brazing, recover all refrigerant, or isolate the leaking section with shut-off valves and recover from there, before any flame work.
  4. Use only components specified by Navien. Unapproved parts can ignite refrigerant from a leak.

Applies to: NAA17V36-24K/36K and NAA17V60-48K/60K

Source: Navien NAA air conditioner service manual, p. 8. Written in our own words; check the manual for your exact model.

Leak detection for A2L refrigerant

Air conditioner · NAA

Open flames and halide torches must never be used to find leaks. Use only detectors rated for A2L refrigerant.

  1. Use an electronic leak detector designed for A2L refrigerants and confirm it is non-sparking and calibrated in a refrigerant-free area.
  2. Remove or extinguish all flames if a leak is suspected.
  3. If brazing is needed at a leak, recover the refrigerant or isolate that section with shut-off valves first.
  4. Use leak detection fluid only if it does not contain chlorine; use the bubble or fluorescent method.

Applies to: NAA17V36-24K/36K, NAA17V60-48K/60K

Source: Navien Air Conditioner NAA Series Service Manual, p. 8. Written in our own words; check the manual for your exact model.

Main control board connection points (NAA17V36)

Air conditioner · NAA

Overview of the main board connections shown in the appendix.

  1. Compressor connects at U, V and W.
  2. T3, T4 and TP sensors connect to the board.
  3. High pressure protection switch connects to the board.
  4. Pressure sensor connects to the board.
  5. Solenoid valve connects to the board.
  6. Crankcase heater connects to the board.
  7. DC fan motor connects to the board.
  8. Ground wire connects to the board.
  9. Power supply input L (L1) and N (L2) connect to the board.
  10. Display board connects to the main board.

Applies to: NAA17V36

Source: Navien NAA air conditioner service manual, p. 56. Written in our own words; check the manual for your exact model.

PCB replacement

Air conditioner · NAA Series

Record all parameter settings before swapping the board, because they must be re-entered afterwards.

  1. Turn off the respective circuit breaker.
  2. Remove the 7 screws from the PCB cover and take the cover off.
  3. Disconnect all connections from the PCB and remove it.
  4. Record all existing parameter settings before removal.
  5. Reconnect all wiring connectors to the new PCB.
  6. Fasten the 7 screws to reinstall the PCB cover.
  7. Restore power and set the previous parameters.

Applies to: NAA17V36-24K/36K, NAA17V60-48K/60K

Source: Navien NAA air conditioner service manual, p. 46. Written in our own words; check the manual for your exact model.

POE oil and filter drier when the system is opened

Air conditioner · NAA

This R-454B system uses POE oil (VG74, VG75 or equivalent), which absorbs moisture quickly. Oil and filter drier handling is required whenever the sealed circuit is opened.

  1. Use only R-454B refrigerant and approved compressor oil.
  2. If the system has been exposed to air for more than 4 hours, change the compressor oil.
  3. Replace the filter drier every time the refrigerant system is opened.

Applies to: NAA17V36-24K/36K, NAA17V60-48K/60K

Source: Navien Air Conditioner NAA Series Service Manual, p. 6. Written in our own words; check the manual for your exact model.

Pre-season inspection and maintenance

Air conditioner · NAA

Do this at the start of each heating or cooling season.

  1. Turn off the unit and disconnect power.
  2. Check wires for damage and check for leaks.
  3. Replace indoor filters and outdoor coils as needed.
  4. Clean the indoor unit drain pans.
  5. Check airflow and confirm condensate drains are clear.
  6. Check the air filters.
  7. Check blower wheel alignment and balance, and clean it as needed.

Applies to: NAA system

Source: Navien NAA air conditioner service manual, p. 19. Written in our own words; check the manual for your exact model.

Refrigerant recovery, evacuation and purging

Air conditioner · NAA

Follow this order when opening the refrigerant circuit. Recovered refrigerant goes into labeled recovery cylinders and is never mixed.

  1. Recover the refrigerant following local and national rules.
  2. Evacuate the system.
  3. Purge tubing and braze joints with inert gas while brazing.
  4. Keep purging with inert gas when a flame is used to open the system.
  5. Purge with oxygen-free nitrogen, never compressed air or oxygen, and repeat until no refrigerant remains.
  6. Vent to atmospheric pressure before working on the system.
  7. Keep the vacuum pump outlet away from ignition sources and in a well-ventilated area.
  8. Do not overfill recovery cylinders above 80% of their capacity, and do not exceed cylinder pressure rating.
  9. Weigh recovered refrigerant on calibrated scales.

Applies to: NAA17V36-24K/36K and NAA17V60-48K/60K

Source: Navien NAA air conditioner service manual, p. 9. Written in our own words; check the manual for your exact model.

Repairing the refrigerant circuit (R-454B flammable refrigerant)

Air conditioner · NAA

Follow this sequence before opening the refrigerant circuit for any repair. Use the required recovery equipment and handle the flammable refrigerant safely.

  1. Recover the refrigerant with a recovery pump certified for flammable refrigerants.
  2. Purge the circuit with nitrogen.
  3. Evacuate the circuit to 1,500 microns.
  4. Open the circuit only by cutting or brazing.
  5. Break the vacuum with a nitrogen purge, keeping the vacuum pump outlet away from any ignition source.
  6. Replace the filter drier every time the refrigerant circuit is opened.

Applies to: NAA outdoor unit

Source: Navien NAA air conditioner service manual, p. 19. Written in our own words; check the manual for your exact model.

Sensor and valve reference (T3, T4, T5, T7, Tfin, PT, PEV)

Air conditioner · NAA

Reference list of what each sensor or valve controls. Use it to understand protection and control behavior.

  1. T3 (outdoor coil temperature): high temperature protection and outdoor fan control.
  2. T4 (ODU ambient temperature): limits maximum compressor frequency.
  3. T5 (compressor discharge temperature): high discharge temperature and low superheat protection.
  4. T7 (control board pipe temperature): control board condensation prevention.
  5. Tfin (IPM condenser temperature): high IPM temperature protection.
  6. PT (pressure transducer): senses evaporating pressure, controls compressor frequency, and provides low pressure protection.
  7. PEV (pressure equalizer valve): balances system pressure before compressor start-up.

Applies to: NAA17V36-24K/36K and NAA17V60-48K/60K

Source: Navien NAA air conditioner service manual, pp. 16. Written in our own words; check the manual for your exact model.

Temperature sensor replacement (T3, T4, T5/TP, T7)

Air conditioner · NAA Series

The sensors are removed from the thermistor holder after the covers come off. If the display reading is wrong but the resistance matches the temperature, the PCB is the likely fault.

  1. Turn off the respective circuit breaker.
  2. Remove the 10 screws from the top cover and the 18 screws from the bottom cover, then remove the upper covers and side panels.
  3. Pull the clip that holds the thermistor.
  4. Remove the thermistor from the thermistor holder.
  5. Disconnect the thermistor connector from the PCB and remove the thermistor.
  6. If resistance matches temperature but the display is wrong, replace the PCB.

Applies to: NAA17V36-24K/36K, NAA17V60-48K/60K

Source: Navien NAA air conditioner service manual, p. 48. Written in our own words; check the manual for your exact model.

Wait before working on electrical parts

Air conditioner · NAA

Inverter capacitors hold charge after power is removed. Disconnect every remote power supply and lock it out before service.

  1. Disconnect all remote electrical power and lock or tag the supply so it cannot be energized by accident.
  2. Wait at least 5 minutes after power is off before touching anything electrical.
  3. Confirm the system has been isolated before opening any electrical cover or terminal.

Applies to: NAA17V36-24K/36K, NAA17V60-48K/60K

Source: Navien Air Conditioner NAA Series Service Manual, p. 5. Written in our own words; check the manual for your exact model.

Thermostat and flow switch cable connections

Air handler · H2Air

Thermostat wiring or connectors go into the H2Air contacts. Flow switch fork connectors go into their contacts.

  1. Insert the thermostat wiring or connector into its contact.
  2. Tighten the terminal screw with a screwdriver.
  3. Insert the flow switch fork connectors into the flow switch contact.
  4. Tighten the terminal screw with a screwdriver.

Applies to: H2Air thermostat and flow switch inputs

Source: Navien H2Air installation manual, p. 19. Written in our own words; check the manual for your exact model.

Wiring a heating/cooling combo system

Air handler · H2Air

For cooling, the thermostat cooling call goes to the AHU cooling input and the thermostat R goes to the AHU R output.

  1. Connect the thermostat Y terminal to the AHU cooling input Y.
  2. Connect the thermostat R terminal to the AHU R output.

Applies to: Heating/cooling combo systems using an AHU

Source: Navien H2Air installation manual, p. 17. Written in our own words; check the manual for your exact model.

Access the boiler PCB

Boiler · NCB700

Steps to open the front cover and reach the PCB and terminal strips.

  1. Turn off the power supply to the boiler.
  2. Using a Phillips screwdriver, remove 4 screws (2 top, 2 bottom) from the front cover assembly.
  3. Access the internal components and terminal strips only after power is off.

Applies to: NCB700

Source: Navien NCB700 installation and operation manual, p. 39. Written in our own words; check the manual for your exact model.

Air intake in contaminated areas

Boiler · NCB700

Do not install the boiler where the air is contaminated with dust, sawdust, sand, flour, aerosols or similar. Contaminants can impair operation. If the boiler must go in such an area, use direct venting with outside air intake and clean and service the filter regularly. Damage from contaminants is not covered by the warranty.

  1. Avoid installing in dusty, sandy, floury or aerosol-laden air.
  2. If unavoidable, use direct venting with outside air.
  3. Clean and service the air filter on a regular schedule.

Applies to: NCB700 combustion air supply

Source: Navien NCB700 installation and operation manual, p. 232. Written in our own words; check the manual for your exact model.

Approved PVC vent terminations

Boiler · NCB700

These PVC terminations are listed for use with the NCB700.

  1. Use a PVC concentric vent kit (Sch 40, UL1738/ULCS636) in 2 in or 3 in.
  2. Use an IPEX low profile termination kit: 2 in #196984 or 3 in #193985.
  3. Use only terminations from the same manufacturer as the vent system.
  4. Polypropylene and stainless steel terminations are listed separately on page 72.

Applies to: Vent terminations

Source: Navien NCB700 installation manual, p. 72. Written in our own words; check the manual for your exact model.

Aquastat setpoint for external recirculation

Boiler · NCB700

When an aquastat controls external DHW recirculation, its setpoint must be below 60 °C (140 °F). That is the maximum DHW setpoint for the NCB700.

  1. Set the aquastat below 60 °C (140 °F).
  2. Mount the aquastat on the DHW supply pipe.

Applies to: NCB700 external DHW recirculation with aquastat

Source: Navien NCB700 installation and operation manual, p. 206. Written in our own words; check the manual for your exact model.

Bias resistor DIP switches on R1 and R2

Boiler · Modbus/BACnet Gateway

Bias resistors hold an idle RS-485 bus in a known state. They are 510 ohm and should be enabled at only one point on the bus. Power cycle the gateway after changing them.

  1. Move both the BIAS- and BIAS+ DIP switches to the right on the port being set (R1 or R2) to enable bias resistors.
  2. Enable bias on only one device on the bus, typically the field port end.
  3. Power cycle the gateway if it is already powered, because DIP changes do not take effect until then.

Applies to: R1 and R2 ports

Source: Navien Modbus/BACnet gateway installation and operation manual, p. 8. Written in our own words; check the manual for your exact model.

Boiler that has been under water

Boiler · Combination boiler

A boiler that has been under water must not be used. A qualified service technician must inspect it and replace the control system and any gas control that was under water.

  1. Do not use the boiler if any part has been under water.
  2. Call a qualified service technician to inspect the boiler.
  3. Have the control system and any gas control that was under water replaced.

Applies to: Navien combination boiler after flood exposure

Source: Navien combination boiler user's operation manual, p. 3. Written in our own words; check the manual for your exact model.

Built-in protection functions

Boiler · Combination boiler

The boiler has automatic protections: ignition failure, flame detection, power interruption, excessive air pressure from back-drafts, explosive re-ignition protection, overheat protection, low water-level safety and automatic water fill. Most faults show an error code on the room thermostat, flashing for ignition failure. Refer to the troubleshooting guide for each code.

  1. If the ignition fails, check the flashing 2-digit code on the room thermostat.
  2. If the flame fails or re-ignition fails, check the error code on the room thermostat.
  3. After a strong back-draft, the gas is cut off and an error code appears; check the troubleshooting guide.
  4. After overheating, the gas to the burners is shut off and an error code appears; check the troubleshooting guide.
  5. If there is no water or restricted flow, the boiler shuts down and an error code appears; check the troubleshooting guide.

Applies to: Navien combination boiler safety functions

Source: Navien combination boiler user's operation manual, p. 8. Written in our own words; check the manual for your exact model.

Check input and output states (Input/Output Status)

Boiler · Navien NHB-H

Shows whether the control sees or sends a signal: thermostat inputs, pumps, zone valves, HTL, dual venturi, LWCO, air handler and DHW priority.

  1. Hold Back and Menu together for 3 seconds.
  2. Choose 2. Input/Output Status.
  3. Scroll to the item you want to check.

Applies to: Navien NHB-H condensing boilers: NHB-150H, NHB-110H, NHB-080H, NHB-055H

Source: Navien NHB-H Installation and Operation Manual, 11.7 Viewing Basic Information p.103-104; 11.13 Advanced Menu p.109-118; 11.10 p.108. Written in our own words; check the manual for your exact model.

Check the parts before assembly

Boiler · Ready-Link Commercial

Confirm all parts are present and undamaged before you start. Quantities depend on single or extension kit and the number of boilers.

  1. Check each part against the included items list.
  2. Have a 5/32 in or 4 mm Allen wrench, an adjustable wrench and a level ready.

Applies to: Ready-Link Commercial rack, all installs

Source: Ready-Link Commercial Rack System installation guide, p. 1. Written in our own words; check the manual for your exact model.

Derating at high altitude

Boiler · NCB700

Above 2,000 ft the boiler derates about 3% per 1,000 ft on natural gas and 4% or more per 1,000 ft on propane. Above 5,400 ft on NG, change to the high altitude orifice.

