Installation checklist: location, clearances and gas supply
What is going on
Confirm before commissioning that the location and gas supply are correct. Each item must be a yes before the install is complete.
Check in this order
- Confirm required clearances from building openings and intake vents, and keep the vent termination as close to the furnace as practical.
- Confirm service clearances, make-up air and that the area is free of dust, corrosive elements and flammable vapors.
- Confirm the furnace and vent piping are clear of combustibles such as clothing, cleaning materials and rags.
- Install the pressure relief valve. If auto water fill is not used, fill the water tank manually. If auto fill is used, confirm the water line is installed.
- Confirm the gas supply type matches the rating plate.
- Confirm the gas line is at least 1/2 in or 3/4 in ID and is long and large enough to deliver the required BTU load.
- Measure the gas supply line pressure and confirm it is inside the range in the manual.
- Confirm a manual gas shut-off valve is installed.
- Pressure-test the gas line and all fittings for leaks.
- Confirm the gas company has inspected the installation if required.
Applies to: NPF700 series (all listed models)
More furnace guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NPF installation and operation manual, p. 92. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.