Navien · Boiler troubleshooting
Cascade piping considerations
What is going on
General piping rules for a cascade system. Diagrams are for concept only.
Check in this order
- Turn off power to all units while piping.
- Install a NaviClean filter in the system heating return to remove debris.
- Use pumps with integral check valves, or add check valves at the pump outlets.
- Provide make-up water connections as described in the water fill section and follow local codes.
- Keep recirculation flow at 2-4 GPM for each NPE-A2 water heater connected to the recirculation line.
- If there are too many NPE-A2 units for the recirculation line, set the unconnected ones to Internal Recirculation Mode.
Applies to: NCB700 cascade systems
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NCB700 installation and operation manual, p. 83. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.