External LWCO wiring

NCB700

What is going on

Typical wiring for a terminal-type low water cutoff (LWCO) where the boiler supplies 24 VAC to the LWCO power terminals.

Check in this order

  1. Turn off the power to the boiler before working on the terminal strips.
  2. The boiler supplies 24 VAC at the LWCO power terminals (CNC3).
  3. Connect the LWCO to the boiler LWCO terminals.
  4. Use a jumper between the LWCO and the neutral as shown in the wiring diagram, with the same voltage for control and burner circuit.
  5. Verify proper operation after servicing.

Applies to: NCB700 with external LWCO

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NCB700 installation and operation manual, p. 39. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.