Navien · Boiler troubleshooting

Flexible polypropylene or stainless vent installation

NCB700

What is going on

Flexible vent pipe is only allowed in a vertical run through the roof with indirect venting. Horizontal terminations are not allowed.

Check in this order

  1. Route all flexible vent pipe vertically through the roof. No horizontal terminations.
  2. Use proper adapters and supports to finish the install.
  3. Connect 2 in Innoflue Flex pipe to the exhaust with a 2 in snap-fit coupler or Innoflue single wall residential vent pipe.
  4. Make sure every joint is tightly sealed after installation.
  5. Use the flexible vent only for indirect venting.
  6. Check the flexible vent maximum length in the table for the model and vent diameter.

Applies to: NCB700 flexible vent installs

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NCB700 installation and operation manual, p. 76-77. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.