Hardwiring the boiler directly to the power supply (no plug)
What is going on
Used only where local code requires direct wiring. Remove the factory plug and splice the boiler leads to a field-supplied 110-120V supply.
Check in this order
- Disconnect the power supply to the boiler.
- Cut the factory power cord about 2 in. below the bottom of the cabinet and discard the cord.
- Remove the 4 screws holding the front cover and open it.
- Locate the black (hot), white (neutral) and green (ground) wires connected to the cord. Cut them as close as possible to where the cord ends.
- Strip about 1/2 in. of sheathing from each wire.
- Connect the 110-120V AC supply conductors to the bare wires with field-supplied twist-on connectors or wire nuts.
- Make sure the boiler is grounded. Do not use gas or water pipes as the ground path.
Applies to: NCB700 boilers wired without the factory plug
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NCB700 installation and operation manual, p. 80. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.