Navien · Boiler troubleshooting

Cascade piping considerations

NCB700

What is going on

General piping rules for a cascade system. Diagrams are for concept only.

Check in this order

  1. Turn off power to all units while piping.
  2. Install a NaviClean filter in the system heating return to remove debris.
  3. Use pumps with integral check valves, or add check valves at the pump outlets.
  4. Provide make-up water connections as described in the water fill section and follow local codes.
  5. Keep recirculation flow at 2-4 GPM for each NPE-A2 water heater connected to the recirculation line.
  6. If there are too many NPE-A2 units for the recirculation line, set the unconnected ones to Internal Recirculation Mode.

Applies to: NCB700 cascade systems

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NCB700 installation and operation manual, p. 83. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.