Navien · Boiler troubleshooting
Assembling the wye joint on the common vent
What is going on
Build the vent run from the collar using wye fittings. Tees can be used instead of wyes.
Check in this order
- Cement a hub wye, 2 in reducer and 90 degree elbow together, or use a hub reducing wye and 90 degree elbow.
- Slide the vent pipe fully into the collar until it contacts the bottom of the socket.
- Tighten the collar clamp with an 8 mm socket to seal the joint.
- Start the vent run with a length of straight pipe. Never start it with a street elbow at the collar.
- Keep the pipe from the unit to the main trunk within 16 ft equivalent length.
Applies to: NCB700-190/060, NCB700-190/080, NCB700-240/110, NCB700-240/130, NCB700-250/150
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Navien NCB700 installation and operation manual, p. 98. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.