Applies to: NCB700 high altitude installs up to 10,100 ft

Source: Navien NCB700 installation and operation manual, p. 142. Written in our own words; check the manual for your exact model.

DHW temperature control: valves and mixing

Boiler · NCB700

NCB700 boilers include a water flow adjustment valve and a mixing valve, so separate pressure control valves, flow restrictors or mixing valves are not needed. The adjustment valve works with the flow sensor on the water piping module. The mixing valve blends cold water into the hot to keep DHW stable.

  1. Do not add pressure control valves or flow restrictors on the direct DHW line unless local code requires them.
  2. Do not add extra mechanical mixing valves on the DHW line unless local code requires them.
  3. Tuning of the flow adjustment and mixing valves is covered in section 1.4 (p. 10).

Applies to: NCB700 DHW supply

Source: Navien NCB700 installation and operation manual, p. 30. Written in our own words; check the manual for your exact model.

Do not adjust gas valve outlet pressure

Boiler · NCB700

The gas valve outlet pressure is factory set for both natural gas and propane and must not be measured or adjusted in the field.

Applies to: NCB700 gas valve

Source: Navien NCB700 installation and operation manual, p. 141. Written in our own words; check the manual for your exact model.

Do not cut pump power during overheating or gas leak

Boiler · NCB700

If overheating happens or the gas supply does not shut off, keep the circulating pump powered. Cutting pump power can make overheating worse and damage the boiler.

  1. Do not turn off electrical power to the circulating pump during overheating.
  2. Shut off gas at the manual gas valve instead.
  3. Do not start up if there is any sign of a gas leak. Smell near the floor and inside the enclosure after removing the front door.

Applies to: NCB700 all models

Source: Navien NCB700 installation & operation manual, p. 113. Written in our own words; check the manual for your exact model.

Do not operate with front cover open

Boiler · Combination boiler

Running the boiler with the front cover off can cause fire or carbon monoxide poisoning.

  1. Keep the front cover closed whenever the boiler is running.
  2. Do not operate the boiler with the cover opened.

Applies to: All Navien combination boilers

Source: Navien combination boiler user's operation manual, p. 5. Written in our own words; check the manual for your exact model.

Electrical work safety

Boiler · NCB700

Electrical shock hazard. Turn off power before making any electrical connections. Pumps must be electrically grounded per the National Electrical Code.

  1. Turn off electrical power supply before making any connections.
  2. Ground all pumps as required by the National Electrical Code.

Applies to: NCB700 boiler electrical connections

Source: Navien NCB700 installation and operation manual, p. 146. Written in our own words; check the manual for your exact model.

External LWCO installation

Boiler · RAL

Install a separate low water cutoff (LWCO) device when local codes require one. The adapter can carry the external LWCO alongside the pressure relief valve and air vent.

  1. Check local codes to see whether a separate external LWCO is required.
  2. Mount the external LWCO using the adapter arrangement shown in Figure 2.

Applies to: RAL PRV-air vent adapter with external LWCO

Source: Navien RAL Adapter installation guide, p. 1. Written in our own words; check the manual for your exact model.

External LWCO must be a separate device when local code requires it

Boiler

If local codes require a low water cutoff, install a separate external LWCO device. The guide shows a typical layout with the pressure relief valve, air vent and external LWCO all mounted on the PRV-Air vent adapter.

  1. Check local codes for a required low water cutoff.
  2. If one is required, mount the external LWCO on the adapter with the pressure relief valve and air vent as shown in the guide's figure.

Applies to: PRV-Air vent adapter with external LWCO

Source: Navien PRV-Air Vent Adapter installation guide, p. 1. Written in our own words; check the manual for your exact model.

Factory DHW temperature setting

Boiler · NCB700

The DHW temperature leaves the factory at 120°F (49°C). Water at or above 125°F (52°C) can scald instantly, so change it only after reviewing the scald-time table in the manual.

  1. Keep the DHW setting at the lowest comfortable temperature.
  2. Use a thermostatic mixing or temperature-limiting valve if the setting must go above 125°F (52°C).

Applies to: Domestic hot water setting

Source: Navien NCB700 installation and operation manual, p. 5. Written in our own words; check the manual for your exact model.

Factory gas type

Boiler · NCB700

The boiler ships set for natural gas only. Gas conversion kits are attached inside the case.

Applies to: NCB700 gas conversion

Source: Navien NCB700 installation and operation manual, p. 138. Written in our own words; check the manual for your exact model.

Freeze protection during power loss

Boiler · NCB700

The freeze protection system does not run when power is off. In cold areas with frequent outages the heat exchanger can freeze, and damage from freezing is not covered under warranty.

  1. In cold areas with frequent outages, drain the boiler completely if outages may last a long time.
  2. A battery back-up may be used to keep hot water during an outage.

Applies to: NCB700 power supply in cold climates

Source: Navien NCB700 installation and operation manual, p. 80. Written in our own words; check the manual for your exact model.

Freeze risk during power failure in cold areas

Boiler · NCB700

The boiler freeze protection does not run without power, so the heat exchanger can freeze. In cold areas with frequent outages, drain the boiler for long outages. A battery backup can keep hot water available during short outages. Freeze damage is not covered under warranty.

  1. In cold areas with frequent power failures, drain the boiler completely if outages may last a long time.
  2. Optionally fit a battery backup for hot water during short outages.

Applies to: NCB700 boilers in cold climates

Source: Navien NCB700 installation and operation manual, p. 80. Written in our own words; check the manual for your exact model.

Gas conversion kit location and gas pipe sizing notes

Boiler · NCB700

The Propane Gas & High Altitude Conversion Kit is inside the cabinet. Gas connection fitting on all boilers is 3/4 in. Boiler should be the first appliance downstream of the gas meter.

  1. Remove the front cover to access the conversion kit.
  2. Confirm the gas meter capacity is at least the total capacity of connected appliances.
  3. Use 1/2 in rigid pipe only within the sizing table limits; do not use 1/2 in corrugated connectors or tubing.
  4. Keep flexible lines free of crimps and tight bends.
  5. Install a union on the gas line close to the boiler for service.
  6. Check the EFV minimum and maximum flow rating before installing an excess flow valve.

Applies to: NCB700 all models

Source: NCB700 Installation & Operation Manual, p. 54-55. Written in our own words; check the manual for your exact model.

Gas leak response

Boiler · NCB700

If gas is smelled, do not light appliances or touch electrical switches.

  1. Leave the area and call the gas supplier from outside the building.
  2. If the supplier cannot be reached, call the fire department.
  3. Do not return until the gas supplier or fire department says it is safe.

Applies to: All NCB700 models

Source: Navien NCB700 installation and operation manual, p. 3. Written in our own words; check the manual for your exact model.

Gas piping layouts and check valves

Boiler · NCB700

Typical propane piping layouts show a two-stage system with multiple regulators as the recommended option. Any check valve in the gas line must be sized for the boiler's rated minimum and maximum flow. An undersized check valve will not pass full gas flow and can cause the boiler to run improperly. Flow-limiting valves are also shown in the layouts.

  1. Check the check valve rating against the manufacturer's minimum and maximum flow before installing it in the gas line.
  2. Use the recommended two-stage layout with multiple regulators where possible.

Applies to: NCB700 gas piping

Source: Navien NCB700 installation & operation manual, p. 225. Written in our own words; check the manual for your exact model.

Gas valve outlet pressure is factory set

Boiler · NFC-H

Do not adjust or measure gas valve outlet pressure as a field step. The valve is factory set for correct outlet pressure. Only the CO2 and manometer checks above are approved for adjustment.

Applies to: NFC-H gas valve

Source: Navien NFC-H propane and high altitude conversion guide, p. 1. Written in our own words; check the manual for your exact model.

Gas valve outlet pressure must not be adjusted

Boiler · NCB-H

The gas valve is factory set for both natural gas and propane and does not need field adjustment.

  1. Do not adjust or try to measure gas valve outlet pressure.

Applies to: NCB-H gas valve

Source: Navien NCB-H LP gas and high altitude conversion guide, p. 1. Written in our own words; check the manual for your exact model.

Gas valve set screw adjustment limit

Boiler · NCB-H

Use a 5/32 in or 4 mm Allen wrench on the set screw. The set screw is behind a screw-on cover, which must be removed first.

  1. Turn the set screw no more than 1/4 turn.
  2. Turn clockwise to raise the CO2 or offset value, counterclockwise to lower it.

Applies to: Gas valve set screw during CO2 or offset adjustment

Source: Navien NCB-H LP gas and high altitude conversion guide, p. 2. Written in our own words; check the manual for your exact model.

Glycol freeze protection rules

Boiler · NCB700

Glycol is allowed for freeze protection only under strict limits.

  1. Use only inhibited propylene glycol made for hydronic heating systems. Any other antifreeze can damage the system and void the warranty.
  2. Do not exceed 35 % glycol concentration.
  3. Check the glycol concentration and inhibitor level before use, on both new and existing systems.
  4. Test the glycol system at least once a year as the glycol maker recommends.
  5. Leave room in the system for glycol expansion.
  6. Glycol raises pressure drop because it is more viscous than water.
  7. Freeze damage is not covered by the warranty.

Applies to: NCB700 hydronic systems using glycol

Source: Navien NCB700 installation manual, p. 183. Written in our own words; check the manual for your exact model.

High altitude de-rate

Boiler · NFC-H

Above 2,000 ft (610 m) the unit de-rates by 3% for each 1,000 ft (305 m) of altitude gain. The unit may be installed up to 10,100 ft (3,078 m) on natural gas or propane, with switches set as in the DIP switch table.

Applies to: Installations above 2,000 ft

Source: Navien NFC-H propane and high altitude conversion guide, p. 2. Written in our own words; check the manual for your exact model.

Hot water temperature setting and scald risk

Boiler · Combination boiler

The boiler is factory set to 120°F (49°C). Water above 125°F can cause severe burns or death from scalds. Households with small children, or disabled or elderly people, may need 120°F or lower. If the outlet temperature can go above 125°F, consider a thermostatic mixing valve or temperature limiting valve.

  1. Keep the DHW setting at 120°F (49°C) unless the household needs otherwise.
  2. Use 120°F or lower where small children, disabled or elderly people are present.
  3. Consider a thermostatic mixing valve or temperature limiting valve if outlet temperature can exceed 125°F.
  4. Do not change the temperature setting while someone is using the boiler.
  5. Check the water temperature before showering or bathing.

Applies to: Domestic hot water temperature setting

Source: Navien combination boiler user's operation manual, p. 7. Written in our own words; check the manual for your exact model.

Indirect venting and negative pressure

Boiler · NCB700

With indirect (single-pipe) venting, the room can go under negative pressure, which can push cold air back through the heat exchanger and cause freezing and malfunction. Building codes generally forbid negative pressure in homes. If there is any doubt, use direct venting instead. The page 240 text warns that freeze damage caused by backdraft is not covered by the manufacturer warranty.

  1. Insert the vent outlet plug into the air intake pipe for indirect venting. Do not glue it so it can be removed and cleaned.
  2. Check the room air supply is balanced and the space cannot go under negative pressure.
  3. If negative pressure is possible or in doubt, switch to direct venting.

Applies to: NCB700 indirect (single-pipe) venting

Source: Navien NCB700 installation and operation manual, p. 240. Written in our own words; check the manual for your exact model.

Keep combustion air free of corrosive vapors

Boiler · NCB700

Halogenated compounds in the combustion air form acids when burned and attack the stainless heat exchanger, seals and vent system.

  1. Check that combustion air is free of flammable vapors and corrosive gases.
  2. Avoid refrigerants and solvents containing Freon, trichloroethylene, perchloroethylene or chlorine gas.
  3. Keep dust and debris away from the air intake.

Applies to: NCB700 combustion air supply

Source: Navien NCB700 installation manual, p. 179. Written in our own words; check the manual for your exact model.

LED readout and error display

Boiler · CH

The LED readout shows supply water temperature and pressure for space heating in 5-second intervals unless an error code is showing. If an error code shows on the remote controller, follow the troubleshooting chart before contacting your installer or Navien. Step 1 is to turn the unit OFF and back ON to reset it.

  1. Turn the unit OFF, then ON to reset.
  2. If the unit does not return to consistent operation, contact your installer, service contractor, or Navien.

Applies to: CH combination boiler

Source: Navien CH User's Operation Manual, p. 40. Written in our own words; check the manual for your exact model.

LED/FND display readout

Boiler · CH-ASME

The LED shows supply water temperature and pressure for space heating in 5 second intervals, unless it is showing an error code.

Applies to: Navien combination boiler

Source: Navien User's Operation Manual, p. 40. Written in our own words; check the manual for your exact model.

Lowering pump speed reduces performance

Boiler · NCB700

The factory pump speed is Sp3 (default). Dropping to Sp2 or Sp1 can reduce both space heating and DHW output.

  1. Leave the pump on the factory default speed unless the design needs a change.
  2. Recheck heating and DHW performance after any speed change.

Applies to: Internal circulation pump

Source: Navien NCB700 installation and operation manual, p. 8. Written in our own words; check the manual for your exact model.

Massachusetts side-wall horizontal vent requirements

Boiler · NCB700

Extra rules apply when a side-wall vent terminates less than seven feet above finished grade (including over decks or porches) in Massachusetts.

  1. Confirm a battery or hard-wired CO detector is on the same floor as the appliance, or the next floor up if it is in a crawl space.
  2. Confirm a CO detector is also present on each habitable level of the dwelling.
  3. Use only CO detectors listed to ANSI/UL 2034 and certified by IAS that comply with NFPA 720.
  4. Permanently mount a metal or plastic sign on the outside wall at least eight feet above grade, in line with the vent terminal, reading GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS, with letters at least 0.5 inch high.
  5. Installation must be done by a licensed plumber or gas fitter per 248 CMR 4.00 and 5.00.

Applies to: Side-wall horizontally vented installations in Massachusetts

Source: Navien NCB700 installation and operation manual, p. 157. Written in our own words; check the manual for your exact model.

Mixed preheat mode is the default for DHW

Boiler · NCB700

The NCB700 preheats domestic hot water in mixed preheat mode, which is on by default. It gives quick hot water when no external recirculation loop is installed. Select the mode from the DHW settings if needed.

