Navien · Boiler troubleshooting
Connecting main trunk pipes and fitting the vent end
What is going on
Join the trunk runs between wye assemblies and finish the open ends of the intake and exhaust.
Check in this order
- Connect the main trunk pipe to each side of the wye joint or wye assembly.
- Join each trunk pipe to the other wye assembly. See 'Connecting Pipes with Cement' on p. 92.
- Bubble test all joints after the boiler is installed and filled.
- Fit end caps, pipe elbows or tee joints to the open ends of the intake and exhaust pipes.
- A field-supplied termination screen is optional.
Applies to: NCB700-190/060, NCB700-190/080, NCB700-240/110, NCB700-240/130, NCB700-250/150
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NCB700 installation and operation manual, p. 100. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.