Navien · Furnace troubleshooting

Prepare vent pipe and fittings

NDF

What is going on

Clean and prepare pipe so debris cannot block the exhaust, combustion air inlet or condensate drain.

Check in this order

  1. Clean and deburr all pipe cuts, including uncut lengths.
  2. Remove all shavings from the pipe before assembly.
  3. Use the correct cleaner, primer and cement when the pipe is not PVC.
  4. For ABS intake, use all-purpose cleaner and ABS to PVC transition cement.
  5. For CPVC intake, use all-purpose cleaner, clear or purple primer and all-purpose cement approved for the purpose.
  6. Clean out the inducer collar after installation, since initial shavings can block the inducer collar drain.

Applies to: NDF600 series furnaces

More furnace guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NDF installation and operation manual, p. 25, 30, 31. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.