  1. Leave mixed preheat enabled when there is no external recirculation loop.
  2. To change it, use the domestic hot water setting in the advanced menu section referenced on the page.

Applies to: NCB700 domestic hot water

Source: Navien NCB700 installation and operation manual, p. 202. Written in our own words; check the manual for your exact model.

Monthly operation and gas logs

Boiler · NCB700

Monthly logs show space heating operating time, DHW operating time and gas consumption. The page does not name the menu item that opens them.

  1. Open the menu where the monthly logs are listed.
  2. Select SH Operation Time to view space heating logs.
  3. Select DHW Operation Time to view DHW logs.
  4. Select Gas Consumption to view monthly gas use.

Applies to: Front panel logs

Source: Navien NCB700 installation & operation manual, p. 124. Written in our own words; check the manual for your exact model.

Never start the vent run with a street elbow

Boiler · NCB700

A street elbow at the collar cannot seal the joint against the vent collar and can leak flue gas.

  1. Always start the vent run with a length of straight pipe at the collar.
  2. Do not place a street elbow directly on the collar.

Applies to: NCB700-190/060, NCB700-190/080, NCB700-240/110, NCB700-240/130, NCB700-250/150

Source: Navien NCB700 installation and operation manual, p. 98. Written in our own words; check the manual for your exact model.

Optional outdoor temperature sensor (K-Factor outdoor reset)

Boiler · CH

With the optional outdoor sensor connected to the Navien CH unit, the boiler adjusts heating water temperature to outdoor conditions. The K-Factor settings control supply and return temperature. Heat is not wasted beyond the current heat loss.

Applies to: CH combination boiler with optional outdoor sensor

Source: Navien CH User's Operation Manual, p. 38. Written in our own words; check the manual for your exact model.

Outdoor reset control operating limits

Boiler · NCB700

Outdoor reset needs an outdoor sensor and only works in normal operation. It is not active in MIN or MAX mode, or while a fault is displayed.

  1. Confirm the outdoor temperature sensor is installed.
  2. Confirm the boiler is in normal operation mode.
  3. Set outdoor reset under 12.5.2 and 12.6.3 in the manual.

Applies to: NCB700 space heating with outdoor reset

Source: Navien NCB700 installation and operation manual, p. 148. Written in our own words; check the manual for your exact model.

Outdoor sensor failure behavior

Boiler · NCB700

If the outdoor reset sensor fails, the boiler runs at the manually set space heating temperature instead of an outdoor-based temperature.

  1. Check the outdoor sensor if the boiler stops following the outdoor reset curve.
  2. Note the manual heating set point. The boiler uses it while the sensor is faulty.

Applies to: NCB700 with Outdoor Reset Control

Source: Navien NCB700 installation & operation manual, p. 115. Written in our own words; check the manual for your exact model.

Outdoor sensor location and wiring guidelines

Boiler · NCB700

Choose a location that gives a true outdoor reading and keep the wiring clear of interference.

  1. Mount on the north or northeast side under eaves, shaded from direct sun.
  2. Keep the sensor away from fans, exhausts, vents, lights and other heat sources.
  3. Keep the sensor away from excessive moisture.
  4. Use 18 gauge thermostat wire with no splices.
  5. Route the wire separately from line voltage. Use shielded cable if needed.

Applies to: Outdoor temperature sensor installation

Source: Navien NCB700 installation and operation manual, p. 148. Written in our own words; check the manual for your exact model.

Overheating or gas shut-off failure

Boiler · Combination boiler

If the boiler overheats or the gas supply does not shut off, do not switch off or disconnect the electrical supply to the pump.

  1. Do not turn off or disconnect the electrical supply to the pump.
  2. Shut off the gas supply at a location outside the appliance.

Applies to: Navien combination boiler pump and gas supply

Source: Navien combination boiler user's operation manual, p. 3. Written in our own words; check the manual for your exact model.

Propane conversion requires the Navien kit

Boiler · NCB700

The boiler ships set for natural gas. Propane operation needs the Navien propane and high altitude conversion kit, which is mounted inside the cabinet behind the front cover. Field conversion without this kit is not permitted and voids the warranty.

  1. Confirm the rating plate gas type, gas pressure, water pressure and power supply match the site before installing.
  2. Remove the front cover to reach the conversion kit.
  3. Use only the Navien propane and high altitude conversion kit.
  4. Test the gas piping and connections for leaks before operating the appliance.

Applies to: NCB700 all models

Source: Navien NCB700 installation and operation manual, p. 168 and 176. Written in our own words; check the manual for your exact model.

Propane odorant check

Boiler · NCB700

Propane suppliers add odorant that can fade. Have the supplier verify odorant level before startup and periodically after.

Applies to: NCB700 propane installs

Source: Navien NCB700 installation and operation manual, p. 138. Written in our own words; check the manual for your exact model.

Protect the rack coating

Boiler · Ready-Link Commercial

Scratches or chipped paint can lead to rust and shorten the rack's life.

  1. Inspect the boiler and rack surfaces for scratches or chipped paint.
  2. Recoat any area where the coating has been removed or scratched.

Applies to: Ready-Link Commercial rack and boiler

Source: Ready-Link Commercial Rack System installation guide, p. 2. Written in our own words; check the manual for your exact model.

Pump speed reduction lowers performance

Boiler · NCB700

The internal Grundfos UPS 15-78 pump is factory set to Sp3. Running it slower than the factory setting can cut domestic hot water and space heating output.

  1. Keep the pump at the factory setting (Sp3) unless the design requires otherwise.
  2. If the pump speed is lowered, check DHW and heating output afterward.

Applies to: NCB700 all models

Source: Navien NCB700 installation and operation manual, p. 170. Written in our own words; check the manual for your exact model.

Read live data (Status Information menu)

Boiler · Navien NHB-H

Read-only list of boiler data items.

  1. Press Menu, choose 1. Status Information.
  2. Turn the Command dial to scroll, press it to see the value.
  3. Press Back to leave.

Applies to: NHB-055H, NHB-080H, NHB-110H, NHB-150H

Source: Navien NHB-H User's Information Manual (V1.0 Apr 2024), 3.3, p.13-14; Navien NHB-H Installation and Operation Manual, 11.7, p.103-104. Written in our own words; check the manual for your exact model.

Read the error history

Boiler · Navien NHB-H

Lists the 10 most recent errors, newest at the top.

  1. Press Menu, choose 4. Error History.
  2. Select an error and press the dial for details.
  3. Press Back to return.

Applies to: NHB-055H, NHB-080H, NHB-110H, NHB-150H

Source: Navien NHB-H Installation and Operation Manual, 11.10, p.108. Written in our own words; check the manual for your exact model.

Remote controller key layout

Boiler · CH ASME

Keys listed on the controller are Power (ON/OFF), Heating mode selection (Supply/Return), Program (24-hour timer and clock), center dial (temperature and timer adjustment), DHW (domestic hot water), Set up, and Stand By (stand-by and lock functions).

Applies to: Remote controller

Source: Navien CH ASME User's Operation Manual, p. 13. Written in our own words; check the manual for your exact model.

Remote controller LED indicator meaning

Boiler · CH ASME

A flashing green LED means the burners are on. A flashing red LED means there is an error.

  1. If the red LED flashes, read the code on the display and check the error code guide.
  2. If the green LED flashes, the burners are firing.

Applies to: Remote controller

Source: Navien CH ASME User's Operation Manual, p. 13. Written in our own words; check the manual for your exact model.

RS-485 cable length and cable type

Boiler · NFB700

Maximum RS-485 distance is about 3,000 ft at 57600 baud. Higher baud rates reduce the usable distance. Use twisted pair cable such as UTP or CAT5 for signal quality.

  1. Keep the run within the distance for the chosen baud rate.
  2. Use twisted pair cable (UTP or CAT5).

Applies to: Modbus RTU RS-485 network

Source: Navien Modbus RTU installation & operation manual, p. 3. Written in our own words; check the manual for your exact model.

Shutting the boiler down for a long period

Boiler · NCB700

Drain the boiler and cut power so it does not freeze or get damaged while unused.

  1. Completely drain the water out of the boiler.
  2. Disconnect the power supply to the boiler.

Applies to: NCB700 boilers not in use for a long time

Source: Navien NCB700 installation and operation manual, p. 81. Written in our own words; check the manual for your exact model.

Termination resistor DIP switch

Boiler · Modbus/BACnet Gateway

Enable termination only if the gateway is the last device on the serial trunk. Termination also overrides bias resistors if both are connected.

  1. If the gateway is the last device on the trunk, move the TERM DIP switch to the right on the port in use.
  2. Leave termination off for gateways in the middle of the trunk.
  3. Power cycle the gateway after changing the switch, since changes do not apply while powered.

Applies to: R1 and R2 ports

Source: Navien Modbus/BACnet gateway installation and operation manual, p. 9. Written in our own words; check the manual for your exact model.

Turn off gas to the boiler for service

Boiler · NCB700

Procedure before performing service on the boiler. The boiler has no pilot and uses an ignition device.

  1. Turn off all electrical power to the boiler if service is to be done.
  2. Set the thermostat or control to the lowest setting.
  3. Close the main manual gas valve (main valve).

Applies to: NCB700

Source: Navien NCB700 installation and operation manual, p. 112. Written in our own words; check the manual for your exact model.

UL compliance conditions for gateway installation

Boiler · Modbus/BACnet Gateway

Conditions the gateway must meet for UL compliance.

  1. Power the gateway from a listed LPS or Class 2 supply rated for the expected temperature range.
  2. Use interconnecting power connectors and cable that meet local electrical code, the expected temperature range, and the gateway current and voltage rating.
  3. Keep the interconnecting power cable 3.05 m (118.3 in) or shorter, made of VW-1, FT-1 or better rated material.
  4. If the ambient is above 65 °C, install in a restricted access area that needs a key or special tool.
  5. Do not connect this device to a LAN segment that has outdoor wiring.

Applies to: Navien Modbus/BACnet gateway

Source: Navien Modbus/BACnet Gateway Start-up Guide, p. 35. Written in our own words; check the manual for your exact model.

Use only inhibited propylene glycol in space heating

Boiler · CH ASME

Only inhibited propylene glycol made for space heating systems may be used as antifreeze. Ethylene glycol is toxic and attacks gaskets and seals.

  1. Confirm the antifreeze is inhibited propylene glycol made for space heating before adding it.
  2. Do not add ethylene glycol.

Applies to: Space heating loop antifreeze

Source: Navien CH ASME User's Operation Manual, p. 9. Written in our own words; check the manual for your exact model.

Use only with Navien combi-boilers

Boiler · NCB-H, NFC Series

The manifold is approved only for Navien NCB-H and NFC Series combi-boilers and must not be used with other manufacturers' products. Installation and service must be done by a qualified installer or service agency.

Applies to: NCB-H and NFC Series primary manifold

Source: Navien NCB-H, NFC Series Primary Manifold installation instructions, p. 1. Written in our own words; check the manual for your exact model.

Vent installation detector limits

Boiler · NCB700

The vent installation detector only checks that the pipe is inserted to 70 mm in the exhaust collar. It does not detect leaks, pipe separation past the collar, blocked vents, vent movement, or a worn or stuck switch. Do not rely on it as a carbon monoxide alarm or safety switch. Inspect all vent joints regularly.

  1. Inspect all vent joints at regular intervals.
  2. Do not rely on the detector to find leaks, separated joints or blockages.
  3. Use a carbon monoxide detector as a separate safeguard.

Applies to: NCB700 vent installation detector

Source: Navien NCB700 installation and operation manual, p. 235-237. Written in our own words; check the manual for your exact model.

View error history

Boiler · NCB700

The display keeps the 10 most recent errors. The newest error is at the top of the list.

  1. Press the Menu button.
  2. Select 4. Error History.
  3. Turn the Command dial to scroll the list.
  4. Press the Back button to return to the previous screen.

Applies to: Front panel display

Source: Navien NCB700 installation & operation manual, p. 123. Written in our own words; check the manual for your exact model.

Wire labelling and verification during control work

Boiler · NCB700

Wiring errors can cause improper and dangerous operation. Label every wire before disconnecting it when working on the controls, and verify proper operation after any service.

  1. Label all wires before disconnecting them.
  2. Verify proper operation after servicing.

Applies to: NCB700 boilers

Source: Navien NCB700 installation and operation manual, p. 81. Written in our own words; check the manual for your exact model.

Wiring a low water cutoff (LWCO) switch

Boiler · NCB700

The boiler supplies 24 VAC to the LWCO power terminals (CNC3). For line-voltage LWCO switches, the manual shows a typical method where the burner and control circuits share the same voltage, using a jumper between the switch terminals.

  1. Connect the LWCO switch power to the 24 VAC terminals (CNC3) on the boiler board.
  2. For a line-voltage switch, use the typical wiring with a jumper as shown in the manual.
  3. Confirm the wiring matches the diagram before power-up.

Applies to: NCB700 low water cutoff wiring

Source: Navien NCB700 installation and operation manual, p. 208. Written in our own words; check the manual for your exact model.

Read live data (Status Information menu)

Combi boiler · Navien NCB-H

Read-only list of boiler operating data.

  1. Press Menu, choose 1. Status Information.
  2. Turn the Command dial to scroll items, press it to see a value.
  3. Press Back to leave.

Applies to: NCB-190/060H to NCB-250/150H

Source: Navien NCB-H User's Information Manual (V1.0 Apr 2024), 3.3 Accessing Basic Menu Items, p.12. Written in our own words; check the manual for your exact model.

Read the error history

Combi boiler · Navien NCB-H

The last 10 errors are listed in the menu.

  1. Press Menu.
  2. Choose 4. Error History to see the last 10 errors.

Applies to: NCB-250/150H, NCB-240/130H, NCB-240/110H, NCB-190/080H, NCB-190/060H

Source: Navien NCB-H Installation & Operation Manual, 11.5.1 Viewing Basic Information, p.113-114. Written in our own words; check the manual for your exact model.

Air filter care

Furnace · NDF

Filter handling precautions for the homeowner.

