Heating loop flow direction and accessory placement
What is going on
Water must flow through the manifold in one direction, and accessories go on the heating supply side.
Check in this order
- Route water from right to left heating return enters from the right side of the manifold.
- Heating supply exits from the left side of the manifold.
- Install any required accessories such as an air separator with expansion tank, pump and check valve on the heating supply side, as shown in the manual's piping figure.
- Service and drain ports are on the service valves; use them as needed for flushing and filling.
Applies to: NCB-H and NFC Series boiler with primary manifold
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NCB-H, NFC Series Primary Manifold installation instructions, p. 2. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.