Navien · Boiler troubleshooting
Attaching an extension kit (in-line setup)
What is going on
Adds rack sections for more boilers in an in-line layout.
Check in this order
- Connect the extension rack to the single frame using the fixed brackets.
- Use M10 bolts (3 in and 4 in) for the connection.
- Up to 9 extension kits (10 units total) can be assembled.
Applies to: Ready-Link Commercial rack, in-line setup
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Ready-Link Commercial Rack System installation guide, p. 1, p. 2. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.