  1. Disconnect electrical power to the furnace before any maintenance.
  2. Do not operate the furnace or air conditioner for extended periods without an air filter.
  3. Reinstall the filter with airflow in the same direction as before; reversing it releases trapped dust into the ducts.
  4. Ask the installer or service technician if you are unsure how to remove the filter.

Applies to: NDF forced air gas furnace

Source: Navien NDF installation and operation manual, p. 90. Written in our own words; check the manual for your exact model.

Air filter inspection

Furnace · NDF

Inspect the air filter often and clean or replace it when needed. Check monthly at first, then adjust based on experience and conditions. A dirty filter raises operating temperatures and lowers efficiency. Do not run the furnace for long periods without a filter. If there are two return air inlets, both need filters. HEPA-type filters can cause a large pressure drop, so the contractor should confirm the duct system can still deliver enough airflow.

  1. Inspect the filter monthly at first.
  2. Clean or replace the filter when it is dirty.
  3. Do not operate the furnace for long periods without a filter.
  4. Filter both return inlets if there are two.

Applies to: NDF600 models

Source: Navien NDF installation and operation manual, p. 66. Written in our own words; check the manual for your exact model.

Air filter, doors and front cover

Furnace · NPF

The furnace must not run without a filter, and the heating function must not run with the doors removed. The front cover must be fully closed with the quarter-turn fasteners engaged.

  1. Install a filter before operating the furnace.
  2. Install all doors before running the heating function.
  3. Close the front cover and confirm each quarter-turn fastener is fully engaged.

Applies to: NPF condensing hydro-furnace, all models

Source: Navien NPF installation and operation manual, p. 4, p. 7. Written in our own words; check the manual for your exact model.

Ambient temperature at installation location

Furnace · NPF

Ambient temperature at the installation location must stay above 32°F (0°C) and below 125°F (52°C).

Applies to: NPF700 all models

Source: Navien NPF installation and operation manual, p. 24. Written in our own words; check the manual for your exact model.

Annual cleaning by qualified technician

Furnace · NDF

The furnace should be cleaned and inspected once a year by a trained, qualified technician. Cleaning inside the secondary heat exchanger is normally not needed; only clean it if there is evidence of dirt or debris, such as large amounts building up in the condensate drain line.

Applies to: NDF600 models

Source: Navien NDF installation and operation manual, p. 66. Written in our own words; check the manual for your exact model.

Attic exhaust fan options

Furnace · NDF

A powered attic fan can create negative pressure and stop the attic from supplying combustion air, even though it normally runs only in cooling season.

  1. Option A: use the direct vent option.
  2. Option B: get outdoor air from another location.
  3. Option C: interlock the attic exhaust fan with the furnace so both cannot run at the same time.

Applies to: NDF600 series furnaces with attic combustion air

Source: Navien NDF Forced Air Gas Furnace Installation and Operation Manual, p. 22. Written in our own words; check the manual for your exact model.

Auxiliary drain pan

Furnace · NDF

Install an auxiliary drain pan under the evaporator coil where required by approved regulations, such as where the main condensate line can clog and damage the building, or where a condensate treatment system or coil drain pan overflow is used.

  1. Install an auxiliary drain pan under the evaporator coil where required.
  2. Use it where the main condensate line could clog and cause building damage.

Applies to: NDF600 series furnaces with evaporator coil

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 7. Written in our own words; check the manual for your exact model.

Blower door safety switch must stay active

Furnace · NDF

The furnace has a blower door safety switch. Do not disable it. Disabling it can cause electric shock, injury or death.

  1. Do not bypass or disable the blower door safety switch.
  2. Check it works before returning the furnace to service.

Applies to: Blower compartment door

Source: Navien NDF installation and operation manual, p. 54. Written in our own words; check the manual for your exact model.

Category IV venting and positive pressure

Furnace · NPF

The NPF is a Category IV appliance with positive pressure in the vent. Use only the specified venting system and install direct vent when possible.

  1. Vent exhaust gases directly outdoors with the recommended materials.
  2. Do not connect the furnace vent to any other gas appliance vent.
  3. Each furnace needs its own intake and vent pipes, terminated individually.
  4. Do not connect the furnace to a chimney flue that serves a solid fuel appliance.
  5. Use a new vent system if possible; if reusing one, inspect it for punctures, cracks and blockages.
  6. If a furnace replaces one on an existing vent, check that the remaining appliance vents still meet code and may need re-sizing.

Applies to: NPF direct vent and venting systems

Source: Navien NPF installation and operation manual, p. 59. Written in our own words; check the manual for your exact model.

Check vent wall seals and terminals for CO safety

Furnace · NDF

To prevent CO poisoning, confirm all openings in the outside wall around the vent and air intake pipes are sealed so combustion products cannot enter the building. Confirm the vent and air intake terminals are not blocked in any way. Keep objects away from vent terminals.

  1. Check that all wall openings around vent and air intake pipes are sealed.
  2. Check that vent and air intake terminals are not obstructed.
  3. Keep nothing in or around the vent terminals that could block airflow.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 6, p. 5. Written in our own words; check the manual for your exact model.

Clearances and door-in-place caution

Furnace · NDF

Keep combustibles well away from the furnace and never run it with access doors removed.

  1. Keep combustible items at least 3 feet (0.91 m) from the furnace.
  2. Do not block access for servicing the furnace.
  3. Do not use the combustion air or exhaust piping to hang clothes or anything else.
  4. Never run the furnace without the blower door and combustion compartment door in place, or when the blower has failed.

Applies to: NDF forced air gas furnace

Source: Navien NDF installation and operation manual, p. 89. Written in our own words; check the manual for your exact model.

Condensate neutralizers

Furnace · NDF

Local codes may require a condensate neutralizer. If condensate goes to a septic system, a neutralizer may be advisable. Install it with an overflow bypass tube.

  1. Check local code for a neutralizer requirement.
  2. Install the neutralizer with an overflow bypass tube.

Applies to: NDF condensate drain system

Source: Navien NDF Installation and Operation Manual, p. 46. Written in our own words; check the manual for your exact model.

Connecting an A/C evaporator drain to the furnace drain

Furnace · NDF

If an air conditioner evaporator coil shares the furnace drain line, its drain must join downstream of the trap, not upstream.

  1. Install a tee fitting (field supplied) on the trap outlet.
  2. Connect the evaporator coil condensate drain to the tee, downstream of the trap.
  3. Do not connect the evaporator drain upstream of the furnace trap.

Applies to: NDF with air conditioner evaporator drain

Source: Navien NDF Installation and Operation Manual, p. 45. Written in our own words; check the manual for your exact model.

Cooling coil placement with the furnace

Furnace · NPF

If the furnace is used with a cooling unit, the furnace must go upstream of or in series with the coil. A coil upstream of the furnace causes premature heat exchanger failure. For vertical applications the coil width must be at least the furnace width minus 1 inch. A coil above an upflow furnace may match the furnace width or be one size larger.

Applies to: NPF700 with cooling coil

Source: Navien NPF installation and operation manual, p. 26. Written in our own words; check the manual for your exact model.

Do not adjust gas valve outlet pressure

Furnace · NPF

The gas valve outlet pressure is set at the factory and works for both natural gas and propane. Field adjustment or measurement of outlet pressure can damage the valve.

Applies to: NPF700 series furnaces

Source: Navien NPF Condensing Hydro-furnace installation and operation manual, p. 134. Written in our own words; check the manual for your exact model.

Do not run without venting, filter or doors

Furnace · NDF

Operating without proper venting can cause fire or CO poisoning. Operating without a filter can clog the heat exchanger with dust. Heating must not run unless the doors are installed.

  1. Confirm the venting system is installed correctly before operation.
  2. Install the air filter before operating the furnace.
  3. Install all doors before running the heating function.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 5. Written in our own words; check the manual for your exact model.

Drainage and venting site requirements

Furnace · NPF

Locate the furnace where a leak will cause minimal damage, with a suitable drain nearby. Installing without a drain voids the warranty. Keep vent termination at least 12 in above ground and above the highest expected snow level, or as local code requires if greater. Do not enclose the vent termination.

Applies to: NPF700 all models

Source: Navien NPF installation and operation manual, p. 28. Written in our own words; check the manual for your exact model.

ECM choke on 3/4 hp and 1 hp models

Furnace · NDF

On 3/4 hp and 1 hp models only, the ECM supply includes a power factor corrector choke coil.

Applies to: 3/4 hp and 1 hp models

Source: Navien NDF installation and operation manual, p. 72. Written in our own words; check the manual for your exact model.

Electrical safety when servicing the furnace

Furnace · NDF

Power must be off before the front cover is removed. Wiring errors during controls service can cause improper operation.

  1. Turn off or disconnect power before removing the front cover.
  2. Do not touch the power supply or internal components with wet hands.
  3. Label all wires before disconnecting them from the controls.
  4. Verify proper operation after servicing the controls.
  5. Use only approved replacement or accessory parts.

Applies to: All NDF furnaces

Source: Navien NDF installation and operation manual, p. 82-83. Written in our own words; check the manual for your exact model.

Excess flow valve sizing

Furnace · NPF

An excess flow valve sized too small stops full gas flow to the furnace and can cause poor operation. Check the valve's minimum and maximum flow rating before installing it.

  1. Find the manufacturer's minimum and maximum flow capacity rating for the valve.
  2. Confirm the valve passes the full furnace gas flow.
  3. Do not install an undersized valve.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 47. Written in our own words; check the manual for your exact model.

Front control panel button functions

Furnace · NPF

The Power button turns the furnace on or off but does not cut line voltage to the unit. Menu opens the main menu. Back returns to the previous screen. OK selects the highlighted item. Up and Down raise or lower the temperature setting or parameter, or move through menu items.

Applies to: NPF front control panel

Source: Navien NPF installation and operation manual, p. 13. Written in our own words; check the manual for your exact model.

Front control panel display icons

Furnace · NPF

Error icon shows when a fault occurs. Gas type shows the fuel in use. Freeze Protection shows when the unit is in freeze protection mode. Outdoor temperature is displayed. Operating icons show standby, cooling, blower and heating. The status message line shows the current operating state. The water level indicator shows the current water level.

Applies to: NPF front control panel

Source: Navien NPF installation and operation manual, p. 13. Written in our own words; check the manual for your exact model.

Gas and utility access

Furnace · NPF

Locate the furnace near where gas and electrical service enter the building so the supply runs stay short.

Applies to: NPF700 all models

Source: Navien NPF installation and operation manual, p. 28. Written in our own words; check the manual for your exact model.

Gas smell response

Furnace · NDF

If gas is smelled, do not light anything, do not touch electrical switches or use a landline phone. Call the gas provider from outside the building and follow their instructions. If the gas provider cannot be reached, call the fire department. Do not re-enter until authorized.

  1. Do not light any appliance.
  2. Do not operate electrical switches or use landline phones in the building.
  3. Call the gas provider from a neighbor's phone and follow their instructions.
  4. If the gas provider cannot be reached, call the fire department.
  5. Do not return until the gas supplier or fire department authorizes it.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 1, p. 4. Written in our own words; check the manual for your exact model.

Gas supply and airflow must be clear before startup

Furnace · NDF

Do not turn the furnace on unless the gas supply is fully open, the inlet and exhaust air are not blocked, and the duct is clear of obstructions. Doing so can damage the furnace.

  1. Fully open the gas supply valve.
  2. Confirm inlet and exhaust air paths are not blocked.
  3. Confirm the duct is clear of obstructions before turning on the furnace.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 6. Written in our own words; check the manual for your exact model.

Gas type and LP conversion

Furnace · NDF

The furnace comes factory set for natural gas only. LP gas requires the natural gas to LP conversion kit, and only a trained installer, service agency or gas supplier should convert it.

  1. Confirm the gas type on the data plate before installation.
  2. Use only the natural gas to LP conversion kit for LP operation.
  3. Have a trained and qualified installer, service agency or gas supplier perform any conversion.
  4. Connect the furnace only to commercial utility or supplier gas. Private well gas can damage the furnace.

Applies to: NDF gas furnace

Source: Navien NDF Installation and Operation Manual, p. 47. Written in our own words; check the manual for your exact model.

Gas valve replacement must match the original

Furnace · NDF

A wrong gas valve can cause fire, explosion or CO poisoning.

  1. Replace the gas valve only with the same model number, or the model the manufacturer specifies.

Applies to: All NDF furnaces

Source: Navien NDF installation and operation manual, p. 82. Written in our own words; check the manual for your exact model.

Glycol for freeze protection in the hydronic loop

Furnace · NPF

Propylene glycol may be used up to 30% concentration. Higher concentrations reduce input and can cause noise in the hydronic system. Glycol is injected manually into the water tank (see section 2.8).

Applies to: NPF700 all models

Source: Navien NPF installation and operation manual, p. 27. Written in our own words; check the manual for your exact model.

IAQ accessory outputs

Furnace · NPF

Accessory contacts follow blower and heating or fan operation.

  1. Electronic air cleaner (EAC): 120 VAC output is on when the blower is energized and off when the blower stops.
  2. Humidifier (HUM): energized in Heating mode when the humidistat calls for humidity; removed when the blower stops.
  3. Dehumidifier (DEHUM): on when the dehumidifier is enabled and the blower runs in Fan mode; off when the blower stops.
  4. Check these outputs at the accessory terminals when troubleshooting IAQ equipment.

Applies to: Systems with IAQ accessories

Source: Navien NPF installation and operation manual, p. 99. Written in our own words; check the manual for your exact model.

Installation limits and approved use

Furnace · NPF

The furnace is for indoor residential heating only and is approved for USA and Canada only. It is not for mobile homes, trailers, recreational vehicles or outdoor use, and must not be installed in an unconditioned space that can freeze. Installation and service must be done by a qualified installer, service agency or gas supplier.

  1. Install the furnace indoors in a conditioned space, not in a mobile home, trailer or recreational vehicle.
  2. Confirm the installation is in the USA or Canada.
  3. Use only qualified installers, service agencies or the gas supplier for installation and service.

Applies to: NPF condensing hydro-furnace, all models

Source: Navien NPF installation and operation manual, p. 1, p. 4, p. 5, p. 8. Written in our own words; check the manual for your exact model.

