Installing the pressure relief valve
What is going on
Install a 30 psi maximum pressure relief valve on the 3/4 in adapter on the upper cover. The valve must be ASME certified and installed only by a licensed professional.
Check in this order
- Apply thread seal tape to the threads of the valve before installing.
- Install the valve at the furnace outlet in the vertical position.
- Point the drain outlet horizontally out the side of the valve, then elbow down.
- Do not install any valve between the relief valve and the furnace.
- Run an outlet line toward the drain pan and make sure it drains properly.
- Do not reduce the discharge line or fit anything that restricts flow.
- Do not plug the relief valve.
- Keep the discharge from splashing hot water on an operator or the furnace.
Applies to: NPF700 all models
More furnace guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NPF installation and operation manual, p. 32. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.