Navien · Boiler troubleshooting
Zone valve system piping (primary/secondary)
What is going on
Piping layout for a multi-zone system using zone valves, with an air separator, expansion tank, pressure reducing valve and backflow preventer.
Check in this order
- Install a NaviClean filter in the system return to remove debris.
- Use a pump with an integral check valve, or fit a check valve at the pump outlet.
- Make up water connections per the 'Filling the Water System' section (p. 110) and follow local codes.
- Wire the zone valves per the zone valve wiring diagram (p. 44).
Applies to: NCB700 zone valve systems
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NCB700 installation and operation manual, p. 32. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.