Navien · Boiler troubleshooting
Installing the condensate siphon loop on a cascade system
What is going on
The condensate drain forms a siphon loop that must be primed with water before the boiler runs.
Check in this order
- Form a loop in the field-supplied drain hose and secure it with a tie. Do not kink the hose or tie it too tight.
- Prime the loop with tap water. Water in the hose must be above 7.9 in (200 mm) and must be present before the boiler runs.
- Connect the hose to the cascade system and route the end to a drain.
- Check that the loop still holds water before each operation.
Applies to: NCB700-190/060, NCB700-190/080, NCB700-240/110, NCB700-240/130, NCB700-250/150
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NCB700 installation and operation manual, p. 103. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.