Navien · Furnace troubleshooting

Condensate drain piping to floor drain, sump or pump

NDF

What is going on

Condensate from the trap outlet must go to a floor drain, sump pit, or a condensate pump if neither is available. Any pump used must be rated for furnace condensate. A 1/2 in. CPVC tee on the trap outlet gives a vent branch and a drain branch.

Likely causes

  • Vapor lock if the tee vent branch is missing or the line has a low point
  • Drain blockage if the overflow vent is omitted

Check in this order

  1. Route condensate from the trap outlet to a floor drain, sump pit, or approved condensate pump.
  2. Fit a 1/2 in. CPVC tee to the trap outlet with the branches vertical.
  3. Add a 1 in. (25 mm) piece of 1/2 in. CPVC to the upper branch as a vent and overflow.
  4. Connect the lower branch to the drain using 5/8 in. ID / 7/8 in. OD flexible tubing, or run CPVC to the drain.
  5. Do not cement the drain assembly to the trap outlet if the trap may need removal later; use a piece of the supplied 1/2 in. hose instead.

Applies to: NDF condensate drain system

More furnace guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NDF Installation and Operation Manual, p. 44. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.