Installation location and application limits

Furnace · NPF

Install indoors only, such as in an attic, crawl space or enclosed garage with an operating door. Do not install in an unconditioned space that can freeze, or in a mobile home, trailer or recreational vehicle, or the warranty is void. Not designed for outdoor use. In commercial buildings it must be ducted, installed indoors in a site-built building, and not used as a make-up air unit.

Applies to: NPF condensing hydro-furnace

Source: Navien NPF installation and operation manual, p. 8. Written in our own words; check the manual for your exact model.

Installer Menu parameter groups

Furnace · NPF

Operation parameters are grouped into sub menus. Thermostat and HEAT settings are covered on these pages. COOL/HP, FAN, Airflow, Protection, etc (IAQ setup) and Installation are also in the parameter list. Some items are hidden depending on other settings.

  1. Enter the Installer Menu and select Parameter Settings.
  2. Select the sub menu that matches the system function you need to change.
  3. Use Up or Down to change values, then press OK to confirm.

Applies to: NPF700 series

Source: Navien NPF installation and operation manual, p. 110. Written in our own words; check the manual for your exact model.

Intake air contamination check

Furnace · NPF

Contaminated combustion air can damage the furnace and void the warranty. Check the area before installing intake piping.

  1. Check the area for dust, sawdust, sand, flour, aerosols and chlorine or fluorine compounds before installing.
  2. Check for corrosive sources such as pool chemicals, refrigerant leaks, paint removers, auto body shops and dry cleaners.
  3. If contaminants are present, remove them permanently or relocate the air inlet and vent terminations to clean air.
  4. If the furnace must go in contaminated air, use direct venting with air from outside the building.

Applies to: Combustion air intake

Source: Navien NPF installation and operation manual, p. 58. Written in our own words; check the manual for your exact model.

Integrated ignition control layout

Furnace · NDF

The integrated furnace ignition control has a fault code button, a red status LED, a heat staging jumper (P5), a 5A fuse, thermostat terminals, a 24 VAC Molex, a 120 VAC Molex, a park terminals block, and connections for an electronic air cleaner and power humidifier.

Applies to: NDF600 models

Source: Navien NDF installation and operation manual, p. 64. Written in our own words; check the manual for your exact model.

Keep combustibles and sprays away from the furnace

Furnace · NDF

Do not store or use gasoline or flammable liquids near the furnace. Keep newspapers, laundry, hair sprays, spray paints and compressed gases away from the furnace and vent system, including the vent termination.

  1. Store flammable products in approved closed containers away from the furnace.
  2. Keep combustibles, aerosols and compressed gases clear of the furnace and vent system.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 4, p. 5. Written in our own words; check the manual for your exact model.

Keep flammables and combustibles away from the furnace

Furnace · NDF

Flammable vapors can reach the burner and ignite. Combustible materials near the furnace or vent can start a fire.

  1. Do not store or use gasoline, solvents, adhesives or other flammable products in the same room as the furnace.
  2. Store flammable products in approved, tightly closed containers away from children and pets.
  3. Do not place newspapers, laundry or other combustibles near the furnace or venting system.

Applies to: All NDF furnaces

Source: Navien NDF installation and operation manual, p. 81-82. Written in our own words; check the manual for your exact model.

Keep the outdoor gas regulator vent clear (LP and natural gas)

Furnace · NDF

Regulator vents outdoors must stay open. Ice or blockage can cause regulator failure, fire or explosion.

  1. Check the regulator vent for moisture or ice buildup.
  2. Have the gas supplier clean and inspect the regulator air vent screen periodically.
  3. Keep the protective regulator cover in place.
  4. If moisture keeps building up in the vent, contact the gas supplier.

Applies to: Furnaces with an outdoor gas service regulator or LP tank regulator

Source: Navien NDF installation and operation manual, p. 86-87. Written in our own words; check the manual for your exact model.

Label wires before disconnecting controls

Furnace · NDF

When servicing controls, label every wire before disconnecting it. Wrong wiring can cause improper operation. Verify proper operation after any control service.

  1. Label all wires before disconnecting them.
  2. Reconnect per the labels.
  3. Verify correct operation after servicing.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 6. Written in our own words; check the manual for your exact model.

Leak testing

Furnace · NDF

Never test for gas leaks with an open flame.

  1. Use a commercial leak detection soap solution on all gas connections.
  2. Do not use an open flame to check for leaks.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 9. Written in our own words; check the manual for your exact model.

Main furnace components (reference)

Furnace · NDF

Main components on the two-stage NDF furnace: combustion air intake fitting, flame roll-out switches, flame sensor, two-stage gas valve, air high temperature limit behind the gas valve, vent drain assembly, secondary heat exchanger drain, condensate trap, two-stage integrated furnace control, 24 VAC 40VA transformer, burner assembly, hot surface igniter, two-speed inducer, pressure switch assembly, front manifold cover pressure tap, PFC choke coil on 3/4 and 1 HP units, door switch and junction box, blower motor, and circulating air blower.

Applies to: NDF two-stage furnaces

Source: Navien NDF installation and operation manual, p. 86. Written in our own words; check the manual for your exact model.

Massachusetts gas piping rules

Furnace · NDF

In Massachusetts, a licensed plumber or gas fitter must install the product. Flexible connectors may not exceed 36 in (914 mm). Lever gas shutoffs must be T-handle type. Copper gas piping is not allowed.

  1. Use a licensed plumber or gas fitter.
  2. Keep flexible gas connectors 36 in (914 mm) or shorter.
  3. Use T-handle gas shutoffs.
  4. Do not use copper tubing for gas piping.

Applies to: NDF600 series furnaces installed in Massachusetts

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 7. Written in our own words; check the manual for your exact model.

Massachusetts side-wall vent requirements

Furnace · NPF

Required when a side-wall horizontal vent terminates less than seven feet above finished grade. Carbon monoxide detectors and a warning sign are needed, and the installation must be done by a licensed plumber or gas fitter under 248 CMR 4.00 and 5.00.

  1. Install a battery or hard-wired CO detector on the same floor as the appliance, or on the next adjacent floor if the appliance is in a crawl space (not required for a detached uninhabitable garage).
  2. For all residential dwellings, place a CO detector on each habitable level.
  3. Use CO detectors that meet NFPA 720 and are ANSI/UL 2034 listed and IAS certified.
  4. Where a through-the-wall vent is less than seven feet above grade, mount a metal or plastic sign at least eight feet above grade, directly in line with the vent terminal.
  5. Sign text must read GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS, with letters at least 0.5 inch high.
  6. The local gas inspector must confirm CO detectors and signage are in place before approving the installation.

Applies to: Side-wall horizontally vented gas appliances in Massachusetts

Source: Navien NPF installation and operation manual, p. 181. Written in our own words; check the manual for your exact model.

Motor lubrication

Furnace · NDF

The inducer motor and circulating fan motor are sealed bearing motors and need no routine lubrication. Adding lubrication voids the warranty, shortens motor life, and attracts dust.

Applies to: NDF600 models

Source: Navien NDF installation and operation manual, p. 66. Written in our own words; check the manual for your exact model.

Neutralizer media check and replacement

Furnace · NPF

Check the neutralizer media and outlet pH regularly. The manual recommends an annual pH test with test strips or an electronic meter.

  1. Test the pH at the neutralizer outlet once a year.
  2. Replace the neutralizing media when pH falls below the minimum set by the local water authority.
  3. If no local minimum is specified, replace the media when pH is below 6.0.
  4. Get replacement media from the local Navien distributor.

Applies to: NPF700 series with neutralizer disposal

Source: Navien NPF installation and operation manual, p. 41-42. Written in our own words; check the manual for your exact model.

Not for low-NOx regulated areas

Furnace · NDF

This furnace is not certified for jurisdictions requiring NOx emissions of 40 ng NOx/J or lower. Check local air district rules before installing.

  1. Check the local air district requirements before installation.
  2. Do not install in a low-NOx regulated area.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 1. Written in our own words; check the manual for your exact model.

Not for mobile homes or RVs

Furnace · NDF

Do not install in a mobile home, trailer or recreational vehicle. Doing so can cause unsafe operation and voids the warranty.

  1. Confirm the site is not a mobile home, trailer or RV before installing.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 1, p. 5. Written in our own words; check the manual for your exact model.

Operating tips to reduce heating load

Furnace · NDF

Simple habits that improve efficiency and lower the load on the system.

  1. Keep air filters clean to improve efficiency and cut heating costs.
  2. Keep windows and doors closed during the heating season.
  3. Limit use of kitchen hoods and other exhaust fans.
  4. Keep furniture and drapes clear of supply registers and return grills.
  5. Avoid plastic deflectors on supply registers, which can short-circuit warm air into the returns.
  6. Keep heat-producing items such as TVs, radios and lamps away from the thermostat.

Applies to: NDF forced air gas furnace

Source: Navien NDF installation and operation manual, p. 89. Written in our own words; check the manual for your exact model.

Power off before removing the front cover

Furnace · NDF

Do not remove the front cover unless power to the furnace is off or disconnected, to avoid electric shock.

  1. Turn off or disconnect power to the furnace.
  2. Then remove the front cover.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 6. Written in our own words; check the manual for your exact model.

Pre-authorization and information needed before service

Furnace · NPF

All repairs need pre-authorization from Navien Technical Support. The installer or a licensed professional should contact Technical Support once they are at the installation site.

  1. Get pre-authorization from Technical Support before starting any repair.
  2. Have the model number, serial number, date purchased, and installation location and type ready.
  3. Have the error code ready if one shows on the front control panel display.

Applies to: NPF700 condensing hydro-furnace models

Source: Navien NPF installation and operation manual, p. 186. Written in our own words; check the manual for your exact model.

Propane and high altitude conversion

Furnace · NPF

The furnace can be field converted to propane using the included LP orifice and a DIP switch setup. High altitude operation up to 10,100 ft uses the factory-supplied high altitude accessory. Propane conversion kits ship with the unit from the factory.

Applies to: NPF condensing hydro-furnace

Source: Navien NPF installation and operation manual, p. 8–9. Written in our own words; check the manual for your exact model.

Qualified installation and service only

Furnace · NDF

Installation and service must be done by a qualified installer, service agency or the gas supplier. Installation must follow local codes or, if none apply, the National Fuel Gas Code and related gas and electrical codes.

  1. Use only a qualified installer, service agency or gas supplier.
  2. Follow local codes first; use NFPA 54 / CSA B149.1 where no local code applies.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 1, p. 5. Written in our own words; check the manual for your exact model.

Receiving inspection

Furnace · NDF

On arrival, inspect all cartons and contents for transit damage. Note damage on the delivery papers and file a claim with the last carrier. After delivery, check the rating plate matches the job specification and read the full instructions before installing.

  1. Inspect cartons and contents for transit damage on receipt.
  2. Note any damage on the delivery papers and file a claim with the last carrier.
  3. Check the unit rating plate against the job specification.
  4. Read the full instructions before starting installation.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 8. Written in our own words; check the manual for your exact model.

Reinstall the front cover

Furnace · NPF

Seats the two front cover sections correctly after service.

  1. Push the lower front cover forward onto the furnace.
  2. Align the upper front cover with its original mounting position and make sure it is fully seated against the furnace.
  3. Turn the three knobs clockwise to tighten the cover.

Applies to: NPF700 series (all listed models)

Source: Navien NPF installation and operation manual, p. 90. Written in our own words; check the manual for your exact model.

Return air ducting when supply goes outside the space

Furnace · NDF

If supply ducts carry air to areas outside the furnace space, the return air must also be ducted to the furnace casing and terminate outside the furnace space.

  1. Seal return ducts to the furnace casing.
  2. Route the return duct to terminate outside the furnace space.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 9. Written in our own words; check the manual for your exact model.

Return air temperature when heating

Furnace · NPF

When the furnace is heating, return air entering the furnace must be between 55°F (12°C) and 100°F (37°C).

Applies to: NPF700 all models

Source: Navien NPF installation and operation manual, p. 25. Written in our own words; check the manual for your exact model.

Side plates are interchangeable

Furnace · NPF700

Side plates can be used for either right or left installation. Check the diagram so the tabs are bent in the correct orientation for the chosen side.

Applies to: Return air box kit side plates

Source: Navien return air box kit installation manual, p. 1. Written in our own words; check the manual for your exact model.

Unconditioned or mobile space restriction

Furnace · NDF

Do not install the furnace in an unconditioned space that can freeze, or in a mobile home, trailer or recreational vehicle. Dry indoor locations only.

  1. Confirm the install space is conditioned and dry before setting the furnace.
  2. Keep the furnace protected from weather.

Applies to: NDF600 series

Source: Navien NDF installation and operation manual, p. 9. Written in our own words; check the manual for your exact model.

Upflow vent and draining option figures

Furnace · NDF

Figure 16 shows the approved upflow vent and drain layouts, including top vent or left vent options with left or right drain, internal or external trap mounting, and optional intake. Figure labels were readable but the drawings themselves were not, so confirm the exact layout against the drawing in the full manual.

  1. Confirm the vent position (top or left) and whether the drain is internal or external.
  2. Confirm whether the intake is used (optional).
  3. Follow the inducer orientation in Table 5 for the chosen layout.

Applies to: Upflow installations

Source: Navien NDF installation and operation manual, p. 40. Written in our own words; check the manual for your exact model.

Use only approved replacement parts

Furnace · NDF

Unapproved replacement or accessory parts can cause improper or dangerous operation and void the warranty. Gas valves must be replaced only with the same model number or the one the manufacturer specifies.

  1. Use only approved replacement and accessory parts.
  2. Replace the gas valve only with the same model number or the manufacturer-specified part.

Applies to: NDF600 series furnaces

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 5, p. 6. Written in our own words; check the manual for your exact model.

Use the approved manufactured-home standard

Furnace · NDF

In manufactured homes, install to the HUD Manufactured Home Construction and Safety Standard (24 CFR Part 3280), or NFPA 225 or CSA Z240 MH where that standard does not apply.

  1. Install per 24 CFR Part 3280, or NFPA 225 / CSA Z240 MH if Part 3280 does not apply.

Applies to: NDF600 series furnaces in manufactured homes

Source: Navien NDF Forced Air Gas Furnace installation and operation manual, p. 1. Written in our own words; check the manual for your exact model.

