Navien · Boiler troubleshooting

Exhaust venting installation

NFB

What is going on

Vent per the approved Category IV system and keep the termination clearances.

Check in this order

  1. Use only approved vent materials PVC/CPVC Schedule 40 or 80 solid core, approved polypropylene or approved stainless steel (USA).
  2. In Canada, use Type BH special gas vent Class IIA (PVC), IIB (CPVC) or IIC (polypropylene/stainless steel), certified to ULC-S636.
  3. Do not mix components from different vent system manufacturers.
  4. Keep at least 12 in above the highest anticipated snow level or grade for roof or vertical terminations (18 in in Canada).
  5. Keep at least 12 in clearance from any obstruction for the termination.
  6. Keep the vent within the maximum length and elbow limits in the venting table.

Applies to: NFB-301C/399C

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NFB-C quick installation guide, p. 3. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.