Navien · Furnace troubleshooting
Vent sizing and length checks
What is going on
Confirm the vent system is within length limits before installation.
Check in this order
- Size combustion air and exhaust piping per the vent length table.
- Keep total vent length at least 15 equivalent ft (4.6 m).
- Count all termination fittings and the concentric vent as straight pipe.
- Do not common vent with any other appliance.
- Do not connect the furnace to a chimney or flue serving other appliances or a solid fuel appliance.
- Do not vent up a chimney serving another appliance, or in a chase with other gas or fuel pipes, unless clearances to combustibles can be maintained.
Applies to: NDF600 series furnaces
More furnace guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NDF installation and operation manual, p. 25, 26. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.