Navien · Boiler troubleshooting

Choosing an approved vent termination

NCB700

What is going on

Only use the vent terminations and vent components the manual lists for this boiler. Use the same manufacturer's termination as the vent system. Follow the vent maker's own installation instructions. Several PVC, polypropylene and stainless steel (AL29-4C) kits are approved; the part numbers are listed in the setting table for approved terminations.

Check in this order

  1. Confirm the vent material (PVC, polypropylene or AL29-4C stainless) before ordering a termination.
  2. Pick a termination from the approved list for that material and vent diameter (2 in or 3 in).
  3. Do not mix manufacturers between the vent system and the termination.
  4. Follow the vent manufacturer's instructions for the termination install.

Applies to: All NCB700 models, venting for combustion air

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NCB700 installation and operation manual, p. 72. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.