Navien · Boiler troubleshooting
Before working on controls or wiring
What is going on
Electrical and commissioning precautions when servicing the boiler.
Check in this order
- Shut off or disconnect power before removing the front cover.
- Do not handle the power cord or internal components with wet hands.
- Label all cables before disconnecting them to avoid wiring errors.
- Open water and gas fully before lighting the boiler. Do not light it otherwise, as the boiler can be damaged.
- After any service, check that the boiler operates correctly.
Applies to: All NCB700 models
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: navien_ncb700-installation-and-operation-manual.pdf, p. 165 and p. 166. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.