Vent pipe pitch and solvent cement joints
What is going on
Horizontal runs must slope up toward the termination. Use approved primer and cement and keep the work area ventilated.
Likely causes
- Cold ambient temperatures below 32 °F (0 °C) lengthen cure time
Check in this order
- Slope horizontal vent sections upward toward the termination at 1/4 in per foot (2% slope).
- Ventilate the work area or wear an approved organic vapor respirator.
- Spread an even layer of solvent cement inside the fitting and on the outside of the pipe.
- Push the pipe into the fitting and twist it a quarter turn.
- Hold the joint together for about 15 seconds until the cement sets.
- Check that the cement was made less than 2 years before use.
- Keep pipe ends straight, chamfered and deburred. Fully tighten all joints.
- Never apply force or impact to pipes after connections are made.
Applies to: NCB700 common vent piping
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NCB700 Installation & Operation Manual, pp. 92. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.