Connecting the vent pipe to the common vent collar

NCB700

What is going on

Seat the vent pipe fully in the collar and secure it so the joint is gas-tight.

Check in this order

  1. Cut the pipe square at 90 degrees and deburr it before fitting.
  2. Mark the pipe 1-1/2 in (38 mm) from its end.
  3. Lubricate the pipe end with water only. Do not use grease.
  4. Push the pipe into the collar with a twisting motion until it bottoms out. The mark should disappear.
  5. Tighten the four mounting screws supplied with the collar.
  6. Do not use primer or cement on the appliance connection.
  7. With the front cover removed, connect the supplied VID jumper wire to the wire labelled VID.

Applies to: NCB700-190/060, NCB700-190/080, NCB700-240/110, NCB700-240/130, NCB700-250/150

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NCB700 installation and operation manual, p. 97. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.