Vent checks for the furnace exhaust and intake piping.
Check in this order
- Confirm the vent is 2 in or 3 in schedule 40 PVC, CPVC, polypropylene, or Type BH special gas vent (ULC-S636) for Category IV in Canada, following local codes and the manual.
- Confirm ABS or PVC cellular core pipe is not used for venting.
- Slope the vent upward toward the termination at 1/4 in per foot (2% grade).
- Support all vent runs and the vent termination.
- Seal the air intake and exhaust connections on the flue and vent lines.
- Install termination screen caps on the exhaust and intake pipes.
- Check the venting for leaks.
- Confirm the vent termination is at least 12 in (300 mm) above exterior grade.
- Confirm make-up air is sufficient.
- Confirm total vent length is within the maximum allowed.
Applies to: NPF700 series (all listed models)
More furnace guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NPF installation and operation manual, p. 93. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.