Using the furnace as a construction site heater
What is going on
The furnace may be used during construction only if all the listed conditions are met.
Check in this order
- Permanently install the vent system per the installation instructions.
- Control the furnace with a room thermostat. Fixed jumpers that force continuous heat must not be used.
- Provide sealed return air ducts to the furnace.
- Keep the return air temperature between 60 °F (16 °C) and 80 °F (27 °C).
- Install air filters during construction, replace them as needed, and replace them at completion.
- Set the input rate and temperature rise per the rating plate.
- Supply 100% outside air for combustion during construction. Temporary ducting may be used but must not connect directly to the furnace.
- Size temporary ducting per NFPA 54/ANSI Z223.1 or CAN/CSA B149.1.
- Clean the heat exchanger, components, ducts, filters and evaporator coils after final construction cleanup.
- Verify ignition, input rate, temperature rise and venting per the installation instructions.
Applies to: NPF700 series
More furnace guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NPF installation and operation manual, p. 24. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.