UV light precaution

Furnace · NPF

Do not use a UV light if the supply or return air openings can be exposed to it, since many furnace parts can be damaged by UV exposure.

  1. Confirm the UV light cannot reach the supply or return air openings before energizing it.
  2. If exposure is possible, do not install or run the UV light.

Applies to: Installations with a UV light accessory

Source: Navien NPF installation and operation manual, p. 99. Written in our own words; check the manual for your exact model.

Vent Installation Detector (VID) limits

Furnace · NPF

The VID does not detect every vent movement or separation. It can detect the vent pipe only when inserted 2-3/4 in (70 mm). It cannot detect a leak, a disconnection anywhere between the furnace and the outside termination, or a blockage.

  1. Inspect all vent pipe connections periodically.
  2. Do not rely on the VID alone to confirm the vent is sealed and clear.

Applies to: Vent pipe connection checks

Source: Navien NPF installation and operation manual, p. 64. Written in our own words; check the manual for your exact model.

Venting safety warnings

Furnace · NPF

Incorrect clearances can circulate exhaust gas and cause dangerous furnace operation, leading to death or serious injury. Vent materials and connections must be correct.

  1. Always follow the required clearances in the tables on pages 65 and 68.
  2. Use only approved venting materials and never mix pipe types.
  3. Check all vent pipe connections periodically.

Applies to: All venting work

Source: Navien NPF installation and operation manual, p. 69, 72. Written in our own words; check the manual for your exact model.

Wiring replacement and grounding

Furnace · NPF

Replacement wire must be copper with at least 221°F (105°C) rating. Gas piping and water piping must never be used as ground.

  1. Use only copper conductor replacement wire rated at least 221°F (105°C).
  2. Connect an earth ground wire from the furnace ground screw in the junction box to the electrical service panel.
  3. Do not attach the ground wire to gas or water pipes; plastic pipe or dielectric unions can prevent proper grounding.
  4. Label all wires before disconnecting them when servicing the controls.
  5. Check operation after any service.

Applies to: NPF furnace wiring and grounding

Source: Navien NPF installation and operation manual, p. 77-79. Written in our own words; check the manual for your exact model.

Annual pH check and media replacement

General · Condensate Neutralizer Tank

Check the outlet pH once a year and replace the media when it drops below the local water authority minimum or below pH 6.0.

  1. Check the pH at the neutralizer outlet annually using pH test strips or an electronic pH meter.
  2. Keep the outlet accessible for testing.
  3. Monitor the media level in the tank periodically.
  4. Replace the media when pH is below the local minimum or below 6.0 (part GXXX001329).

Applies to: Navien condensate neutralizer tank

Source: Navien commercial neutralizer installation instructions, p. 2. Written in our own words; check the manual for your exact model.

CIP solution handling

General · WEC Series

Only Navien CIP Solution may be used. Avoid splashing it on skin, eyes or clothing when refilling. Refill it according to the use cycle.

  1. Use only Navien CIP Solution.
  2. Refill the CIP solution based on the use cycle.
  3. Avoid splashing the solution on skin, eyes or clothes during refill.

Applies to: WEC600

Source: Navien WEC600 service manual, p. 7. Written in our own words; check the manual for your exact model.

Do not power the unit before water is connected and purged

General · WEC Series

Do not plug in or apply power until water connections are correct, the unit is filled, and air is purged. Water must be flowing to the WEC while Install Check Mode runs.

Applies to: WEC600

Source: Navien WEC Series service manual, p. 25-26. Written in our own words; check the manual for your exact model.

Do not run forced CIP right after STR

General · WEC Series

Forced CIP (option 08 in section 3.8) should not be run right after STR mode, because CIP is reset at the end of STR. Do not stop STR mode manually. If it is stopped, restart and finish it.

Applies to: WEC Series STR and forced CIP

Source: Navien WEC Series Service Manual, p. 48. Written in our own words; check the manual for your exact model.

Drain line air gap

General · WEC Series

A sufficient air gap is required on the drain line. The detailed requirement is in section 2.7 (Connecting the Drain Lines).

  1. Provide the required air gap on the drain line per section 2.7, p. 20.

Applies to: WEC600

Source: Navien WEC600 service manual, p. 7. Written in our own words; check the manual for your exact model.

Filter replacement and unit safety checks

General · WEC Series

Replace the sediment pre-filter and post carbon block (C/B) filter on their replacement cycles. If the unit makes an unusual sound, smells of burning, or smokes, cut power at the plug and request service. Do not disassemble the unit yourself, do not let children play with it, and do not store objects on top of it.

  1. Replace the Sediment Pre-Filter and Post Carbon Block (C/B) Filter on schedule.
  2. If there is a strange sound, burning smell or smoke, unplug the power plug immediately.
  3. Do not disassemble the product.

Applies to: WEC600

Source: Navien WEC600 service manual, p. 7. Written in our own words; check the manual for your exact model.

Handling chlorine tablets and CIP solution

General · WEC Series

Wear impervious gloves and goggles when handling dry chlorine tablets, since the dust is caustic and can form hydrochloric acid. Do not put any detergent or chlorine tablet into the CIP tank. Only citric acid CIP solution is allowed in the CIP tank.

Applies to: WEC Series STR and CIP

Source: Navien WEC Series Service Manual, p. 46, 48. Written in our own words; check the manual for your exact model.

Isolate the unit if it leaks

General · WEC Series

If the unit is leaking, stop the flow first to prevent property damage.

  1. Close the inlet valve and the outlet valve.
  2. Open the bypass valve (manual valve upstream of the WEC).

Applies to: WEC Series leak response

Source: Navien WEC Series Service Manual, p. 41. Written in our own words; check the manual for your exact model.

Magnet and handling precautions

General · NaviClean

The filter contains a strong magnet. Keep it away from electrical devices, bank cards and other magnetic items. Take care handling it if the person has a pacemaker. The unit can be hot in operation.

Applies to: NaviClean filter

Source: Navien NaviClean installation and servicing manual, p. 4. Written in our own words; check the manual for your exact model.

Operating display states

General · WEC Series

Main panel shows the unit state. Standby: no icon. Product: one module solid. Product and regeneration: one module solid and the other blinking. Regeneration: one module blinking. Regeneration line CIP: CIP solid with progress shown; the cycle has 5 steps and takes about 17 minutes.

Applies to: WEC600

Source: Navien WEC Series service manual, p. 32. Written in our own words; check the manual for your exact model.

Pressing OK does not clear the issue

General · WEC Series

Pressing the OK button stops the audible alert only. The condition causing the alert must still be fixed.

  1. Fix the underlying cause (CIP refill, filter replacement or error) before expecting the alert to stop for good.

Applies to: WEC600

Source: Navien WEC600 service manual, p. 72. Written in our own words; check the manual for your exact model.

Protect internal components from air exposure

General · WEC Series

Internal components must not be exposed to air for more than 4 hours. Longer exposure can cause biofouling, which damages the unit and lowers efficiency.

  1. Keep the inlet and outlet port caps installed until the connection is ready.
  2. If the internals have been open to air for more than 4 hours, treat the biofouling risk before commissioning.

Applies to: WEC600

Source: Navien WEC600 service manual, p. 7. Written in our own words; check the manual for your exact model.

REPLACE FILTER icon meaning

General · WEC Series

A blinking REPLACE FILTER icon means replacement is recommended. A solid icon means replacement is required. A notification sound also plays.

Applies to: WEC Series main panel

Source: Navien WEC Series Service Manual, p. 42. Written in our own words; check the manual for your exact model.

Safety and preparation before replacing parts

General · WEC Series

Turn off power and water before any work. Drain the unit before removing waterway parts. Confirm the diagnosis and error codes before disassembly. Keep particles and dust out of the water path during reassembly. Check performance and operation after service.

  1. Turn off power and the water supply
  2. Drain all water from the WEC before removing waterway components
  3. Confirm all issues and error codes are diagnosed before disassembly
  4. Use a Phillips screwdriver, flashlight and magnetic tip; keep screws in a parts tray
  5. Refer to the component assembly diagrams and part lists when reassembling
  6. Check performance and operation after service

Applies to: WEC600

Source: Navien WEC600 service manual, p. 81. Written in our own words; check the manual for your exact model.

Unplug before changing filters

General · WEC Series

Turn the WEC off at the wall before any filter change. If power is still on, the unit will show an error and will not let the filter be replaced.

  1. Unplug the WEC power cord from the wall outlet before starting.

Applies to: WEC Series filter replacement

Source: Navien WEC Series Service Manual, p. 43, 45. Written in our own words; check the manual for your exact model.

View user information

General · WEC

Shows the cumulative treated water since install or factory reset. Extra values include feedwater TDS, product water TDS (values below 25 ppm show as 25 ppm), and treated volume since last CIP. The screen switches every 3 seconds.

  1. From any menu, press Back several times until the user information screen appears.
  2. In standby, product, product/regeneration or regeneration state, press and hold OK for more than 3 seconds to see the extra values.

Applies to: WEC600

Source: WEC Series service manual, p. 34. Written in our own words; check the manual for your exact model.

Y-fitting acts as safety overflow

General · Condensate Neutralizer

The barbed Y-fitting is a safety overflow if the condensate drain clogs. Mount it as shown in the installation diagram.

  1. Install the Y-fitting according to the installation diagram.
  2. Confirm condensate still flows freely from the appliance drain through the neutralizer to the drain.

Applies to: Navien condensate neutralizer kit

Source: Navien Condensate Neutralizer installation instructions, p. 2. Written in our own words; check the manual for your exact model.

Cascade standby before On/Off

Tankless water heater · NPE

On Cascade systems the whole unit can stand by until it is switched on or off. 'WAIT' shows while the entire Cascade water heater is powering on or off.

  1. Wait for 'WAIT' to clear before expecting the unit to respond to On/Off.

Applies to: NPE Cascade systems

Source: Navien NPE remote controller manual, p. 25. Written in our own words; check the manual for your exact model.

Cleaning the cold water inlet filter

Tankless water heater · NPN

Clean the inlet filter to restore flow and avoid overheating faults.

  1. Drain the water heater first (page 16).
  2. Rinse the filter with clean cold running water and scrub with a brush if needed.
  3. Reinsert and tighten the filter.
  4. Refill the water heater, then check for leaks at the open faucet and piping.

Applies to: NPN indoor and outdoor models

Source: Navien NPN user's information manual, p. 19-20. Written in our own words; check the manual for your exact model.

Confirm the unit is the right size before installing

Tankless water heater · CR / CC

Check the performance table for the model's input and flow range against the job's gas supply and water demand before installing.

  1. Compare the model's min and max heat input with the available gas supply.
  2. Check the flow rate for the required temperature rise against the expected hot water demand.
  3. Confirm the gas and manifold pressure ranges match the supply on site (natural gas or LP).

Applies to: CR and CC 180(A), 210(A), 240(A)

Source: Navien CR-CC installation manual, p. 5. Written in our own words; check the manual for your exact model.

Keeping the unit from freezing

Tankless water heater · NPN

Keep power and gas connected in cold weather and use direct vent intake and exhaust where possible.

  1. Do not unplug the power cord except for routine maintenance, because freeze protection needs electricity.
  2. Do not close the gas valve except for routine maintenance.
  3. If power or gas must be off for a long time, drain the unit.
  4. Use a direct vent exhaust and intake system to reduce air movement inside the unit.
  5. Use the optional recirculation mode for freeze protection.

Applies to: NPN indoor and outdoor models

Source: Navien NPN user's information manual, p. 19-20. Written in our own words; check the manual for your exact model.

No field gas conversion

Tankless water heater · CR, CC

The unit cannot be converted between natural gas and propane in the field.

  1. Check the gas type on the rating plate before installing.
  2. Do not attempt a conversion. Doing so voids the warranty.

Applies to: All CR and CC installations

Source: Navien CR/CC installation manual, p. 12. Written in our own words; check the manual for your exact model.

Read live data (Status Information menu)

Tankless water heater · Navien NPE-2

Shows live readings such as flow, temperatures, exhaust temperature, flame AD value, fan RPM, APS voltage, model, gas and firmware.

  1. Press Menu.
  2. Choose 2. Status Information and scroll to the reading.

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 7.4.2 p.95-96; 7.5 p.98-99, p.105-107. Written in our own words; check the manual for your exact model.

Read the error history

Tankless water heater · Navien NPE-2

The last 10 errors are listed in the menu.

  1. Press Menu.
  2. Choose 3. Error History to see the last 10 errors.

Applies to: Navien NPE-A2 (built-in recirculation) and NPE-S2 condensing tankless water heaters: NPE-150S2, NPE-180A2/S2, NPE-210A2/S2, NPE-240A2/S2

Source: Navien NPE-A2/S2 Installation Manual, 7.4.2 p.95-96; 7.5 p.98-99, p.105-107. Written in our own words; check the manual for your exact model.

2-way valve setting for internal or external pump

Water heater · H2Air

For the NPE-A2/NHW700-A system using the internal or an optional external pump, the 2-way valve inside the water heater is set to EXT.

  1. Set the 2-way valve inside the water heater to EXT.

Applies to: NPE-A2 and NHW700-A systems with internal or optional external pump

Source: Navien H2Air installation manual, p. 22. Written in our own words; check the manual for your exact model.

Air intake location for ducting

Water heater · NWP500

Outdoor air is often below 37°F (3°C) in fall and winter. Ducting outdoor air to the intake adds load to the heating and cooling system unless exhaust air is also directed outside. Keep the intake away from other appliance exhausts such as a dryer.

  1. Avoid drawing outdoor air unless exhaust is also ducted outside.
  2. Do not pull air from another indoor space without checking for negative pressure.
  3. Keep the intake away from dryer or other exhaust ducts.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 28. Written in our own words; check the manual for your exact model.

Annual T&P valve flush

Water heater · NWP500

Release water through the T&P valve once a year so it does not stick. Keep people clear, the water is very hot, and never block the discharge outlet.

  1. Turn off power to the water heater.
  2. Open the T&P valve handle on the side of the unit.
  3. Drain 1–2 gallons of water.
  4. Close the handle.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 64. Written in our own words; check the manual for your exact model.

Clean the intake air filter

Water heater · NWP500

Clean the air filter at the top intake duct once a year, or when the air filter alarm shows on the front panel. Replace it if required.

