Navien · Boiler troubleshooting

Electrical connections

NFB

What is going on

Power and external control connections on the main PCB.

Check in this order

  1. Disconnect power before making any wire connections on the main PCB.
  2. Supply 120 V AC, 60 Hz, minimum 2 A, with proper grounding.
  3. Wire the external LWCO if required by local codes; confirm the built-in device meets code.
  4. Do not operate with abnormally high or low AC voltage.

Applies to: NFB-301C/399C

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NFB-C quick installation guide, p. 3. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.