Navien · Boiler troubleshooting
External water fill connection
What is going on
An external water fill can be fitted to the system piping where an application needs it. The example system includes an air separator, relief valve, pump, expansion tank, backflow preventer and pressure reducing valve.
Check in this order
- Install the make-up water connection on the system piping per the example layout.
- Include a backflow preventer and pressure reducing valve on the make-up supply.
- Place the air separator where it has guaranteed positive pressure, close to the water fill and expansion tank.
- Install an optional overflow bypass where the layout calls for it.
- If there is insufficient fall for drainage, add a condensate drainage pump rated for boiler use.
Applies to: NCB700 system water fill
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NCB700 installation and operation manual, p. 28. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.