Navien · Boiler troubleshooting
Setting up cascade communication
What is going on
Assign the NCB700 as main unit and allocate each NPE water heater as a sub unit.
Check in this order
- On the main NCB700 panel, press Back and Menu together for 3 seconds, then select 4. Cascade Status and Set.
- Turn the Command dial to move between parameters, or to change a value.
- Press the Command dial to select 1. Cascade System Setting, then select START.
- On the sub NPE-A2 panel, press and hold the OK button for 3 seconds. The display shows ID 1. Allocated! and a sub unit icon.
- Repeat for each remaining sub water heater. To add a sub unit later, repeat this step.
- On the main NCB700 panel, press the Command dial when the prompt appears. Configured heater displays return to temperature display.
- To reassign the main unit, repeat the whole procedure.
Applies to: NCB700 main unit with NPE-A2 sub units
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NCB700 installation and operation manual, p. 87-88. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.