Navien · Boiler troubleshooting

DHW piping guidelines

NCB700

What is going on

Use only fittings and components approved for potable water. Keep hot water piping short. Do not add pressure control valves, flow restrictors or mechanical mixing valves on the direct DHW line unless local code requires them.

Check in this order

  1. Use only potable-water approved pipe, fittings, valves and solder.
  2. Tighten connections carefully to avoid damage.
  3. Fit unions and manual shut-offs on domestic cold and hot lines.
  4. Keep the hot water run as short as practical.
  5. Insulate DHW supply and recirculation lines if applicable. Do not cover drains or the relief valve.
  6. After installation, clean the cold water inlet filter, test DHW supply and check for leaks.
  7. Tell the owner the inlet filter must be cleaned periodically.

Applies to: NCB700 DHW piping

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NCB700 installation and operation manual, p. 25. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.