Mounts heating supply, heating return and gas pipe supports.
Check in this order
- Fix the heating supply bracket to a post bar with 3 M10 bolts (3 in).
- Fix the heating supply bracket to the front lower bracket with 1 M10 bolt (1 in).
- Fix the heating return bracket to a post bar with 3 M10 bolts (3 in).
- Fix the heating return bracket to the front lower bracket with 2 M10 bolts (1 in).
- Fix the gas pipe bracket to a base frame with 2 M10 bolts (3 in).
- Repeat the first three steps for the other foot bar.
Applies to: Ready-Link Commercial rack, pipe supports
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Ready-Link Commercial Rack System installation guide, p. 2. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.