Navien · Boiler troubleshooting

Setting up cascade communication

NCB700

What is going on

Assign the NCB700 as main unit and allocate each NPE water heater as a sub unit.

Check in this order

  1. On the main NCB700 panel, press Back and Menu together for 3 seconds, then select 4. Cascade Status and Set.
  2. Turn the Command dial to move between parameters, or to change a value.
  3. Press the Command dial to select 1. Cascade System Setting, then select START.
  4. On the sub NPE-A2 panel, press and hold the OK button for 3 seconds. The display shows ID 1. Allocated! and a sub unit icon.
  5. Repeat for each remaining sub water heater. To add a sub unit later, repeat this step.
  6. On the main NCB700 panel, press the Command dial when the prompt appears. Configured heater displays return to temperature display.
  7. To reassign the main unit, repeat the whole procedure.

Applies to: NCB700 main unit with NPE-A2 sub units

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NCB700 installation and operation manual, p. 87-88. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.