  1. Turn off power to the water heater.
  2. Hold the filter by its handle and pull it out of the intake air duct.
  3. Remove dust with water or a vacuum.
  4. If washed with water, dry it fully or wipe it dry.
  5. Push the filter all the way back into the intake duct.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 65. Written in our own words; check the manual for your exact model.

Cold-weather power failure

Water heater · CR, CC

The freeze prevention system does not run without power, so the heat exchanger can freeze. In areas with frequent outages, drain the unit completely if power will be off for a long time. Freeze damage is not covered under warranty. A battery backup can supply hot water during outages.

  1. Drain the unit before any long power outage in cold areas.

Applies to: Cold-climate installations with frequent outages

Source: CR-CC installation manual, p. 32. Written in our own words; check the manual for your exact model.

Copper piping and dielectric unions

Water heater · NWP500

Copper water lines can set up small galvanic currents that corrode connections. Dielectric unions are needed at the water connections.

  1. Install dielectric unions (field supplied) at the water connections when using copper piping.
  2. Use unions on the water lines so the heater can be removed later for service.

Applies to: NWP500 series

Source: Navien NWP500 installation manual, p. 16, 22. Written in our own words; check the manual for your exact model.

Delete a weekly operation schedule

Water heater · NWP500

Removes one saved weekly schedule item.

  1. Press and hold Menu for more than 5 seconds, then select Schedule and Weekly List.
  2. Select the schedule item and press OK.
  3. Choose Yes and press OK to delete, or No to keep it.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 user information manual, p. 16. Written in our own words; check the manual for your exact model.

Do not cut power during self diagnostic

Water heater · NWP500

Disconnecting power during the self diagnostic can damage the product. If power is cut and restored, the diagnostic restarts from the beginning.

  1. Do not disconnect power during the self diagnostic.
  2. If power was interrupted, allow the full self diagnostic to run again.

Applies to: NWP500 self diagnostic

Source: Navien NWP500 installation manual, p. 44. Written in our own words; check the manual for your exact model.

Electrical connection requirements

Water heater · NWP500

Key wiring rules for the junction box and field connections.

  1. Open the circuit breaker or pull the fuses and confirm power is off with a non-contact tester before any electrical work.
  2. Follow the wiring diagram for all connections.
  3. Use 10 AWG solid copper wire for all connections.
  4. Secure wires with a UL-listed or CSA-approved strain relief.
  5. Connect the ground wire to the green ground screw.
  6. Replace the junction box cover and access doors after servicing.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 user's information manual, p. 4. Written in our own words; check the manual for your exact model.

Electrical connection safety for the junction box

Water heater · NWP500

Contact with electrical parts in the junction box, behind access doors or inside the top shroud can cause fatal shock. Remove power at the breaker or fuses first and confirm it is off with a non-contact tester. Use 10 AWG solid copper, a UL-listed or CSA-approved strain relief, and a secure green ground screw. Replace the junction box cover and access doors after service.

  1. Open the circuit breaker or pull the fuses before any work.
  2. Confirm the power is off with a non-contact tester.
  3. Wire per the Wiring Diagram, using 10 AWG solid copper.
  4. Secure each cable with a UL-listed or CSA-approved strain relief.
  5. Connect the ground wire to the green ground screw.
  6. Refit the junction box cover and access doors.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 4. Written in our own words; check the manual for your exact model.

Error indication on the remote

Water heater · NPE

When an error occurs, the LED turns red and blinks. This does not apply in Cascade mode, where the LED does not blink. The error code appears on the LCD display.

  1. If the LED is red and blinking, read the error code shown on the LCD.
  2. Look up the code in the error code guide of this manual.

Applies to: NR-21DU remote controller

Source: Navien NPE remote controller manual, p. 14. Written in our own words; check the manual for your exact model.

Factory temperature setting and scald time table

Water heater · NWP500

The factory setting is 120°F (49°C). Water at 125°F (52°C) or higher can cause instant scalds. Time to a serious burn drops quickly as temperature rises: 120°F takes more than 5 minutes, 125°F about 1.5 to 2 minutes, 130°F about 30 seconds, 140°F under 5 seconds, and 150°F about 1.5 seconds. Stack effect can make the tank water up to 30°F hotter than the set point, and a hot room or pre-heated inlet water can also raise it. The thermostat alone is not an accepted scald control under ASSE 1070, so a mixing or temperature-limiting valve may be needed above 125°F.

  1. Leave the setting at the lowest temperature that meets the user's needs.
  2. Use a lower setting where children, elderly or disabled users are present.
  3. Advise the user to feel the water before bathing.
  4. Install a thermostatic mixing valve or temperature-limiting valve if the setting must go above 125°F.
  5. Check local codes for maximum allowed temperatures in nursing homes, schools and day care centers.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 5. Written in our own words; check the manual for your exact model.

Flooded appliance

Water heater · NPN

Do not use the appliance if any part has been under water.

  1. Call a qualified service technician to inspect the appliance.
  2. Have the technician replace any part of the control system and any gas control that was under water.

Applies to: All NPN models

Source: Navien NPN user's information manual, p. 3, p. 6. Written in our own words; check the manual for your exact model.

Freeze protection and winter exposure

Water heater · ComfortCirc

Insulate all exposed pipes in winter to prevent freeze damage. Do not unplug the pump or close valves during long winter absences, because the freeze prevention feature needs power and an open flow path. In extreme cold the pump runs automatically to protect the system.

  1. Insulate exposed piping before winter.
  2. Keep power on and valves open during extended winter absences.

Applies to: ComfortCirc recirculation pump

Source: Navien ComfortCirc installation and operation manual, p. 4. Written in our own words; check the manual for your exact model.

Front panel and remote timer settings are disabled with the kit installed

Water heater · NPN/NHW700

With the HotButton Kit in place, the heater's own recirculation controls no longer apply.

  1. Do not expect remote controller timer settings to take effect; they are disabled.
  2. Do not expect front panel recirculation settings to take effect; they are disabled.
  3. Use the parameter P.12 to set recirculation pump run time.

Applies to: NPN/NHW700 with HotButton Kit

Source: Navien HotButton add-on controller installation manual, p. 2. Written in our own words; check the manual for your exact model.

Front panel buttons

Water heater · NWP500

The front panel has five buttons for power, mode, menu navigation and temperature.

  1. Power button: turns the water heater on or off.
  2. Menu button: changes the operation mode and opens the menu screen.
  3. Up and Down buttons: raise or lower the temperature setting or a parameter, and move through menu items.
  4. OK button: selects the highlighted item.
  5. Back button: returns to the previous screen.

Applies to: NWP500 series

Source: NWP500 installation manual, p. 9-10. Written in our own words; check the manual for your exact model.

Front panel buttons and display icons (indoor models)

Water heater · NPN

Indoor front panel buttons: Power, Up, Down, Reset, Information, Diagnostics (installers only), Hot Water Recirculation, Master Unit/Cascade. Display icons include Error (code shown), Combusting (burner on), Recirculation Mode and Cascade operation.

Applies to: NPN indoor models

Source: NPN user's information manual, p. 8. Written in our own words; check the manual for your exact model.

Front panel indicators

Water heater · NPN

The front panel shows error codes, recirculation status, master or cascade status, and burner status.

  1. Error indicator: a code appears on the display when there is an error.
  2. Master Unit and Cascade operation indicators show multi-unit status.
  3. Hot Water Recirculation and Recirculation Mode indicators show recirculation status.
  4. Combusting indicator lights when the gas burner is on.
  5. Information button shows basic information.

Applies to: Indoor models with front panel

Source: Navien NPN user's information manual, p. 8. Written in our own words; check the manual for your exact model.

Front panel status icons

Water heater · NWP500

The display shows: schedule, error status, DR/Wi-Fi connection, operation mode, set temperature, anti-Legionella run (also shown in recirculation), recirculation status (Always On, Weekly, HotButton), heating element status (electric heater running, heat pump running, or heat pump stopped), hot water charge rate, and scald warning or freeze protection active.

  1. Use the error status icon to confirm a fault before reading the code.
  2. Check the heating element icons to see whether the electric heater or heat pump is running.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 User's Information Manual, p. 9–10. Written in our own words; check the manual for your exact model.

Gas line sizing and layout

Water heater · CR, CC

Use the water heater as the first appliance downstream of the meter.

  1. Install the water heater as the first appliance after the gas meter.
  2. Use the pipe sizing charts to select the gas supply pipe.
  3. Keep the gas connection at 3/4 in. minimum.
  4. Use flexible gas line only with adequate inner diameter and no crimps or tight bends.
  5. Install a manual gas shutoff valve close to the water heater.
  6. On rigid pipe, install a union close to the water heater.

Applies to: CR and CC series water heaters

Source: Navien CR/CC installation manual, p. 21. Written in our own words; check the manual for your exact model.

Gas shut-off in case of damage

Water heater · NPN

If the heater is damaged by overheating, fire, flood or another cause, shut off the gas.

  1. Close the manual gas shut-off valve if the heater is damaged or overheats.
  2. If the gas supply fails to shut off during overheating, close the manual gas valve to the appliance.
  3. Do not operate the heater again until a qualified technician has inspected it.

Applies to: All NPN models

Source: Navien NPN user's information manual, p. 5-6. Written in our own words; check the manual for your exact model.

Get Technical Support pre-authorization before repairs

Water heater · NWP500

All repairs on this water heater need pre-authorization from Navien Technical Support. The installer or a licensed professional should make that contact while standing at the unit.

  1. Have the installer or a licensed professional contact Navien Technical Support while at the installation site.
  2. Have the model number, serial number, date purchased, installation location and type ready.
  3. Give the error code shown on the front panel display, if one is showing.
  4. For water-side or electrical faults outside the water heater, have a licensed plumber or electrician check the affected system.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 83. Written in our own words; check the manual for your exact model.

Handling and lifting the unit

Water heater · NWP500

The unit is heavy and must be lifted with help.

  1. Lift the water heater with at least one assistant.
  2. Do not drop the unit while lifting or moving it.
  3. Shipping weight is 229 lb (NWP500-50), 265 lb (NWP500-65) or 282 lb (NWP500-80).

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 user's information manual, p. 6, 8. Written in our own words; check the manual for your exact model.

Handling the unit safely

Water heater · NWP500

The water heater is heavy. Lift with assistance and do not drop it. Shipping weight is 229 lb (NWP500-50), 265 lb (NWP500-65) or 282 lb (NWP500-80).

  1. Lift with at least one helper.
  2. Keep the unit upright and avoid dropping it during handling.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 6. Written in our own words; check the manual for your exact model.

Hose sets are not allowed as supply connections

Water heater · NWP500

The appliance must be permanently connected to the water mains.

  1. Connect the unit permanently to the water mains.
  2. Do not use hose sets as the water supply connection.

Applies to: NWP500 series

Source: Navien NWP500 installation manual, p. 22. Written in our own words; check the manual for your exact model.

Hot water charge display

Water heater · NWP500

The front panel shows the stored thermal energy in the tank, calculated from the current water temperature.

Applies to: NWP500 series

Source: Navien NWP500 User's Information Manual, p. 26. Written in our own words; check the manual for your exact model.

Hot water delay at faucet

Water heater · NPN

The water heater does not deliver hot water instantly at the faucet unless a recirculation line runs from the furthest fixture back to the water heater.

Applies to: NPN indoor and outdoor models

Source: NPN user's information manual, p. 11. Written in our own words; check the manual for your exact model.

Insulation blanket restrictions

Water heater · NWP500

This heater does not need an insulation blanket. If local code requires one, use only the manufacturer's kit. Energy-saving or unapproved devices are not covered by warranty.

  1. Do not cover or move operating or warning labels.
  2. Do not block the air openings.
  3. Do not cover the front panel, T&P valve or drain valve.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 30. Written in our own words; check the manual for your exact model.

Keep flammables away and keep covers in place

Water heater · NWP500

Fire prevention around the unit.

  1. Do not store flammable products such as gasoline, solvents or adhesives in the same room as the water heater.
  2. Keep the junction box cover and heating element access door covers in place.
  3. Keep the T&P relief valve unblocked, uncapped and unplugged.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 user's information manual, p. 6. Written in our own words; check the manual for your exact model.

Keep flammables away and protect the T&P relief valve

Water heater · NWP500

Do not use or store gasoline, solvents or adhesives in the same room as the water heater. Keep the junction box cover and heating element access covers in place. Keep the T&P relief valve (ANSI Z21.22) maintained and never blocked, capped or plugged, since it prevents explosion from high temperature and pressure.

  1. Store flammable products in approved, tightly closed containers away from the unit.
  2. Keep junction box and heating element access covers installed.
  3. Confirm the T&P relief valve is not blocked, capped or plugged.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 6. Written in our own words; check the manual for your exact model.

Label cables before disconnecting them

Water heater · H2Air

Wiring errors inside the unit can cause improper operation and unsafe conditions. Labelling the cables before removal prevents this.

  1. Label every cable before disconnecting any cable inside the unit.
  2. After servicing, verify the wiring connections and confirm the unit operates correctly.

Applies to: H2Air service work

Source: Navien H2Air installation manual, p. 14. Written in our own words; check the manual for your exact model.

LCD display icons

Water heater · NR-21DU

Icons show: timer is set; recirculation mode; current time; hot water in use; current set temperature; water heater operation in progress; operations locked; and an error code when one is active.

Applies to: NR-21DU remote controller

Source: Navien NR-21DU remote controller manual, p. 8. Written in our own words; check the manual for your exact model.

Limits on pumped liquid and use location

Water heater · ComfortCirc

The pump is for indoor use only and is not tested for pool or marine areas. It is only for domestic hot water with clean, thin, non-aggressive liquid with no solids, fibers or mineral oils. Water must stay between 36°F and 140°F and up to 145 psi, depending on the variant. Never use it to move flammable liquids.

Applies to: ComfortCirc recirculation pump

Source: Navien ComfortCirc installation and operation manual, p. 5-6. Written in our own words; check the manual for your exact model.

Outdoor temperature sensor connection

Water heater · H2Air

The outdoor sensor is supplied in the kit. Use 18 gauge thermostat wire and keep the sensor out of direct sunlight.

