Navien · Boiler troubleshooting
Gas orifice change for LP or high altitude
What is going on
Procedure to swap the gas orifice and convert the boiler.
Check in this order
- Turn off electrical power, close the manual gas shut-off valve, and let the boiler cool.
- Turn off the gas and water supply.
- Remove the four front cover screws and set the front cover aside.
- Remove the two screws below the gas valve and detach the gas inlet pipe.
- Remove the four screws at the fan motor assembly and pull the gas valve away to access the orifice.
- Remove the two screws holding the orifice, then remove the orifice and gasket.
- Install the correct orifice from the approved kit, making sure the gasket is seated.
- Reinstall the gas inlet pipe and secure all screws without overtightening.
- Set DIP switches for gas type and altitude.
- Leak test, then verify CO2 and offset as described for gas/air ratio adjustment.
Applies to: NCB700 gas conversion
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NCB700 installation and operation manual, p. 138. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.