Navien · Boiler troubleshooting
Condensate drain connection
What is going on
Condensate must drain from the 3/4 in condensate outlet, and the trap must be primed with water.
Check in this order
- Connect the drain pipe to the 3/4 in NPT condensate outlet at the bottom of the unit.
- Pour water into the exhaust connection to fill the condensate trap.
- Drain the pipe end to a laundry tub or floor drain, or use an allowed external drain, neutralizer or condensate pump.
- Do not submerge the pipe end in water.
Applies to: NFB-301C/399C
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NFB-C quick installation guide, p. 2. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.