Using the furnace as a construction site heater

NPF

What is going on

The furnace may be used during construction only if all the listed conditions are met.

Check in this order

  1. Permanently install the vent system per the installation instructions.
  2. Control the furnace with a room thermostat. Fixed jumpers that force continuous heat must not be used.
  3. Provide sealed return air ducts to the furnace.
  4. Keep the return air temperature between 60 °F (16 °C) and 80 °F (27 °C).
  5. Install air filters during construction, replace them as needed, and replace them at completion.
  6. Set the input rate and temperature rise per the rating plate.
  7. Supply 100% outside air for combustion during construction. Temporary ducting may be used but must not connect directly to the furnace.
  8. Size temporary ducting per NFPA 54/ANSI Z223.1 or CAN/CSA B149.1.
  9. Clean the heat exchanger, components, ducts, filters and evaporator coils after final construction cleanup.
  10. Verify ignition, input rate, temperature rise and venting per the installation instructions.

Applies to: NPF700 series

More furnace guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NPF installation and operation manual, p. 24. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.