  1. Insert the exposed wire into the sensor terminal.
  2. Tighten the terminal screw with a screwdriver.
  3. Use 18 gauge thermostat wire for the sensor connection.
  4. Do not mount the sensor in direct sunlight.

Applies to: H2Air outdoor temperature sensor

Source: Navien H2Air installation manual, p. 18. Written in our own words; check the manual for your exact model.

Outlet mixing valve and closed-system notes

Water heater · CR, CC

Mixing valve and expansion control requirements.

  1. Use an outlet mixing valve that stops cold pressure from overcoming hot line pressure.
  2. In a closed supply system (for example with a backflow preventer), provide thermal expansion control.
  3. Do not connect to a heating system previously used with a non-potable water heater.
  4. Do not introduce boiler treatment chemicals into the potable water used for space heating.

Applies to: CR and CC series water heaters

Source: Navien CR/CC installation manual, p. 17 and p. 16. Written in our own words; check the manual for your exact model.

Pre-connection checks

Water heater · NWP500

Check the layout before connecting water lines so the T&P valve, discharge pipe, and condensate line all have room.

  1. Keep the T&P relief valve away from electrical parts.
  2. Confirm room for the T&P discharge pipe.
  3. Confirm room for the condensate drain tubing.
  4. Keep at least 6 in (152 mm) of clearance at the front for maintenance.

Applies to: NWP500 series

Source: Navien NWP500 installation manual, p. 22. Written in our own words; check the manual for your exact model.

Protect the thermocline tube and use approved piping

Water heater · NWP500

A damaged thermocline tube in the supply or outlet pipe can change water temperature. Use piping and sealants approved for potable water.

  1. Check that the thermocline tube inside the supply and hot outlet pipes is not damaged.
  2. Use pipe materials and sealants approved for potable water.
  3. Confirm suitable pipe material with local plumbing officials.

Applies to: NWP500 series

Source: Navien NWP500 installation manual, p. 23-24. Written in our own words; check the manual for your exact model.

Read the unit ID for a cascade error

Water heater · CR, CC

The remote controller shows which unit has the error. A master error and a slave 1 error look the same except for the unit label.

  1. Check the unit label on the remote controller (Master or Slave 1) before troubleshooting.

Applies to: Cascade systems

Source: CR-CC installation manual, p. 39. Written in our own words; check the manual for your exact model.

Recirculation may increase heat pump water heater run time

Water heater · ComfortCirc

Adding a recirculation system to a heat pump water heater can make the water heater cycle on more often.

  1. Tell the owner to expect more frequent heat pump water heater operation after recirculation is added.

Applies to: Heat pump water heater with ComfortCirc recirculation

Source: Navien ComfortCirc installation and operation manual, p. 9. Written in our own words; check the manual for your exact model.

Recirculation preheating icon behavior

Water heater · NPE

The preheating icon shows differently depending on the water heater connected. With non-condensing NPN units it flashes continuously during recirculation. With condensing NPE-A2/S2 units it stays on steadily.

  1. Start recirculation as usual.
  2. If an NPN unit is connected, expect the preheating icon to flash continuously.
  3. If an NPE-A2/S2 unit is connected, expect the preheating icon to stay on.

Applies to: NPN non-condensing and NPE-A2/S2 condensing water heaters

Source: Navien NPE remote controller manual, p. 18. Written in our own words; check the manual for your exact model.

Recirculation system configurations and pump control

Water heater · ComfortCirc

The ComfortCirc supports a dedicated return line or a shared return line that uses the optional NaviCirc. It has built-in temperature and flow sensors. Settings can be made in the NaviLink app, or on the front panel of a connected Navien heat pump water heater, which can control the pump to reduce energy loss and follows CTA-2045 demand response. Wired On-Demand uses the optional HotButton.

Applies to: ComfortCirc recirculation pump

Source: Navien ComfortCirc installation and operation manual, p. 5. Written in our own words; check the manual for your exact model.

Remote controller buttons and LED

Water heater · NR-21DU

Power button turns the controller on or off. Up and Down buttons change temperature or value. OK button confirms. Lock button locks the other buttons. Preheat&Timer button opens timer settings and turns recirculation on. LED: green means normal mode, red means an error has occurred.

Applies to: NR-21DU remote controller

Source: Navien NR-21DU remote controller manual, p. 7. Written in our own words; check the manual for your exact model.

Remote controller indicators (outdoor models)

Water heater · NPN

LED: green means normal mode, red means an error has occurred. Display shows current time, set temperature, timer set, recirculation mode, hot water in use, operation in progress, lock status and error codes.

Applies to: NPN outdoor models with remote controller

Source: NPN user's information manual, p. 9. Written in our own words; check the manual for your exact model.

Removing the battery protective film

Water heater · NWP500

The battery protective film on the side of the front panel must be removed after installation and before the heater is connected to power.

  1. Complete the installation.
  2. Remove the battery protective film from the side of the front panel.
  3. Only then connect power.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 30. Written in our own words; check the manual for your exact model.

Replace the front panel battery

Water heater · NWP500

Do not recharge or impact the battery. The clock may need to be set again after replacement. Replacement is recommended every five years.

  1. Remove the battery from the side of the front panel.
  2. Install the new battery.
  3. Set the time on the front panel if needed.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 69. Written in our own words; check the manual for your exact model.

Scald risk and thermostatic mixing valves

Water heater · NWP500

Hot water can scald even at a low tank setting. Thermostatic mixing valves at each point of use lower this risk.

  1. Install thermostatic mixing valves (field supplied) at each point of use, per local code.
  2. If unsure whether the mixing valves are installed and set correctly, consult a qualified professional.

Applies to: NWP500 series

Source: Navien NWP500 installation manual, p. 18. Written in our own words; check the manual for your exact model.

Scald risk with recirculated hot water

Water heater · ComfortCirc

Operating the water heater at high temperature sends hot water through the recirculation loop, which can scald. Install thermostatic mixing valves at each point of use to reduce the risk.

  1. Install a thermostatic mixing valve at each point of use.

Applies to: ComfortCirc recirculation system

Source: Navien ComfortCirc installation and operation manual, p. 4. Written in our own words; check the manual for your exact model.

Seismic bracing requirement (California)

Water heater · NWP500

California law requires new, replacement and existing residential water heaters to be braced, anchored or strapped against earthquake falling or horizontal movement, at minimum per the California Plumbing Code or Section 17958.5 as amended locally.

  1. Brace, anchor or strap the water heater per the California Plumbing Code or local amendment.
  2. Use the California seismic guidelines for residential water heaters where applicable.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 6. Written in our own words; check the manual for your exact model.

Servicing controls

Water heater · NPN

Wiring errors during control service can make the heater operate improperly or dangerously.

  1. Label all wires before disconnecting them.
  2. Verify proper operation after servicing the controls.
  3. Use only approved replacement or accessory parts.

Applies to: All NPN models

Source: Navien NPN user's information manual, p. 6. Written in our own words; check the manual for your exact model.

Soldering near heater connections

Water heater · NWP500

Inlet and outlet fittings have non-metallic parts that can be damaged by heat. Solder away from the unit.

  1. Do not solder pipes while they are attached to the water heater.
  2. Solder a short length of pipe to a threaded adapter using 95/5 tin-antimony solder or an equivalent.
  3. Attach the adapter to the heater after soldering.
  4. Keep wet rags on the heater connections while soldering the home's pipes.

Applies to: NWP500 series

Source: Navien NWP500 installation manual, p. 24. Written in our own words; check the manual for your exact model.

Top vs side connections and heat traps

Water heater · NWP500

Use only top or only side inlet and outlet connections, and cap the unused ones. Top connections have built-in heat traps. Side connections do not.

  1. Pick top or side connections for the cold and hot lines, not both.
  2. Cap all unused inlets and outlets to prevent leaks.
  3. If the side connection is used and local code requires a heat trap, install a heat trap nipple, insert, or piping per code.

Applies to: NWP500 series

Source: Navien NWP500 installation manual, p. 16, 22, 24. Written in our own words; check the manual for your exact model.

Turn off power before installing the H2Air

Water heater · H2Air

Shut off power to the water heater before mounting the add-on controller. Electrical shock can cause severe injury or death.

  1. Turn off power to the water heater.
  2. Confirm power is off before installing the device.

Applies to: H2Air add-on controller installation

Source: Navien H2Air installation manual, p. 8. Written in our own words; check the manual for your exact model.

Turning the remote controller on or off

Water heater · NPE

Press the Power button to switch the controller on or off. When it is on, the display lights, the LED glows green and the current hot water temperature is shown. The backlight stays on for 8 seconds after any button press.

  1. Press the Power button to turn the controller on or off.
  2. Check that the LED is green and the set temperature shows on the display when it is on.

Applies to: NR-21DU remote controller

Source: Navien NPE remote controller manual, p. 14. Written in our own words; check the manual for your exact model.

Vent and intake inspection

Water heater · NPN

Venting faults can cause fire or carbon monoxide poisoning. Inspect the vent termination and air intake every year.

  1. Inspect the vent termination and air intake supply annually.
  2. Turn off and stop using the heater if any vent pipe, vent elbow or intake pipe is damaged, separated at a joint, or shows corrosion, rust or melting.
  3. Do not operate the heater without proper venting.
  4. Keep combustibles, hair spray and other compressed gases away from the heater and vent termination.

Applies to: All NPN models

Source: Navien NPN user's information manual, p. 5. Written in our own words; check the manual for your exact model.

Venting installation guidelines

Water heater · CR, CC

Keep the vent short and sealed, and slope it correctly.

  1. Keep the vent system as short and straight as possible.
  2. Locate the water heater as close as possible to the vent terminator.
  3. Do not common vent with any other gas appliance or vent stack.
  4. Slope the vent up toward the terminal at 1/4 in. per foot (2%).
  5. With other manufacturers' stainless vent, assemble male-to-female in the direction of condensate flow.
  6. Seal the exhaust and air intake pipes air tight at each joint from flue collar to terminator.
  7. Keep the seam of horizontal vent runs toward the top.
  8. Do not downsize the vent pipe.

Applies to: CR and CC series water heaters

Source: Navien CR/CC installation manual, p. 24. Written in our own words; check the manual for your exact model.

Venting material and temperature limits

Water heater · CR, CC

Plastic vent is allowed except at high temperatures. Certain systems require stainless or Category IV venting.

  1. Use plastic vent only when incoming or recirculation return water is at or below 160 F (70 C).
  2. If the set temperature is above 160 F (70 C) and the unit has an external recirculation loop or combination heating, use Navien stainless vent or a 3 in. Category IV system (typically Type BH special gas vent approved to UL 1738).
  3. Vent in accordance with ANSI Z223.1/NFPA 54 or CAN/CGA B149.1 and local codes.

Applies to: CR and CC series water heaters

Source: Navien CR/CC installation manual, p. 24. Written in our own words; check the manual for your exact model.

View error history

Water heater · NWP500

The panel keeps a list of the 10 most recent errors, newest at the top.

  1. Press and hold Menu for more than 5 seconds.
  2. Select Error History.
  3. Scroll the list with Up/Down and press OK on an error to see its details.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 user information manual, p. 20. Written in our own words; check the manual for your exact model.

View or delete a weekly schedule

Water heater · NWP500

Review the saved schedules or remove one from the list.

  1. From the Schedule menu, select Weekly List.
  2. Scroll with Up or Down and select a schedule to view its operation mode, time, temperature and selected days.
  3. To delete, select the schedule and press OK.
  4. On the Weekly Delete screen, select Yes and press OK to delete, or select No to keep it.

Applies to: NWP500 weekly schedule

Source: Navien NWP500 installation manual, p. 47-48. Written in our own words; check the manual for your exact model.

Water exposure and flood damage

Water heater · NWP500

If wiring, the thermostat or surrounding insulation gets wet, shut off the water heater at once and have it inspected by a qualified professional. If the unit was submerged in flood water, or the thermostat was submerged, replace the entire unit.

  1. Turn off the water heater immediately if water reaches the wiring, thermostat or insulation.
  2. Have a qualified professional inspect the unit.
  3. Replace the whole unit if it was submerged or the thermostat was submerged.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 installation manual, p. 6. Written in our own words; check the manual for your exact model.

Water exposure to electrical parts

Water heater · NWP500

Water near the wiring, thermostat or insulation is a serious hazard.

  1. If wiring, thermostat or insulation gets wet, turn the water heater off immediately.
  2. Have a qualified professional inspect the unit before it is run again.
  3. If the unit was submerged in flood water, or the thermostat was submerged, replace the entire unit.
  4. Confirm the unit stays dry during routine inspections.

Applies to: NWP500-50, NWP500-65, NWP500-80

Source: Navien NWP500 user's information manual, p. 6. Written in our own words; check the manual for your exact model.

Wiring multiple push button switches

Water heater · ComfortCirc

Several switches can share the same HotButton terminals or run on a common branch.

  1. Connect each switch either directly to the same controller terminal or to a common branch circuit run from the controller.
  2. Connect no more than 10 push button switches to one HotButton controller.
  3. Use UTP cable or cable larger than AWG 24.
  4. Keep total cable length at or below 328 feet (100 meters).

Applies to: Wired HotButton switches on the HotButton controller

Source: Navien ComfortCirc installation and operation manual, p. 29-30. Written in our own words; check the manual for your exact model.

Wiring parts supplied and external pump cable

Water heater · H2Air

The kit includes an outdoor sensor and a flow switch. Thermostat wiring is 18 AWG. An external pump connects directly to the water heater PCB with the Navien External Pump Cable.

  1. Use 18 AWG cable for thermostat wiring.
  2. Connect an external pump directly to the water heater PCB using the Navien External Pump Cable (GXXX001319).

Applies to: H2Air wiring and external pump connection

Source: Navien H2Air installation manual, p. 11. Written in our own words; check the manual for your exact model.

Same tips in your pocket

The HVACopedia app has these tips, every error code and the settings tables offline.

Open the app

For licensed technicians. Installer menus, test modes and access codes change settings that affect safety; only use them if you are trained on the appliance and understand the result. Gas, electrical and refrigerant work must be done by a qualified, licensed person, and the manufacturer’s manual for the exact model and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.