Fill and leak test the water system

NCB700

What is going on

Fill test to confirm the water system is installed correctly before firing the burner.

Check in this order

  1. Confirm water chemistry meets the limits before filling.
  2. Open the pressure relief valve by lifting the lever on top, and loosen the air vent cap.
  3. Loosen the manual and automatic air vents and close the boiler drain valve.
  4. Fill the boiler to the correct system pressure. Typical cold fill for a residential system is 12 psi. Never exceed the relief valve setting.
  5. Close the pressure relief valve when the system is full, and make sure it is closed before testing or operating.
  6. At initial fill and during start-up and testing, check the whole system for leaks and repair any before continuing.
  7. Keep the boiler full of water before firing the burner.

Applies to: NCB700 water system

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NCB700 installation and operation manual, p. 110. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.